Planning application
P2026/1316/FUL
The Gilbert, 40 Finsbury Square, London EC2A 1PX
Proposal
Change of use of part of the lower ground from office (Class E(g)(i)) to a flexible use for office (Class E(g)(i)) or indoor competitive socialising (Sui Generis) including ancillary bar, restaurant, retail and associated facilities, and introduction of ventilation extraction plant and equipment
As published by the council, reference P2026/1316/FUL
Timeline
Dates from the published record
-
20 May 2026
Received by Islington
-
1 Jun 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Islington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P2026/1476/AOD Awaiting decision
38, Finsbury Square, London, EC2A 1PX
Approval of details pursuant to Conditions 3 of planning consent ref: P2020/3548/FUL, dated 18/03/2022 as amended by non-material amendements ref: P2025/2537/NMA dated 16/01/2026.
-
P2026/0074/AOD Granted
38 Finsbury Square, London, EC2A 1PX
Approval of details pursuant to Conditon 14 (Construction Management Plan (CMP) and a Construction Logistics Plan (CLP)) of planning permission ref: P2020/3548/FUL.
-
P2026/1898/S73 Awaiting decision
38, Finsbury Square, London, EC2A 1PX
Variation of condition 9 of Planning Conent Ref: P2020/3548/FUL, dated 18/03/2022, as amended by non-material Ref: P2025/0893/NMA and Ref: P2025/2537/NMA. The amendemnts seeks to extend the operations hours of the roof terrace areas from 7pm to 10pm Monday to Friday.
-
P2026/1739/AOD Awaiting decision
38, Finsbury Square, London
Partial approval of details pursuant to Condition 3 parts A, E and G of planning permission ref P2020/3548/FUL Dated 18/03/2022.
-
P2024/1770/NMA Decided
10 Dominion Street, London
Non-material amendment to planning consent ref: P2016/3636/FUL dated 14/02/2023. The amendments sought are for: - Amendment of Condition 3 (Materials) wording, for clarity purposes, so that the material details required by this condition are submitted ‘prior to commencement of each phase (as defined by condition 15)’. - Amendment of Condition 4 (CEMP) wording, for clarity purposes, so that the CEMP required by this condition is submitted ‘prior to commencement of phase 2’. - Amendment of Condition 8 (Sustainability) wording, for clarity purposes, so that the details required by this condition are submitted ‘prior to commencement of Phase 2 works’ - The insertion of a new Condition 15 to enable planning permission Ref: P2016/3636/FUL to be implemented in 2 phases.
-
P2026/0739/FUL Awaiting decision
10 Dominion Street, Islington, LONDON, EC2M 2EF
Erection of a replacement sixth floor, facade alterations to the existing fifth and sixth floors, a two storey roof extension, including replacement roof plant and alterations to lightwell on the Lackington Street facade.
Other full applications applications
In Islington
-
P2026/1970/FUL Awaiting decision
Garages G12 - 13, Brooksby Mews, London, N1 1EZ
External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.
-
P2025/1883/FUL Granted
68 - 70 and 60 Goswell Road, London, EC1M 7AD
Comprehensive refurbishment of two existing buildings, comprising façade alterations, roof extensions incorporating new terrace space with metal balustrades, installation of photovoltaic (PV) panels, provision of new plant areas with screening, installation of new shopfronts and associated alterations.
-
P2026/1227/FUL Refused
Flat C, 80 Birnam Road, London, N4 3LQ
Erection of L shaped rear dormer roof extension, installation of 2 front rooflights and new windows to rear elevation
-
P2026/1352/FUL Granted
7-13 & 15-21 Wakeham Street, London, N1 3HP
Replacement of single glazed crittal windows with double glazed steel windows to front, side and rear elevations.
-
P2026/1910/FUL Awaiting decision
25 Amwell Street, London, EC1R 1UN
Change of use of the building from an education use (Use Class F1) to a new office, training and collaborative spaces and networking areas (Sui Generis) along with the provision of cycle parking, external plant and other associated works. Removal of modern finishings and fittings; new flooring, lighting and finishes; repair and restoration of historic partitions; refurbishment of joinery and other historic features; overhaul and upgrading of windows and installation of secondary glazing; redecoration; new power lighting and ventilation; retention of historic plaque (internal); minor works to garden including cycle shed and lighting; install M and E and loft insulation, internal lift, ramped access at front [Listed Building Consent P2026/1911/LBC also submitted].