Planning application
Adjacent To Craven Park Preston Road Kingston Upon Hull
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Mixed use development comprising retail, commercial and leisure uses
As published by the council, reference 25/00529/FULL
Application record
- Reference
- 25/00529/FULL
- Type
- Full Planning Permission
- Status
- Pending Decision
- Received
- 11 Jun 2025
- Validated
- 11 Jun 2025
- Ward
- Marfleet
Timeline
Dates from the published record
-
11 Jun 2025
Received by Kingston upon Hull, City of
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Kingston upon Hull, City of took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
332 documents on file for this application
- GROUND FLOOR PLANS COLOURED
- PROPOSED SITE PLAN - ROOF PLANS - COLOURED
- ELEVATIONS 1 OF 2
- GROUND FLOOR PLAN
- HIGHWAYS COMMENTS
- E-MAIL FROM NATIONAL HIGHWAYS
- E-MAIL FROM NATIONAL HIGHWAYS
- CYCLOPS SIGNALISED JUNCTION CONCEPT DESIGN
- E-MAIL FROM NATIONAL HIGHWAYS
- E-MAIL FROM NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS MEMORANDUM OF UNDERSTANDING
- COMMENTS FROM NATIONAL HIGHWAYS
- E-MAIL FROM NATIONAL HIGHWAYS
- BRIEF COMMITTEE OUTCOME 4 FEB 26
- LATER REPRESENTATIONS TO PLANNING COMMITTEE 4 FEB 26
- SIGNALISED JUNCTION CONCEPT DESIGN
- PROPOSED MITIGATION V4C
- REFUSE SPA 02
- OFFICER EMAIL TO NATIONAL HIGHWAYS
- AGENT EMAIL 26 JAN 26
- EXTERNAL LEVELS LAYOUT 1 OF 3
- EXTERNAL LEVELS LAYOUT 3 OF 3
- INDICATIVE DRAINAGE GA
- INDICATIVE SUDS FEATURES
- OVERLAND FLOODING
- REFUSE SPA 01
- EXTERNAL LEVELS LAYOUT 2 OF 3
- REFUSE SPA 03
- ALDI HGV SPA
- B&M HGV SPA
- CTTEE SV LETTER TO AGENT
- PLANNING COMMITTEE REPORT 4 FEBRUARY 2026
- PUBLIC COMMENT (PA)
- SPORT ENGLAND COMMENTS
- HIGHWAYS DC FINAL COMMENTS
- E-MAIL FROM HIGHWAYS DC
- BIODIVERSITY OFFICER COMMENTS
- PROPOSED GROUND FLOOR PLAN
- COMMUNITY USE AGREEMENT
- LANDSCAPE GENERAL ARRANGEMENT PLAN
- SPORT ENGLAND
- SERVICE LEVEL AGREEMENT
- E-MAIL FROM NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS TECHNICAL MEMORANDUM
- 4792LE.L008.A 2ND RESPONSE TO SPORT ENGLAND - NOVEMBER 2025
- 22151-8000-P-03 -DESIGN & ACCESS STATEMENT - 2 OF 5
- 22151-8000-P-03 -DESIGN & ACCESS STATEMENT - 3 OF 5
- ACCESS STATEMENT REV A
- HULL KR DRAFT COMMUNITY USE AGREEMENT (WAUDBY AND COMMUNITY PITCH).
