Proposal
DISCHARGE OF CONDITIONS 4,6,7,13,20,21,25 FOR PHASE ONE ONLY and CONDITIONS 3 & 24 FOR THE WHOLE SITE ATTACHED TO PLANNING PERMISSION 25/01783/FM - Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works
As published by the council, reference 25/01783/DISC_A
Application record
- Reference
- 25/01783/DISC_A
- Status
- Awaiting decision
- Received
- 2 Sep 2026
- Validated
- 7 Sep 2026
- Ward
- South And West Lynn
- Parish
- King's Lynn
Comment by 28 September 2026
The council is taking comments on this application until then. Comments go to King’s Lynn and West Norfolk through their own planning portal.
Site history
Applications at this address on the King’s Lynn and West Norfolk register
This site has had 2 applications since 2025.
-
25/01783/FM Awaiting decision
Development Site W of Nar Ouse Way King's Lynn Norfolk
Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works.
Timeline
Dates from the published record
-
2 Sep 2026
Received by King’s Lynn and West Norfolk
-
7 Sep 2026
Validated
Checked as complete and ready for consideration.
-
7 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
King’s Lynn and West Norfolk took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01783/FM Awaiting decision
Development Site W of Nar Ouse Way King's Lynn Norfolk
Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Maidstone
358 applications on PlanIndex · across 54 councils · 91% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
- AGENT & DISC TEAM CORRESPONDENCE
- AGENT CORRESPONDENCE
- DECISION NOTICE 25/01783/FM
- INVALID LETTER (NOT INCORRECT FEE)
- APPLICATION FORM
- UPDATED CALCULATIONS
- CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
- BIODIVERSITY GAIN PLAN MASTER
- BIODIVERSITY GAIN PLAN PHASE 1
- HABITAT MANAGEMENT AND MONITORING PLAN
- CONSTRUCTION ZONES & MANAGEMENT, TRAFFIC MANAGEMENT & WELFARE SETUP
- HMMP PLANS
- CONSTRUCTION MANAGEMENT PLAN
- PRE-COMMENCEMENT CONDITIONS COVERING LETTER
- SURFACE WATER MANAGEMENT PLAN
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE CONSTRUCTION DETAILS
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE STRATEGY
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE STRATEGY
- SURFACE WATER MANAGEMENT PLAN APPENDIX 2 - CONSTRUCTION ZONES AND MANAGEMENT
- SURFACE WATER MANAGEMENT PLAN APPENDIX 3 - TRAFFIC MANAGEMENT AND WELFARE SETUP
- SURFACE WATER MANAGEMENT PLAN APPENDIX 4 - FOOTPATH DIVERSION METHOD AND BOUNDAR
- SURFACE WATER MANAGEMENT PLAN APPENDIX 5 - WHEELWASH DETAILS
- SURFACE WATER MANAGEMENT PLAN APPENDIX 6 - CEMP
- BELOW GROUND DRAINAGE DESIGN SHEET 1
- BELOW GROUND DRAINAGE DESIGN SHEET 2
- BELOW GROUND DRAINAGE DESIGN MH SCHEDULES
- SURFACING AND KERBING PLAN SHEET 1
- SURFACING AND KERBING PLAN SHEET 2
- GROUND FLOOR GENERAL ARRANGEMENT - KLEP
- EXTERNAL CONSTRUCTION DETAILS SHEET 1
- PROPOSED BUILDING ELEVATIONS
- GROUND GAS MITIGATION MEASURES - DESIGN REPORT AND VERIFICATION PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with King’s Lynn and West Norfolk for determination, against a statutory target of eight weeks. Over the last year King’s Lynn and West Norfolk's median decision took 56 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on King’s Lynn and West Norfolk's portal will say. Our guide explains the common types.