Planning application
Land Adjacent To Purple House Preston Road Kingston Upon Hull
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of 24 dwellings and associated works and landscaping
As published by the council, reference 25/00673/FULL
Application record
- Reference
- 25/00673/FULL
- Type
- Full Planning Permission
- Status
- Pending Decision
- Received
- 24 Jul 2025
- Validated
- 28 Oct 2025
- Ward
- Southcoates
Timeline
Dates from the published record
-
24 Jul 2025
Received by Kingston upon Hull, City of
-
28 Oct 2025
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Kingston upon Hull, City of took a median of 59 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Hodson Architects Ltd Agent, an architecture practice registered in Cleethorpes
Active · incorporated 2003 · Cleethorpes
95 applications on PlanIndex · across 4 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
148 documents on file for this application
- DRAFT LEGAL AGREEMENT
- URBAN FORESTRY COMMENTS
- COMMENTS FROM THE FLOOD TEAM
- DRAINAGE LAYOUT
- SURFACE WATER HYDRAULIC CALCULATIONS
- BNG METRIC
- BNG SUPPLEMENTARY
- BNG SUPPLEMENTARY PLAN
- DRAINAGE LAYOUT
- SURFACE WATER HYDRAULIC CALCULATIONS
- DRAINAGE DETAILS SHEET 1
- DRAINAGE DETAILS SHEET 2
- DRAINAGE DETAILS SHEET 3
- DRAINAGE DETAILS SHEET 5
- DRAINAGE DETAILS SHEET 4
- PEA
- ARBORICULTURAL IMPACT ASSESSMENT
- DRAINAGE STRATEGY REPORT
- BIODIVERSITY OFFICER COMMENTS
- BIKES AND BIN STORAGE
- OPEN SPACE REQUIREMENTS
- YORKSHIRE WATER COMMENTS
- PRESS NOTICE
- HUMBER ARCHAEOLOGY COMMENTS
- COMMENTS FROM THE FLOOD TEAM
- ENVIRONMENT AGENCY COMMENTS
- HIGHWAYS COMMENTS
- URBAN DESIGN COMMENTS
- HIGHWAYS COMMENTS
- PUBLIC COMMENT (PA)
- E-MAIL FROM ENVIRONMENT AGENCY
- ENVIRONMENTAL HEALTH COMMENTS
- PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN
- BUILDING FOR HEALTHY LIFE
- PROPOSED FIRST FLOOR GENERAL ARRANGEMENT PLAN
- PROPOSED ROOF GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED FRONT ELEVATION 1
- PROPOSED FRONT ELEVATION 1
- PROPOSED REAR ELEVATION 1
- PROPOSED SIDE ELEVATION 1
- PROPOSED FRONT ELEVATION 1
- PROPOSED REAR ELEVATION 1
- PROPOSED SIDE ELEVATION 1
- AFFORDABLE HOUSING STATEMENT 1
- BNG SUPPLEMENTARY 1
- PROPOSED SITE PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- SITE LOCATION PLAN
- SITE PLAN AS EXISTING
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- CHECKSHEET
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED REAR ELEVATION 1
- PROPOSED SIDE ELEVATION 1
- PROPOSED BLOCK PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- PROPOSED GENERAL ARRANGEMENT PLAN 1
- EMAIL FROM AGENT 27.10.25
- SITE LOCATION PLAN
- SITE PLAN AS EXISTING
- PROPOSED BLOCK PLAN
- PROPOSED SITE PLAN
- PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN
- PROPOSED FIRST FLOOR GENERAL ARRANGEMENT PLAN
- PROPOSED ROOF GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- BLOCK 01 - PROPOSED FRONT ELEVATION
- BLOCK 01 - PROPOSED SIDE ELEVATION
- BLOCK 02 - PROPOSED FRONT ELEVATION
- BLOCK 03 - PROPOSED SIDE ELEVATION
- BUILDING FOR HEALTHY LIFE
- PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- BLOCK 01 - PROPOSED SIDE ELEVATION
- BLOCK 02 - PROPOSED SIDE ELEVATION
- BLOCK 03 - PROPOSED FRONT ELEVATION
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED GENERAL ARRANGEMENT PLAN
- BLOCK 02 - PROPOSED REAR ELEVATION
- BLOCK 03 - PROPOSED REAR ELEVATION
- EMAIL 06 10 2025 10.22
- E-MAIL FROM AGENT
- OFFICER EMAIL 10 OCT
- BIODIVERSITY NET GAIN SUPPLEMENTARY
- E-MAIL FROM AGENT
- BNG METRIC CALCULATION
- E-MAIL FROM AGENT
- APPLICATION FORM
- TREE CONSTRAINTS
- FLOOD RISK ASSESSMENT
- DESIGN AND ACCESS STATEMENT
- BLOCK 03 PROPOSED SIDE ELEVATIONS
- BLOCK 03 PROPOSED REAR ELEVATIONS
- BLOCK 03 PROPOSED FRONT ELEVATIONS
- BLOCK 02 PROPOSED SIDE ELEVATIONS
- BLOCK 02 PROPOSED REAR ELEVATIONS
- BLOCK 02 PROPOSED FRONT ELEVATIONS
- BLOCK 01 PROPOSED SIDE ELEVATIONS
- BLOCK 01 PROPOSED REAR ELEVATIONS
- BLOCK 01 PROPOSED FRONT ELEVATIONS
- HTC5 PROPOED GENERAL ARRANGEMENT PLAN
- HTC4 PROPOED GENERAL ARRANGEMENT PLAN
- HTC3 PROPOED GENERAL ARRANGEMENT PLAN
- HTC2 PROPOED GENERAL ARRANGEMENT PLAN
- HTC1 PROPOED GENERAL ARRANGEMENT PLAN
- HTC PROPOSED GENERAL ARRANGEMENT PLAN
- HT B5 PROPOSED GENERAL ARRANGEMENT PLAN
- HT B4 PROPOSED GENERAL ARRANGEMENT PLAN
- HT B3 PROPOSED GENERAL ARRANGEMENT PLAN
- HT B2 PROPOSED GENERAL ARRANGEMENT PLAN
- HT B1 PROPOSED GENERAL ARRANGEMENT PLAN
- HT B PROPOSED GENERAL ARRANGEMENT PLAN
- HT A2 PROPOSED GENERAL ARRANGEMENT PLAN
- HT A1 PROPOSED GENERAL ARRANGEMENT PLAN
- HT A PROPOSED GENERAL ARRANGEMENT PLAN
- PROPOSED ROOD GENERAL ARRANGEMENT
- PROPOSED FIRST FLOOR GENERAL ARRANGEMENT
- PROPOSED GROUND FLOOR GENERAL ARRANGEMENT
- PROPOSED SITE PLAN
- PROPOSED BLOCK PLAN
- SITE PLAN AS EXISTING
- SITE LOCATION PLAN
- BIODIVERSITY METRIC CALCULATION
- BACKGROUND PAPERS
- TREE SURVEY
- DRAINAGE STRATEGY
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 88 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Kingston upon Hull, City of
-
26/00964/FULL Awaiting decision
37 Philip Larkin Close Kingston Upon Hull HU6 7FB
Change of use of a single dwelling house into a 3 bed House in Multiple Occupation
-
26/00948/FULL Awaiting decision
24-25 Bishop Lane Kingston Upon Hull HU1 1PA
Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason
-
26/00827/FULL Granted
4 Sunbeam Road Kingston Upon Hull HU4 6DZ
1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).
-
26/00820/FULL Granted
36 Constable Street Kingston Upon Hull HU3 3BL
Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)
-
26/00335/FULL Granted
Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU
1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.