- COVERING EMAIL THREAD
- PROPOSED PADEL - FIRST FLOOR PLAN
- PROPOSED PADEL - GROUND FLOOR PLAN
- 22151-8000-P-03 -DESIGN & ACCESS STATEMENT - 1 OF 5
- 22151-8000-P-03 -DESIGN & ACCESS STATEMENT - 4 OF 5
- 22151-8000-P-03 -DESIGN & ACCESS STATEMENT - 5 OF 5
- NATIONAL HIGHWAYS EMAIL
- NATIONAL HIGHWAYS TECHNICAL MEMORANDUM
- NATIONAL HIGHWAYS COMMENTS
- IACPC AND ANNEX 3 LOCATION PLAN
- RETAIL DATA POLICY RESPONSE
- SPORT ENGLAND LETTER 23 OCT 25
- AGENT EMAIL 24 OCT 25
- EMAIL FROM ENV HEALTH RE FURTHER INFO
- URBAN FORESTRY COMMENTS
- URBAN FORESTRY COMMENTS
- PUBLIC COMMENT
- URBAN FORESTRY COMMENTS
- OFFICER EMAIL 2 OCT 25
- EMAIL SPORTS ENLAND 02 10 2025
- EMAIL FROM AGENT RE SPORT ENGLAND COMMENTS
- FLOOD RISK ASSESSMENT
- PHASE 2 REPORT REV A
- PHASE 2 REPORT REV A
- EMAIL 22 09 2025 12.50
- SUDS AND FOUL DRAINAGE STRATEGY 1
- SUDS AND FOUL DRAINAGE STRATEGY 4
- SUDS AND FOUL DRAINAGE STRATEGY 5
- EMAIL THREAD 25/09/25
- PHASE 2 REPORT REV A
- PHASE 2 REPORT REV A
- SUDS AND FOUL DRAINAGE STRATEGY 2
- SUDS AND FOUL DRAINAGE STRATEGY 3
- SUDS AND FOUL DRAINAGE STRATEGY 6
- SUDS AND FOUL DRAINAGE STRATEGY 7
- FEASIBILITY STUDY AND EQUIVALENT QUALITY ASSESSMENT FOR THE RELOCATION OF NATUR
- FLOOD RISK ASSESSMENT
- URBAN DESIGN COMMENTS
- NATIONAL HIGHWAYS TECHNICAL MEMORANDUM
- NATIONAL HIGHWAYS COMMENTS
- E-MAIL FROM NATIONAL HIGHWAYS
- SPORT ENGLAND COMMENTS
- PROPOSED ACCESS RIGHT TURN LANE SWEPT PATH ANALYSIS
- AGENT EMAIL 12 SEP 25
- AGENT EMAIL 10 SEP 25
- GLTA AND AERIAL ASSESSMENT
- PROPOSED ACCESS RIGHT TURN LANE PRELIMINARY DESIGN
- PROPOSED SITE PLAN - GROUND
- PROPOSED SITE PLAN - GROUND FLOOR PLANS COLOURED
- THE HUB - PROPOSED ELEVATIONS
- LANDSCAPE GENERAL ARRANGEMENT P06
- ACCESS AND CIRCULATION 2 OF 4 P05
- PROPOSED SITE PLAN - ROOF
- WAUDBY CENTRE - PROPOSED GROUND FLOOR
- WAUDBY CENTRE - PROPOSED ELEVATIONS SHEET 2 OF 2
- PROPOSED PADEL - FIRST FLOOR PLAN
- LANDSCAPE MASTERPLAN 07
- FENCING GENERAL ARRANGEMENT P04
- PROPOSED SITE PLAN - ROOF PLANS COLOURED
- WAUDBY CENTRE - PROPOSED ELEVATIONS SHEET 1 OF 2
- PROPOSED PADEL - GROUND FLOOR PLAN
- PROPOSED PADEL - ELEVATIONS
- E-MAIL FROM SPORT ENGLAND
- DPP LETTER 14 AUG 25
- DPP EMAIL 19 AUG 25
- LANDSCAPE GENERAL ARRANGEMENT P06
- FENCING GENERAL ARRANGEMENT P04
- ACCESS AND CIRCULATION 2 OF 4 P05
- EASTERN BOUNDARY FUTURE ACCESS ROAD
- PROPOSED SITE PLAN ROOF
- PROPOSED SITE PLAN ROOF PLANS COLOURED
- PROPOSED SITE PLAN GROUND FLOOR PLANS COLOURED
- LANDSCAPE MASTERPLAN P07
- PUBLIC COMMENT
- LETTER FROM AGENT
- LANDSCAPE MASTERPLAN
- LANDSCAPE GENERAL ARRANGEMENT
- ACCESS AND CIRCULATON.
