Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

Granted King’s Lynn and West Norfolk 10/00883/DISC_E Discharge of Planning Condition_E

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

DISCHARGE OF CONDITION 25 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

As published by the council, reference 10/00883/DISC_E

Application record

Reference
10/00883/DISC_E
Type
Discharge of Planning Condition_E
Status
Decided
Decision
Granted As published: Discharge of Condition final letter
Received
12 Sep 2014
Validated
15 Sep 2014
Decided
13 Jan 2015
Ward
Docking
Parish
Bagthorpe With Barmer - VACANT
Decision by
Discharge of Condition

Site history

Applications at this address on the King’s Lynn and West Norfolk register

This site has had 6 applications since 2014: 6 approved, 0 refused.

  • 10/00883/DISC_J Granted

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    Discharge of conditions 24 and 27(b) of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 25 Jan 2016 Conditions
  • 10/00883/DISC_I Granted

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    DISCHARGE OF CONDITIONS 16, 20 AND 21 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 14 Oct 2015 Conditions
  • 10/00883/DISC_H Granted

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    Discharge of condition 18 of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 9 Jul 2015 Conditions
  • 10/00883/DISC_G Granted

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    DISCHARGE OF CONDITION 6 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 20 Jan 2015 Conditions
  • 10/00883/DISC_F Granted

    Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    DISCHARGE OF CONDITION 12: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Decided 12 Dec 2014 Conditions

Timeline

Dates from the published record

  1. 12 Sep 2014

    Received by King’s Lynn and West Norfolk

  2. 15 Sep 2014

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jan 2015

    Decision issued: Discharge of Condition final letter

  4. 8 Oct 2026

    Added to PlanIndex

What this grant of permission means

King’s Lynn and West Norfolk granted permission on 13 January 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_G Submitted 23 Dec 2014 50 yards away

    DISCHARGE OF CONDITION 6 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Granted Conditions
  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_F Submitted 4 Dec 2014 50 yards away

    DISCHARGE OF CONDITION 12: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Granted Conditions
  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_H Submitted 11 Jun 2015 50 yards away

    Discharge of condition 18 of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Granted Conditions
  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_I Submitted 28 Aug 2015 50 yards away

    DISCHARGE OF CONDITIONS 16, 20 AND 21 ATTACHED TO PLANNING PERMISSION 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Granted Conditions
  • Land Between Bagthorpe Barner And Syderstone Known As Chiplow Main Road Bagthorpe Norfolk

    10/00883/DISC_J Submitted 10 Nov 2015 50 yards away

    Discharge of conditions 24 and 27(b) of planning permission 10/00883/FM: A wind energy development comprising the erection and 25 year operation of five wind turbines with a maximum blade height of 100m and up to 50m -micrositing, together with ancillary infrastructure including on-site access tracks, hard standing areas, control buildings and cabling and a permanent anemometer mast

    Granted Conditions

In King’s Lynn and West Norfolk

  • 25/01223/DISC_A Awaiting decision

    The Downham Market Club 19 Paradise Road Downham Market Norfolk PE38 9HS

    DISCHARGE OF CONDITIONS 5 & 6 ATTACHED TO PLANNING PERMISSION 25/01223/F - Change of use of social club to pharmacy and ancillary units, including alterations to access arrangements (revised design)

    Received 1 Sep, published by the council 2 Sep 2026 Conditions
  • 24/00373/DISC_A Awaiting decision

    23 Lamsey Lane Heacham King's Lynn Norfolk PE31 7LA

    DISCHARGE OF CONDITIONS 5 & 13 ATTACHED TO PLANNING PERMISSION 24/00373/F - New Dwelling Further to Subdivision of Garden

    Received 25 Aug, published by the council 26 Aug 2026 Conditions
  • 25/01990/DISC_A Awaiting decision

    Holmbush Thornham Road Holme next The Sea HUNSTANTON Norfolk PE36 6LS

    DISCHARGE OF CONDITION 3 FROM PLANNING PERMISSION 25/01990/F - Re location of private drive to Holmbush

    Received 21 Aug, published by the council 2 Sep 2026 Conditions
  • 15/01838/VAR1B Withdrawn

    White House Farm 28 Chapel Road Pott Row Norfolk

    Modification of planning obligation, reference LC/S106/16/55 relating to planning application reference 15/01838/OM

    Received 28 Jan, published by the council 24 Jul 2026 Conditions
  • 15/01950/VAR2B Awaiting decision

    Land SE of 25 Hall Road Outwell Wisbech Norfolk PE14 8PE

    Modification of planning obligation, reference LC/S106/16/44 related to planning application 15/01950/OM

    Received 7 Aug, published by the council 12 Aug 2026 Conditions