Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Adjacent To Purple House Preston Road Kingston Upon Hull

Awaiting decision Kingston upon Hull, City of 25/00673/FULL Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 24 dwellings and associated works and landscaping

As published by the council, reference 25/00673/FULL

Application record

Reference
25/00673/FULL
Type
Full Planning Permission
Status
Pending Decision
Received
24 Jul 2025
Validated
28 Oct 2025
Ward
Southcoates

Timeline

Dates from the published record

  1. 24 Jul 2025

    Received by Kingston upon Hull, City of

  2. 28 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Kingston upon Hull, City of took a median of 59 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Hodson Architects Ltd Agent, an architecture practice registered in Cleethorpes

Active · incorporated 2003 · Cleethorpes

95 applications on PlanIndex · across 4 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

148 documents on file for this application

  • DRAFT LEGAL AGREEMENT Other · 05 Jun 2026
  • URBAN FORESTRY COMMENTS Correspondence · 23 Apr 2026
  • COMMENTS FROM THE FLOOD TEAM Correspondence · 16 Apr 2026
  • DRAINAGE LAYOUT Drawing · 02 Apr 2026
  • SURFACE WATER HYDRAULIC CALCULATIONS BackGround Papers · 02 Apr 2026
  • BNG METRIC Other · 12 Mar 2026
  • BNG SUPPLEMENTARY Other · 12 Mar 2026
  • BNG SUPPLEMENTARY PLAN Other · 12 Mar 2026
  • DRAINAGE LAYOUT Drawing · 09 Mar 2026
  • SURFACE WATER HYDRAULIC CALCULATIONS Drawing · 09 Mar 2026
  • DRAINAGE DETAILS SHEET 1 Drawing · 06 Mar 2026
  • DRAINAGE DETAILS SHEET 2 Drawing · 06 Mar 2026
  • DRAINAGE DETAILS SHEET 3 Drawing · 06 Mar 2026
  • DRAINAGE DETAILS SHEET 5 Drawing · 06 Mar 2026
  • DRAINAGE DETAILS SHEET 4 Drawing · 06 Mar 2026
  • PEA Report · 12 Feb 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Other · 06 Jan 2026
  • DRAINAGE STRATEGY REPORT Report · 15 Dec 2025
  • BIODIVERSITY OFFICER COMMENTS Correspondence · 09 Dec 2025
  • BIKES AND BIN STORAGE Drawing · 27 Nov 2025
  • OPEN SPACE REQUIREMENTS Correspondence · 27 Nov 2025
  • YORKSHIRE WATER COMMENTS Correspondence · 21 Nov 2025
  • PRESS NOTICE Other · 20 Nov 2025
  • HUMBER ARCHAEOLOGY COMMENTS Correspondence · 20 Nov 2025
  • COMMENTS FROM THE FLOOD TEAM Correspondence · 20 Nov 2025
  • ENVIRONMENT AGENCY COMMENTS Correspondence · 20 Nov 2025
  • HIGHWAYS COMMENTS Correspondence · 13 Nov 2025
  • URBAN DESIGN COMMENTS Correspondence · 13 Nov 2025
  • HIGHWAYS COMMENTS Correspondence · 13 Nov 2025
  • PUBLIC COMMENT (PA) Public Comment · 09 Nov 2025
  • E-MAIL FROM ENVIRONMENT AGENCY Correspondence · 04 Nov 2025
  • ENVIRONMENTAL HEALTH COMMENTS Correspondence · 04 Nov 2025
  • PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN Drawing · 30 Oct 2025
  • BUILDING FOR HEALTHY LIFE Other · 30 Oct 2025
  • PROPOSED FIRST FLOOR GENERAL ARRANGEMENT PLAN Drawing · 30 Oct 2025
  • PROPOSED ROOF GENERAL ARRANGEMENT PLAN Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED FRONT ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED FRONT ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED REAR ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED SIDE ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED FRONT ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED REAR ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED SIDE ELEVATION 1 Drawing · 30 Oct 2025
  • AFFORDABLE HOUSING STATEMENT 1 Other · 30 Oct 2025
  • BNG SUPPLEMENTARY 1 Other · 30 Oct 2025
  • PROPOSED SITE PLAN Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • SITE LOCATION PLAN Drawing · 30 Oct 2025
  • SITE PLAN AS EXISTING Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • CHECKSHEET BackGround Papers · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED REAR ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED SIDE ELEVATION 1 Drawing · 30 Oct 2025
  • PROPOSED BLOCK PLAN Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN 1 Drawing · 30 Oct 2025
  • EMAIL FROM AGENT 27.10.25 Correspondence · 27 Oct 2025
  • SITE LOCATION PLAN Drawing · 16 Oct 2025
  • SITE PLAN AS EXISTING Application Form · 16 Oct 2025
  • PROPOSED BLOCK PLAN Application Form · 16 Oct 2025
  • PROPOSED SITE PLAN Application Form · 16 Oct 2025
  • PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED FIRST FLOOR GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED ROOF GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • BLOCK 01 - PROPOSED FRONT ELEVATION Drawing · 16 Oct 2025
  • BLOCK 01 - PROPOSED SIDE ELEVATION Drawing · 16 Oct 2025
  • BLOCK 02 - PROPOSED FRONT ELEVATION Drawing · 16 Oct 2025
  • BLOCK 03 - PROPOSED SIDE ELEVATION Drawing · 16 Oct 2025
  • BUILDING FOR HEALTHY LIFE BackGround Papers · 16 Oct 2025
  • PROPOSED GROUND FLOOR GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • BLOCK 01 - PROPOSED SIDE ELEVATION Drawing · 16 Oct 2025
  • BLOCK 02 - PROPOSED SIDE ELEVATION Drawing · 16 Oct 2025
  • BLOCK 03 - PROPOSED FRONT ELEVATION Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 16 Oct 2025
  • BLOCK 02 - PROPOSED REAR ELEVATION Drawing · 16 Oct 2025
  • BLOCK 03 - PROPOSED REAR ELEVATION Drawing · 16 Oct 2025
  • EMAIL 06 10 2025 10.22 Correspondence · 15 Oct 2025
  • E-MAIL FROM AGENT Correspondence · 13 Oct 2025
  • OFFICER EMAIL 10 OCT Correspondence · 10 Oct 2025
  • BIODIVERSITY NET GAIN SUPPLEMENTARY BackGround Papers · 07 Oct 2025
  • E-MAIL FROM AGENT Correspondence · 07 Oct 2025
  • BNG METRIC CALCULATION BackGround Papers · 07 Oct 2025
  • E-MAIL FROM AGENT Correspondence · 06 Oct 2025
  • EMAIL Correspondence · 28 Aug 2025
  • APPLICATION FORM Application Form · 25 Jul 2025
  • TREE CONSTRAINTS BackGround Papers · 24 Jul 2025
  • FLOOD RISK ASSESSMENT BackGround Papers · 24 Jul 2025
  • DESIGN AND ACCESS STATEMENT BackGround Papers · 24 Jul 2025
  • BLOCK 03 PROPOSED SIDE ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 03 PROPOSED REAR ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 03 PROPOSED FRONT ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 02 PROPOSED SIDE ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 02 PROPOSED REAR ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 02 PROPOSED FRONT ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 01 PROPOSED SIDE ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 01 PROPOSED REAR ELEVATIONS Drawing · 24 Jul 2025
  • BLOCK 01 PROPOSED FRONT ELEVATIONS Drawing · 24 Jul 2025
  • HTC5 PROPOED GENERAL ARRANGEMENT PLAN Drawing · 24 Jul 2025
  • HTC4 PROPOED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HTC3 PROPOED GENERAL ARRANGEMENT PLAN Drawing · 24 Jul 2025
  • HTC2 PROPOED GENERAL ARRANGEMENT PLAN Drawing · 24 Jul 2025
  • HTC1 PROPOED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HTC PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT B5 PROPOSED GENERAL ARRANGEMENT PLAN Drawing · 24 Jul 2025
  • HT B4 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT B3 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT B2 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT B1 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT B PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT A2 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT A1 PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • HT A PROPOSED GENERAL ARRANGEMENT PLAN Application Form · 24 Jul 2025
  • PROPOSED ROOD GENERAL ARRANGEMENT Drawing · 24 Jul 2025
  • PROPOSED FIRST FLOOR GENERAL ARRANGEMENT Application Form · 24 Jul 2025
  • PROPOSED GROUND FLOOR GENERAL ARRANGEMENT Application Form · 24 Jul 2025
  • PROPOSED SITE PLAN Application Form · 24 Jul 2025
  • PROPOSED BLOCK PLAN Drawing · 24 Jul 2025
  • SITE PLAN AS EXISTING Application Form · 24 Jul 2025
  • SITE LOCATION PLAN Drawing · 24 Jul 2025
  • BIODIVERSITY METRIC CALCULATION BackGround Papers · 24 Jul 2025
  • BACKGROUND PAPERS BackGround Papers · 24 Jul 2025
  • TREE SURVEY BackGround Papers · 24 Jul 2025
  • DRAINAGE STRATEGY BackGround Papers · 24 Jul 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Kingston upon Hull, City of

