Ward · King’s Lynn and West Norfolk
Planning applications in South And West Lynn
Page 3 of 3, newest first. Back to the South And West Lynn overview.
Applications in South And West Lynn
Newest first · page 3 of 3
-
16/01244/CU Granted
EMG Motor Group Beveridge Way Hardwick Narrows King's Lynn Norfolk PE30 4NB
Change of use of land for use as display and storage of vehicles
-
14/00808/DISC_B Granted
Marmaris Turkish Restuarant 5 Out South Gates King's Lynn Norfolk PE30 5SX
DISCHARGE OF CONDITIONS 4 - To install a carwash facility at rear of Marmaris Restaurant
-
15/02090/DISC_B Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 4: High pressure gas pipeline between National Grid National Transmission System and Palm Paper mill site, including above ground Pressure Reduction Meeting Station and minimum offtake connection and associated access, landscaping and means of enclosure
-
14/01199/DISC_C Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITIONS 4, 5, 7, 9 - 14/01199/RMM: RESERVED MATTERS APPLICATION: Phase 2 of development, construction of 59 dwellings
-
09/02010/DISC_W Awaiting decision
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITION 35: Outline application: Mixed use development - Variation of condition 5 and removal of condition 7 of planning permission 05/00691/OM
-
15/02090/DISC_A Granted
Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL
DISCHARGE OF CONDITIONS 6 AND 7: High pressure gas pipeline between National Grid National Transmission System and Palm Paper mill site, including above ground Pressure Reduction Meeting Station and minimum offtake connection and associated access, landscaping and means of enclosure
-
12/00550/DISC_D Granted
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 11 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
-
08/02725/DISC_B Granted
Golden Ball Farm Low Road Saddlebow Norfolk PE34 3FN
DISCHARGE OF CONDITIONS 6,7 - Conversion of barn complex to 3 No dwellings
-
15/01584/DISC_A Granted
C & A Superbikes Unit 11 Willow Road Willows Business Park King's Lynn Norfolk
DISCHARGE OF CONDITION 3: Additional car/van sales area and construction of workshop
-
15/01241/DISC_A Granted
Land Adjacent To Pier Point Retail Park Hardwick Road King's Lynn Norfolk
Discharge of conditions 4 and 5 of planning permission 15/01241/FM: Construction of steel building for B2 & B8 usage
-
14/01400/DISC_B Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
Discharge of condition 4 of planning permission 14/01400/RMM: RESERVED MATTERS APPLICATION: King's Lynn Innovation Centre
-
15/01519/DISC_A Granted
McDonalds Restaurants Ltd 1 Campbells Meadow King's Lynn Norfolk PE30 4YN
DISCHARGE OF CONDITION 3 ATTACHED TO PLANNING PERMISSION 15/01519/F: Reconfiguration of the drive thru lane to provide a side by side order point with the construction of a new island for signage and reconfigured kerb lines including associated works to the site. Reconfigured pedestrian access to the site. Installation of 2no. under eaves extension totalling 14.5 sqm. The installation of 2 no. customer order displays (COD) and associated canopies. Existing fascia signs re-lamped with LEDs
-
15/00710/DISC_B Granted
Next 7 - 9 Pierpoint Retail Park Hansa Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4HX
DISCHARGE OF CONDITION 6: External alterations to Unit 1B and alterations to the car park layout as approved under planning permission 14/00521/F
-
15/00709/DISC_A Granted
Units 2 And 4 Pierpoint Retail Park Hansa Road Hardwick Industrial Estate King's Lynn Norfolk
DISCHARGE OF CONDITION 3: External alterations and amendments to car parking layout
-
15/00710/DISC_A Granted
Next 7 - 9 Pierpoint Retail Park Hansa Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4HX
Discharge of condition 3 of planning permisison 15/00710/F: External alterations to Unit 1B and alterations to the car park layout as approved under planning permission 14/00521/F
-
14/00521/DISC_B Granted
Next 7 - 9 Pierpoint Retail Park Hansa Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4HX
Discharge of condition 3 of planning permission 14/00521/F: Reconfiguration and extension to Unit 1/1a to create two Class A1 retail units and associated works including external alterations and alterations to the car park
-
15/00927/DISC_A Granted
18 Hamlin Way Hardwick Narrows King's Lynn Norfolk PE30 4NG
DISCHARGE OF CONDITION 3 ATTACHED TO PLANNING PERMISSION 15/00927/F: Creation of drive-through bus wash, new chassis wash and inspection pit with increase height of roller shutter door within existing workshop
-
14/01117/DISC_A Granted
Overtons Coach Painters Harbour Branch Wisbech Road King's Lynn Norfolk PE30 5JL