- PROPOSED SITE PLAN - ROOF PLANS
- FENCING GENERAL ARRANGEMENT
- FUTURE ACCESS ROAD
- PROPOSED SITE PLAN
- PROPOSED SITE PLAN
- AGENT EMAIL 5 AUG 25
- E-MAIL FROM AGENT
- EMAIL FROM ECOLOGIST 30/07/2025
- BIODIVERSITY OFFICER COMMENTS
- CRITICAL REPORT FOR STORM 1
- CRITICAL REPORT FOR STORM 3
- CRITICAL REPORT FOR STORM 4
- DRAIN DOWN TIME
- DESIGN INPUT
- CRITICAL REPORT FOR STORM 2
- HIGHWAYS COMMENTS
- NORTHERN GAS WORKS COMMENTS
- EMAIL FROM NORTHERN GAS
- PUBLIC COMMENT
- COMMENTS FROM THE FLOOD TEAM
- COMMENTS FROM THE FLOOD TEAM
- ACCESS OFFICER COMMENTS
- LOCAL PLAN OPEN SPACE COMMENTS
- LOCAL PLAN COMMENTS
- ACCESS OFFICER COMMENTS
- EMAILS TO AGENT 07/07/2025
- ENVIRONMENT HEALTH COMMENTS
- FLOOD TEAM COMMENTS
- SPORT ENGLAND COMMENTS
- HUMBER ARCHAEOLOGY COMMENTS
- EMAIL FROM NATIONAL HIGHWAYS
- NATIONAL HIGHWAYS COMMENTS
- TECHNICAL MEMORANDUM
- PRESS NOTICE
- AGENT EMAIL 1 JULY 25
- PUBLIC COMMENT (PA)
- PHASE 2 REPORT
- PUBLIC HEALTH COMMENTS
- AGENT EMAIL 23 JUNE 25
- PHASE 2 REPORT
- PHASE 2 REPORT
- PHASE 2 REPORT
- PHASE 2 REPORT
- PHASE 2 REPORT
- PHASE 2 REPORT
- YWS COMMENTS
- PUBLIC PROTECTION COMMENTS
- PUBLIC COMMENT (PA)
- URBAN DESIGN COMMENTS
- PUBLIC COMMENT
- PUBLIC COMMENT (PA)
- NATURAL ENGLAND COMMENTS
- NATURAL ENGLAND ANNEX A
- E-MAIL FROM NORTHERN GAS
- SAFEWORKING IN VICINITY OF NGN PLANT
- TREE PLANTING GUIDELINES
- NORTHERN GAS WORKS COMMENTS
- GUIDANCE WITH TEMPORARY PIPELINE CROSSINGS
- TREE SURVEY
- ACTIVE TRAVEL COMMENTS
- CHECKSHEET
- ENVIRONMENT AGENCY COMMENTS
- PRESTON ROAD
- EXTERNAL LEVELS LAYOUT 1 OF 3
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 2 OF 7
- ACCESS AND CIRCULATION 2 OF 4
- HVM SECURE LINES PLAN
- SECURE LINE PLAN
- ENERGY STATEMENT
- UTILITIES STATEMENT
- PLANNING STATEMENT
- SITE LOCATION PLAN
- PROPOSED RETAIL STORE GROUND FLOOR PLAN
- PROPOSED RETAIL UNITS ELEVATIONS BLOCK C
- PROPOSED PADEL GROUND FLOOR PLAN
- SECTION E PHASE 1 GEO ENV REPORT FINAL
- EAST HULL HOUSEHOLD SURVEY BY POSTCODE SECTOR
- EXTERNAL LEVELS LAYOUT 2 OF 3
- EXTERNAL LEVELS LAYOUT 3 OF 3
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 3 OF 7
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 4 OF 7
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 5 OF 7
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 6 OF 7
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 7 OF 7
- FENCING GENERAL ARRANGEMENT 7 OF 7
- ACCESS AND CIRCULATION 1 OF 4
- ACCESS AND CIRCULATION 3 OF 4
- ACCESS AND CIRCULATION 4 OF 4
- SITE SECTIONS 1 OF 2
- SITE SECTIONS 2 OF 2
- PLAYING FIELD NET LOSS GAIN
- PLANTING STRATEGY
- DETAILED LANDSCAPE MASTERPLAN 1 OF 2
