Planning application
Mast Telecom Benns Lane Terrington St Clement Norfolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
NOTIFICATION UNDER THE ELECTRONIC COMMUNICATIONS CODE REGULATIONS 2003 REGULATION 5 AS PER PART 16 SCHEDULE 2: The replacement of 1no. existing antenna for 1no. proposed antenna at 17m, the removal of 2no. existing MHAs and 1no. existing GPS Node and the installation of 2no. proposed Remote Radio Heads RRHs with associated ancillary equipment on the fire station tower. The installation of 1no. GPS node, 1no. proposed BOBs and 1no. proposed gantry pole and the replacement of 1no. existing equipment cabinet for 1no. proposed equipment cabinet at ground level.
As published by the council, reference 26/00913/NT28
Application record
- Reference
- 26/00913/NT28
- Status
- Unknown
- Received
- 27 May 2026
- Validated
- 27 May 2026
- Decided
- 9 Jun 2026
- Ward
- Terrington
- Parish
- Terrington St Clement
Timeline
Dates from the published record
-
27 May 2026
Received by King’s Lynn and West Norfolk
-
9 Jun 2026
Decision issued
-
9 Aug 2026
Added to PlanIndex
-
16 Aug 2026
Status changed to Unknown
Previously Awaiting decision.
Who's behind it
Company information only, from the register and Companies House
BT Group PLC Applicant, registered in London
Active · incorporated 2001 · London
78 applications on PlanIndex · across 22 councils · 63% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- RESPONSE FROM LPA
- AGENT LETTER
- DECLARATION OF CONFORMITY
- POWER AND TRANSMISSION SCHEDULE
- EQUIPMENT SCHEDULE AND SUPPORT STRUCTURE DETAILS
- PROPOSED ANTENNA SCHEDULE
- EXISTING ANTENNA SCHEDULE
- PROPOSED SITE ELEVATION
- EXISTING SITE ELEVATION
- PROPOSED SITE PLAN
- EXISTING SITE PLAN
- LEASE DEMISE
- SITE LOCATION PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with King’s Lynn and West Norfolk for determination, against a statutory target of eight weeks. Over the last year King’s Lynn and West Norfolk's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on King’s Lynn and West Norfolk's portal will say. Our guide explains the common types.