Skip to content
PlanIndex Get alerts
Menu

Planning application

356, Caledonian Road, London

Awaiting decision Islington P2026/2938/FUL Full Planning Application

Works: Extension Loft or dormer Windows or glazing Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal re-arrangement to reinstate the commercial unit at part ground floor and basement (including lightwell and vaults); amalgamate existing 2no. units into 1no. residential unit across the basement, ground, first, second and third floor; along with an extension to existing mansard roof at third floor; and the insertion of rear bifold doors at lower ground

As published by the council, reference P2026/2938/FUL

Application record

Reference
P2026/2938/FUL
Type
Full Planning Application
Status
Pending As published: VALIDATED
Received
9 Nov 2026
Validated
19 Nov 2026
Ward
Barnsbury, Caledonian

Timeline

Dates from the published record

  1. 9 Nov 2026

    Received by Islington

  2. 19 Nov 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Nov 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 14 January 2027, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Islington took a median of 55 days over the applications it decided in the last year.

Documents

5 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What happens while it is decided

This application is with Islington for determination, against a statutory target of eight weeks. Over the last year Islington decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Islington

  • P2026/2185/FUL Granted

    43 - 53 Myddelton Square, London, EC1R 1YD

    Retrospective application for installation of 1 gas riser to the rear elevation and installation of micro-stop to existing riser with associated internal works to Flats 1-5.

    Received 12 Aug, published by the council 11 Oct 2026 Full applications
  • P2026/2374/FUL Granted

    Naver House, Upper Street, London N1 1UT

    External alterations to Naver House comprising the installation of an accessible platform lift, alterations to selected external openings including the infilling of an existing rear doorway with facing brickwork to match the existing building, and refurbishment of the existing flat roof areas including associated roof drainage and roof-edge works.

    Received 9 Sep, published by the council 11 Oct 2026 Full applications
  • P2026/1406/FUL Granted

    St John’s Row, Owen Street, London, EC1V 4ND

    Installation of security gate.

    Received 1 Jun, published by the council 29 Sep 2026 Full applications
  • P2026/2047/FUL Granted

    37 Devonia Road, London, N1 8JQ

    Replacement of existing single-glazed timber windows with double-glazed timber units, together with the replacement of the rainwater goods system, fascias and soffits, and associated brickwork and render repairs.

    Received 3 Aug, published by the council 19 Nov 2026 Full applications
  • P2026/2400/FUL Granted

    196 Old Street, London, EC1V 9FR

    Installation of two dry riser inlets at ground floor level with associated recessed cabinets to the St Luke’s building Old Street elevation and to the side wall of the St Luke’s building courtyard entrance.

    Received 11 Sep, published by the council 15 Sep 2026 Full applications