  • 26/00964/FULL Awaiting decision

    37 Philip Larkin Close Kingston Upon Hull HU6 7FB

    Change of use of a single dwelling house into a 3 bed House in Multiple Occupation

    Received 5 Oct, published by the council 11 Oct 2026 Full applications
  • 26/00948/FULL Awaiting decision

    24-25 Bishop Lane Kingston Upon Hull HU1 1PA

    Re-roofing to No 24 - 25 Bishop Lane. The proposed roof will be a combination of pitched and flat roof, the only public realm it will be visible from is Bishop Lane. The application drawing only includes the Bishop Lane elevation because of this reason

    Received 30 Sep, published by the council 11 Oct 2026 Full applications
  • 26/00827/FULL Granted

    4 Sunbeam Road Kingston Upon Hull HU4 6DZ

    1. Erection of a single storey side extension 5.95m (length) x 2.27m (width) x 3.415m (max height) 2. Construction of new roof to existing rear extensions and new dual pitched roof conservatory to replace existing conservatory to rear 4.025m (max height) x 4.94m (width) x 3.13m (long).

    Received 22 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00820/FULL Granted

    36 Constable Street Kingston Upon Hull HU3 3BL

    Erection of a part two and single storey rear extension (5.3m (length) x 5m (width) x 5.26m (max height)

    Received 20 Aug, published by the council 27 Aug 2026 Full applications
  • 26/00335/FULL Granted

    Martello Hotel 309-323 Hedon Road Kingston Upon Hull HU9 1NU

    1. Change of use from Class C1 hotel/serviced apartments, to mixed use Class C1 hotel/serviced apartments and gym (Class E) for use by guests and the public. 2. Formation of first floor roof terrace with composite decking and timber fencing, including 2 x bedrooms converted to 2 x kitchenettes. 3. Installation of 3 x new doors and cladding.

    Received 10 Apr, published by the council 21 Jul 2026 Full applications