DISCHARGE OF CONDITIONS 3 AND 8: Proposed shot blasting facility
-
14/01199/DISC_B Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITION 11: reserved matters application - phase 2 of development, construction of 59 dwellings
-
09/02010/DISC_V Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITION 35 ATTACHED TO PLANNING PERMISSION 09/02010/F: Outline application: Mixed use development - Variation of condition 5 and removal of condition 7 of planning permission 05/00691/OM
-
14/00808/DISC_A Granted
Marmaris Turkish Restuarant 5 Out South Gates King's Lynn Norfolk PE30 5SX
Discharge of conditions 3 and 4 of planning permission 14/00808/CU: To install a carwash facility at rear of Marmaris Restaurant
-
14/00521/DISC_A Granted
7 - 9 Pierpoint Retail Park Hansa Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4HX
DISCHARGE OF CONDITION 6: Reconfiguration and extension to Unit 1/1a to create two Class A1 retail units and associated works including external alterations and alterations to the car park
-
09/02010/DISC_U Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITIONS 28, 41, 42,, 43 and 44: outline application: Mixed use development - Variation of condition 5 and removal of condition 7 of planning permission 05/00691/OM
-
14/01400/DISC_A Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITIONS 2 and 3: King's Lynn Innovation Centre
-
14/01199/DISC_A Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
Discharge of conditions 1, 3, 6, 8 and 10 of planning permission 14/01199/RMM: RESERVED MATTERS APPLICATION: Phase 2 of development, construction of 59 dwellings
-
09/02010/DISC_T Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITIONS 17,19, 24, 32 AND 40: Outline application: Mixed use development - Variation of condition 5 and removal of condition 7 of planning permission 05/00691/OM
-
13/01063/DISC_A Granted
3 Sidney Street King's Lynn Norfolk PE30 5RH
DISCHARGE OF CONDITIONS 3, 4, 5 AND 7 ATTACHED TO PLANNING PERMISSION 13/01063/F: Construction of residential dwelling on garden plot
-
12/00550/DISC_C Granted
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 7, 9, 10, 13, 15, 17 and 18 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
-
12/00550/DISC_B Granted
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 3(2) and 6(1) of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
-
13/01377/DISC_C Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCAHRGE OF CONDITION 3: To allow for phased development of area and plot substitutions on plots 12-14, 16 and 19-23
-
12/00550/DISC_A Granted
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discharge of Requirement 14 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
-
14/01403/DISC_A Granted
Mars Foods Ltd Hansa Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4JE
Discharge of condition 3 of planning permission 14/01403/F: Variation of conditions 2 and 3 of planning permission 14/00367/FM: Phased building of a new MARS King's Lynn office facility. Will require a phased demolition of their existing office facility. New facility will not only replicate, but improve the provision for the MARS Food Factory with no change of use. Will be single storey building with a double volume main entrance bay. Open service plant on the flat roof will be screened with louvred walls. Intended associated works and landscaping will be completed at the end of the demolition and new build. Will require pedestainising the whole frontage of the new building by creating a covered and well lit walkway, lined with new hedges and new trees
-
09/02010/DISC_S Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
DISCHARGE OF CONDITION 35 OF PLANNING PERMISSION 09/02010/F: outline application: Mixed use development - Variation of condition 5 and removal of condition 7 of planning permission 05/00691/OM
-
11/02022/DISC_D Granted
Kellard House Hardwick Road King's Lynn Norfolk PE30 5BB
DISCHARGE OF CONDITION 13: Development of 68 bedroom travelodge hotel with associated reception and vending facilities together with all relevant support areas to Travelodge design standards. The creation of external areas including parking for 61 cars
-
14/00027/DISC_A Granted
50 Ferry Road West Lynn King's Lynn Norfolk PE34 3NB
DISCHARGE OF CONDITION 3, 4, 7 & 8 ATTACHED TO PLANNING PERMISSION 14/00027/FM: Demolition of former care facility building and redevelopment for 20 houses
-
13/01377/DISC_B Granted
The Nar Ouse Regeneration Area (NORA) Wisbech Road King's Lynn Norfolk
Discharge of conditions 2 and 6 of planning permission 13/01377/F: To allow for phased development of area and plot substitutions on plots 12-14, 16 and 19-23