- DETAILED LANDSCAPE MASTERPLAN 2 OF 2
- EXTERNAL LIGHTING STRATEGY
- COVERING LETTER FOR SUBMISSION
- HULL KR DOCUMENT REGISTER
- SEQUENTIAL IMPACT ASSESSMENT
- WAUDBY CENTRE EXISTING ELEVATIONS SHEET 2 OF 2
- WAUDBY CENTRE EXISTING SECTIONS
- PROPOSED SITE PLAN ROOF
- PROPOSED SITE PLAN GROUND
- PROPOSED RETAIL STORE ROOF PLAN
- PROPOSED COMMERCIAL UNIT GROUND FLOOR
- WAUDBY CENTRE PROPOSED GROUND FLOOR
- WAUDBY CENTRE PROPOSED FIRST FLOOR
- PROPOSED RETAIL UNITS ELEVATIONS BLOCK B
- PROPOSED PADEL ELEVATIONS
- PROPOSED PADEL SECTIONS
- THE HUB PROPOSED FIRST FLOOR PLAN
- THE HUB PROPOSED ROOF PLAN
- AIR QUALITY ASSESSMENT
- ALDI DAS SUSTAINABILITY INFO
- CRAVEN PARK VER 7 ARB REPORT 2025
- CRAVEN PARK TA FINAL ISSUE 1 REV A
- CRAVEN PARK TA FINAL ISSUE 1 REV A
- CRAVEN PARK TP FINAL ISSUE 1 REV A
- CIL FORM
- HULL KR BUILDING 4 BREEAM V6 RETAIL PRE ASSESSMENT V2
- HULL KR BUILDING 4 SLAZENGER PADEL BREEAM PRE ASSESSMENT V2
- HULL KR BUILDING 5 BREEAM V6 RETAIL PRE ASSESSMENT V2
- HULL KR THE HUB BREEAM V6 PRE ASSESSMENT V2
- HEALTH CHECK APPENDIX
- HFA REPORT 2275 HKR COMMUNITY SPORTS VILLAGE DBA
- PEA AND BNG ASSESSMENT AT CRAVEN PARK STADIUM
- SECTION A FLOOD RISK ASSESSMENT FINAL
- SECTION A PHASE 1 GEO ENV REPORT FINAL
- SECTION B SUDS AND FOUL DRAINAGE STRATEGY
- SECTION C SUDS AND FOUL DRAINAGE STRATEGY
- SECTION D PHASE 2 REPORT FINAL
- SECTION D SUDS AND FOUL DRAINAGE STRATEGY
- SECTION E SUDS AND FOUL DRAINAGE STRATEGY
- SECTION M SUDS AND FOUL DRAINAGE STRATEGY
- SECTION F PHASE 1 GEO ENV REPORT FINAL
- SECTION E PHASE 2 REPORT FINAL
- SECTION F PHASE 2 REPORT FINAL
- SECTION G PHASE 2 REPORT FINAL
- TABLE 6
- EAST HULL HOUSEHOLD SURVEY QUESTIONNAIRE
- DETAILED LANDSCAPE GENERAL ARRANGEMENT 1 OF 7
- TREE RETENTION AND REMOVAL PLAN
- WAUDBY CENTRE EXISTING GROUND FLOOR PLAN
- WAUDBY CENTRE EXISTING FIRST FLOOR PLAN
- WAUDBY CENTRE EXISTING ROOF PLAN
- WAUDBY CENTRE EXISTING ELEVATIONS SHEET 1 OF 2
- PROPOSED RETAIL STORE ELEVATIONS 1 OF 2
- PROPOSED RETAIL STORE ELEVATIONS 2 OF 2
- PROPOSED RETAIL STORE SECTIONS
- PROPOSED COMMERCIAL UNIT ROOF PLAN
- PROPOSED COMMERCIAL UNIT ELEVATIONS SHEET 1 OF 2
- PROPOSED COMMERCIAL UNIT ELEVATIONS SHEET 2 OF 2
- PROPOSED COMMERCIAL UNIT SECTIONS
- WAUDBY CENTRE PROPOSED ROOF PLAN
- WAUDBY CENTRE PROPOSED ELEVATIONS SHEET 1 OF 2
- WAUDBY CENTRE PROPOSED ELEVATIONS SHEET 2 OF 2
- WAUDBY CENTRE PROPOSED SECTIONS
- PROPOSED RETAIL UNITS GROUND FLOOR PLAN
- PROPOSED RETAIL UNITS ROOF PLAN
- PROPOSED RETAIL UNITS ELEVATIONS BLOCK A
- PROPOSED PADEL FIRST FLOOR PLAN
- PROPOSED PADEL ROOF PLAN
- THE HUB PROPOSED GROUND FLOOR PLAN
- THE HUB PROPOSED ELEVATIONS
