Planning application

Ground Floor And Basement, 99 - 100 Turnmill Street, London, EC1M 5QP

Awaiting decision Islington P2026/2881/FUL Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

External alterations, including replacement access door.

As published by the council, reference P2026/2881/FUL

Application record

Reference
P2026/2881/FUL
Type
Full Planning Application
Status
Pending As published: VALIDATED
Received
2 Nov 2026
Validated
3 Nov 2026
Ward
Clerkenwell
Postcode
EC1M 5QP

Comment by 12 December 2026

The council is taking comments on this application until then. Comments go to Islington through their own planning portal.

Timeline

Dates from the published record

  1. 2 Nov 2026

    Received by Islington

  2. 3 Nov 2026

    Validated

    Checked as complete and ready for consideration.

  3. 19 Nov 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 29 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Islington took a median of 55 days over the applications it decided in the last year.

Documents

8 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What happens while it is decided

This application is with Islington for determination, against a statutory target of eight weeks. Over the last year Islington decided full applications in a median of 65 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 99-100 Turnmill Street, London, EC1M 5QP

    P2020/0287/FUL Submitted 29 Jan 2020 50 yards away

    Installation of replacement double leaf door, alterations to front steps and associated alterations.

    Granted Full applications 20 docs
  • Land at Turks Head Yard , London, EC1M 5SY

    P2021/2363/NMA Submitted 11 Aug 2021 50 yards away

    Application for Non-Material Amendment to planning permission ref: P2016/4298/FUL dated 01.10.2018. The amendments comprise of 1) Addition of a condition to introduce phasing; 2) To amend the planning conditions to allow the development to be carried out in two phases; 3) Increase the height of the building by 500mm and addition of a 400mm parapet wall to the building's roof; 4) Addition of access steps at the entrance to the building at the east end of the site.

    Refused Amendments 13 docs
  • 42 Cowcross Street, London, EC1M 6BY

    P2024/0681/ADV Submitted 15 Mar 2024 50 yards away

    Installation of signage to fascia and the replacement of a non- Illuminated Roundel Projecting Sign (Listed building consent P2024/0682 also submitted)

    Granted Advertising 8 docs
  • Warwick House, 64-65 Cowcross Street, London, EC1M 6EG

    P2021/2506/FUL Submitted 26 Aug 2021 50 yards away

    External alterations to the front elevation comprising removal of existing roof canopy, installation of new roof canopy, new balustrading at 4th floor level, painting existing render and window frames, metal mesh to existing 1st floor front planter boxes, alterations to shopfront, new canopy and addition of new signage.

    Granted Full applications Roofing Windows or glazing 24 docs
  • Warwick House, 64-65 Cowcross Street, London, EC1M 6EG

    P2021/2531/ADV Submitted 26 Aug 2021 50 yards away

    Display of externally illuminated sign on the front elevation at 1st floor level.

    Granted Advertising 3 docs
  • 26-27 Cowcross Street, London, EC1M 6DQ

    P2021/2308/ADV Submitted 6 Aug 2021 50 yards away

    Advertisement consent for the installation of replacement externally illuminated fascia signage lettering and a new externally illuminated projecting box sign at fascia level. (listed building consent ref: P2021/2508/LBC also submitted).

    Granted Advertising 7 docs

In Islington

  • P2026/2185/FUL Granted

    43 - 53 Myddelton Square, London, EC1R 1YD

    Retrospective application for installation of 1 gas riser to the rear elevation and installation of micro-stop to existing riser with associated internal works to Flats 1-5.

    Received 12 Aug, published by the council 11 Oct 2026 Full applications
  • P2026/2374/FUL Granted

    Naver House, Upper Street, London N1 1UT

    External alterations to Naver House comprising the installation of an accessible platform lift, alterations to selected external openings including the infilling of an existing rear doorway with facing brickwork to match the existing building, and refurbishment of the existing flat roof areas including associated roof drainage and roof-edge works.

    Received 9 Sep, published by the council 11 Oct 2026 Full applications
  • P2026/1406/FUL Granted

    St John’s Row, Owen Street, London, EC1V 4ND

    Installation of security gate.

    Received 1 Jun, published by the council 29 Sep 2026 Full applications
  • P2026/2047/FUL Granted

    37 Devonia Road, London, N1 8JQ

    Replacement of existing single-glazed timber windows with double-glazed timber units, together with the replacement of the rainwater goods system, fascias and soffits, and associated brickwork and render repairs.

    Received 3 Aug, published by the council 19 Nov 2026 Full applications
  • P2026/2400/FUL Granted

    196 Old Street, London, EC1V 9FR

    Installation of two dry riser inlets at ground floor level with associated recessed cabinets to the St Luke’s building Old Street elevation and to the side wall of the St Luke’s building courtyard entrance.

    Received 11 Sep, published by the council 15 Sep 2026 Full applications