Planning application
First And Second Floor Flat, 54 Offord Road, London, N1 1EB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed internal alterations to first and second floors to amend internal layout, creation of a first floor rear terrace and associated works.
As published by the council, reference P2026/1997/FUL
Application record
- Reference
- P2026/1997/FUL
- Type
- Full Planning Application
- Status
- VALIDATED
- Received
- 16 Jul 2026
- Validated
- 28 Aug 2026
- Ward
- Barnsbury
- Postcode
- N1 1EB
Timeline
Dates from the published record
-
16 Jul 2026
Received by Islington
-
28 Aug 2026
Validated
Checked as complete and ready for consideration.
-
7 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Islington took a median of 53 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Islington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
40 Offord Road, London, N1 1EB
69% historically approved · decision due ~7 Oct
Notification of Prior Approval for the change of use of basement and ground floo
Status unknown Prior approval -
74 Offord Road, London N1 1EB
Replacement of single glazed timber windows with double glazed timber windows to
Granted Full applications Windows or glazing -
40A Offord Road, London, N1 1EB
Replacement of single glazed timber and timber framed windows and with double gl
Granted Full applications Windows or glazing -
82, Flat B, Offord Road, London, N1 1EB
T1 - ash tree (11m) - reduce crown to previous pruning points, approximately 3m
Granted Trees -
58, Flat B, Huntingdon Street, London, N1 1BX
100% historically approved · decision due ~19 Jun
Removal of dead tree.
Awaiting decision Trees 8 docs -
56, Huntingdon Street, London, N1 1BX
The proposed works involve pruning two mature trees located to the rear of 56 H
Granted Trees
Other full applications applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d