- RETAIL UNIT 01 GA PLANS
- PROPOSED STREET SECTIONS
- RETAIL UNIT 01 ELEVATIONS
- PROPOSED STREET ELEVATIONS ANNANDALE ROAD
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- DESIGN AND ACCESS STATEMENT
- HKR COMMUNITY SPORT VILLAGE NOISE ASSESSMENT
- 2022 ALDI UK SUSTAINABILITY SUMMARY
- CRAVEN PARK TP FINAL ISSUE 1 REV A
- HULL KR BM BREEAM V6 PRE ASSESSMENT V2
- HULL KR BUILDING 2 BREEAM V6 RETAIL PRE ASSESSMENT V2
- HULL DOCKERS LETTER OF SUPPORT
- HKR SEWELL GROUP CRAVEN PARK SCI FINAL
- BNG METRIC 25 REV C
- CONDITION ASSESSMENTS
- SECTION A ALDI PLOT PHASE 2 GROUND INVESTIGATION REPORT
- SECTION A SUDS AND FOUL DRAINAGE STRATEGY
- SECTION B ALDI PLOT PHASE 2 GROUND INVESTIGATION REPORT
- SECTION B FLOOD RISK ASSESSMENT FINAL
- SECTION B PHASE 1 GEO ENV REPORT FINAL
- SECTION C PHASE 1 GEO ENV REPORT FINAL
- SECTION C PHASE 2 REPORT FINAL
- SECTION D PHASE 1 GEO ENV REPORT FINAL
- SECTION F SUDS AND FOUL DRAINAGE STRATEGY
- SECTION G SUDS AND FOUL DRAINAGE STRATEGY
- SECTION H SUDS AND FOUL DRAINAGE STRATEGY
- SECTION I SUDS AND FOUL DRAINAGE STRATEGY
- SECTION J SUDS AND FOUL DRAINAGE STRATEGY
- SECTION K SUDS AND FOUL DRAINAGE STRATEGY
- SECTION L SUDS AND FOUL DRAINAGE STRATEGY
- TABLE 5
- TABLE 7
- TABLE 8
- TABLES 1-4B
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Kingston upon Hull, City of for determination, against a statutory target of eight weeks. Over the last year Kingston upon Hull, City of decided full applications in a median of 103 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Kingston upon Hull, City of
-
26/00523/FULL Granted
144 Cranbrook Avenue Kingston Upon Hull HU6 7ST
Erection of flat roof rear and side extension 9.5m (length) x 8.45m (width) x 3.05m (height) following removal of existing annex.
-
26/00257/FULL Granted
Hessle Road Hand Car Wash 3 Strickland Street Kingston Upon Hull HU3 4AD
Change of use from car wash to a motor vehicle repair, servicing and MOT testing center.
-
26/00658/FULL Granted
83 Mersey Street Kingston Upon Hull HU8 8SF
Erection of single storey rear extension (2.6m width x 5m length) following removal of outhouse.
-
26/00114/FULL Granted
Rear Of 29-31 George Street/New Garden Street (Rosedana) Kingston Upon Hull HU1 3BA
Works to rear of 29-31 George Street, involving:- 1. Formation of vehicular access/vehicular footpath crossing 2. Alterations to existing walls, and erection of sections of wall.
-
26/00541/FULL Granted
12 Dryden Street Kingston Upon Hull HU8 8ND
Single storey flat roof rear extension 3.39m (max height) x 3.1m (width) x 3m (length) with additional internal alterations to ground floor and first floor.