Planning application
Development Site W of Nar Ouse Way King's Lynn Norfolk
Relates to 25/01783/FM
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
DISCHARGE OF CONDITIONS 4,6,7,13,20,21 AND 25 FOR PHASE ONE ONLY and CONDITIONS 3 & 24 FOR THE WHOLE SITE ATTACHED TO PLANNING PERMISSION 25/01783/FM - Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works
As published by the council, reference 25/01783/DISC_A
Application record
- Reference
- 25/01783/DISC_A
- Status
- Awaiting decision
- Received
- 2 Sep 2026
- Validated
- 7 Sep 2026
- Ward
- South And West Lynn
- Parish
- King's Lynn
Site history
Applications at this address on the King’s Lynn and West Norfolk register
This site has had 3 applications since 2025.
-
25/01783/DISC_B Awaiting decision
Development Site W of Nar Ouse Way King's Lynn Norfolk
DISCHARGE OF CONDITION 9 FROM PLANNING PERMISSION 25/01783/FM - Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works
-
25/01783/FM Awaiting decision
Development Site W of Nar Ouse Way King's Lynn Norfolk
Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works.
Timeline
Dates from the published record
-
2 Sep 2026
Received by King’s Lynn and West Norfolk
-
7 Sep 2026
Validated
Checked as complete and ready for consideration.
-
7 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
King’s Lynn and West Norfolk took a median of 55 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01783/FM Awaiting decision
Development Site W of Nar Ouse Way King's Lynn Norfolk
Application for the phased development comprising the change of use of the land to an Active Travel Hub, alongside the construction of a single storey hub building, surface car park, pedestrian infrastructure, access, landscaping and ancillary works.
Documents
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
- AGENT & DISC TEAM CORRESPONDENCE
- AGENT CORRESPONDENCE
- DECISION NOTICE 25/01783/FM
- INVALID LETTER (NOT INCORRECT FEE)
- APPLICATION FORM
- UPDATED CALCULATIONS
- CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN
- BIODIVERSITY GAIN PLAN MASTER
- BIODIVERSITY GAIN PLAN PHASE 1
- HABITAT MANAGEMENT AND MONITORING PLAN
- CONSTRUCTION ZONES & MANAGEMENT, TRAFFIC MANAGEMENT & WELFARE SETUP
- HMMP PLANS
- CONSTRUCTION MANAGEMENT PLAN
- PRE-COMMENCEMENT CONDITIONS COVERING LETTER
- SURFACE WATER MANAGEMENT PLAN
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE CONSTRUCTION DETAILS
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE STRATEGY
- SURFACE WATER MANAGEMENT PLAN APPENDIX 1 DRAINAGE STRATEGY
- SURFACE WATER MANAGEMENT PLAN APPENDIX 2 - CONSTRUCTION ZONES AND MANAGEMENT
- SURFACE WATER MANAGEMENT PLAN APPENDIX 3 - TRAFFIC MANAGEMENT AND WELFARE SETUP
- SURFACE WATER MANAGEMENT PLAN APPENDIX 4 - FOOTPATH DIVERSION METHOD AND BOUNDAR
- SURFACE WATER MANAGEMENT PLAN APPENDIX 5 - WHEELWASH DETAILS
- SURFACE WATER MANAGEMENT PLAN APPENDIX 6 - CEMP
- BELOW GROUND DRAINAGE DESIGN SHEET 1
- BELOW GROUND DRAINAGE DESIGN SHEET 2
- BELOW GROUND DRAINAGE DESIGN MH SCHEDULES
- SURFACING AND KERBING PLAN SHEET 1
- SURFACING AND KERBING PLAN SHEET 2
- GROUND FLOOR GENERAL ARRANGEMENT - KLEP
- EXTERNAL CONSTRUCTION DETAILS SHEET 1
- PROPOSED BUILDING ELEVATIONS
- GROUND GAS MITIGATION MEASURES - DESIGN REPORT AND VERIFICATION PLAN
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with King’s Lynn and West Norfolk for determination, against a statutory target of eight weeks. Over the last year King’s Lynn and West Norfolk's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on King’s Lynn and West Norfolk's portal will say. Our guide explains the common types.