Planning application
3 Golden Ball Farm Barns Low Road Saddlebow King's Lynn Norfolk PE34 3FN
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Householder: Proposed Rear Oak Frame Extension
As published by the council, reference 24/02002/F
Application record
- Reference
- 24/02002/F
- Type
- Full Application
- Status
- Application Permitted
- Decision
- Granted As published: Application Permitted
- Received
- 8 Nov 2024
- Validated
- 8 Nov 2024
- Decided
- 19 Dec 2024
- Ward
- South And West Lynn
- Parish
- King's Lynn
- Decision by
- Delegated Decision
- Postcode
- PE34 3FN
Timeline
Dates from the published record
-
8 Nov 2024
Received by King’s Lynn and West Norfolk
-
19 Dec 2024
Decision issued: Application Permitted
-
11 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Claxton-Hall Architectural Ltd Agent, an architecture practice registered in Fakenham
Active · incorporated 2013 · Fakenham
118 applications on PlanIndex · across 4 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
- DECISION
- OFFICER REPORT
- EMERGENCY PLANNING - KEVIN KENT
- INTERNAL DRAINAGE BOARD
- APPLICATION FORM
- FLOOD RISK PROFORMA
- SURVEY DRAWING -AS EXISTING
- PROPOSED DRAWING
- PROPOSAL DRAWING - IMAGES AND SITE PLAN
- FLOOD RISK MATRIX
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
King’s Lynn and West Norfolk granted permission on 19 December 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Golden Ball Farm Low Road Saddlebow Norfolk PE34 3FN
DISCHARGE OF CONDITIONS 6,7 - Conversion of barn complex to 3 No dwellings
Granted ConditionsSeveral homes -
Golden Ball Farm Low Road Saddlebow Norfolk PE34 3FN
DISCHARGE OF CONDITIONS 6 AND 12: Conversion of barn complex to 3 No dwellings
Granted ConditionsSeveral homes -
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 7, 9, 10, 13, 15, 17 and 18 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
Granted Conditions -
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discharge of Requirement 14 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
Granted Conditions -
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 11 of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
Granted Conditions -
King's Lynn Power Station Willow Road Willows Business Park King's Lynn Norfolk PE34 3RD
Discarge of Requirements 3(2) and 6(1) of Secretary of State's decision dated 18 December 2013: construction and operation of a 2.8km (1.75 miles) 400,000 volt (400kv) overhead electricity transmission line between the proposed King's Lynn B power station and Willows Business Park, Saddlebow, near King's Lynn and the existing 400kV overhead ekectricity transmission line between Norwich main substation and Walpole substation
Granted Conditions
Other full applications
In King’s Lynn and West Norfolk
-
26/01465/F Decided
Corner Cottage Main Road Brancaster KINGS LYNN Norfolk PE31 8AP
Householder - Single Storey extension with living roof - white painted brick wall, amendments to ground floor, new dormer to bedroom
-
26/01419/F Decided
Overy House Tower Road Burnham Overy Staithe King's Lynn Norfolk PE31 8JB
Householder - Proposed Extensions and alterations to Dwelling allowing for Complete refacing of the front elevation, two storey side extension, Conversion of existing garage into habitable space, rear extensions both single and two storey with recessed balcony. Cart shed garage to front and shepherds hut to rear garden
-
26/01386/F Decided
The Poplars 2 Fen Road Watlington King's Lynn Norfolk PE33 0JB
HOUSEHOLDER: Conversion of existing outbuilding into residential annexe and construction of new carport and storage building
-
26/01325/F Decided
136 The Drove Barroway Drove Downham Market Norfolk PE38 0AL
Removal of existing stable, hay shed and tack room and erection of replacement stable building with associated canopy, hardstanding and drainage works
-
26/01439/F Decided
West End House 43 Hall Road Outwell Wisbech Norfolk PE14 8PE
VARIATION OF CONDITION 2 OF PLANNING PERMISSION 24/01802/F: Proposed two storey rear extension , single storey side and front extensions, internal alterations, and temporary static caravan within the dwellings curtilage during construction