Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

Decided King’s Lynn and West Norfolk 10/00883/DISC_I Discharge of planning condition_I

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

DISCHARGE OF CONDITIONS 16, 20 AND 21 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

As published by the council, reference 10/00883/DISC_I

Application record

Reference
10/00883/DISC_I
Type
Discharge of planning condition_I
Status
Decided
Decision
Discharge of Condition final letter
Received
28 Aug 2015
Validated
4 Sep 2015
Decided
14 Oct 2015
Ward
Docking
Parish
Bagthorpe With Barmer - VACANT
Decision by
Discharge of Condition

Site history

Applications at this address on the King’s Lynn and West Norfolk register

This site has had 3 applications since 2015.

  • 10/00883/DISC_J Decided

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    Discharge of conditions 24 and 27(b) of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 25 Jan 2016 Conditions
  • 10/00883/DISC_H Decided

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    Discharge of condition 18 of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 9 Jul 2015 Conditions

Timeline

Dates from the published record

  1. 28 Aug 2015

    Received by King’s Lynn and West Norfolk

  2. 4 Sep 2015

    Validated

    Checked as complete and ready for consideration.

  3. 14 Oct 2015

    Decision issued: Discharge of Condition final letter

  4. 21 Aug 2026

    Added to PlanIndex

After the decision

King’s Lynn and West Norfolk has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_H Submitted 11 Jun 2015 0m away

    Discharge of condition 18 of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided Conditions
  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_J Submitted 10 Nov 2015 0m away

    Discharge of conditions 24 and 27(b) of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided Conditions

In King’s Lynn and West Norfolk

  • 15/01838/VAR1B Withdrawn

    White House Farm 28 Chapel Road Pott Row Norfolk

    Modification of planning obligation, reference LC/S106/16/55 relating to planning application reference 15/01838/OM

    28 Jan 2026 Conditions
  • 24/02087/DISC_E Withdrawn

    Flat At 22 High Street Hunstanton Norfolk PE36 5AF

    DISCHARGE OF CONDITIONS 3, 4 ATTACHED TO PLANNING PERMISSION 24/02087/F - Extension and alterations to commercial unit

    9 Jul 2026 Conditions
  • 24/00873/DISC_A Decided

    Disco Drives Ltd Oldmedow Road Hardwick Industrial Estate King's Lynn Norfolk PE30 4LE

    DISCHARGE OF CONDITION 7 FROM PLANNING PERMISSION 24/00873/FM - Redevelopment of Disco Drives site to provide new timber services warehouse and two new starter units

    18 May 2026 Conditions
  • 26/00184/DISC_A Decided

    Palm Paper Poplar Avenue King's Lynn Norfolk PE34 3AL

    DISCHARGE OF CONDITIONS 5, 6 AND 7 FROM PLANNING PERMISSION 26/00184/FM - Installation of plant and infrastructure machinery to optimise the manufacturing process associated with the Paper Mill

    24 Jun 2026 Conditions
  • 25/00730/DISC_A Decided

    Pal-Mar Chapel Lane Emneth Wisbech Norfolk PE14 0DJ

    DISCHARGE OF CONDITIONS 3 AND 8 FROM PLANNING PERMISSION 25/00730/F - Proposed New Single Storey Dwelling

    7 May 2026 Conditions