Skip to content
PlanIndex Get alerts
Menu

Planning application

P2026/1060/FUL

15 Tufnell Park Road, London, N7 0PG

Awaiting decision Islington Full Planning Application

Proposal

Subdivision of existing property into 2no. units (1no. 4-bed unit and 1no. 1-bed unit). Repair of external envelope of property, subdivision of garden, installation of staircase, kitchens, bathroom and associated works [Listed Building Consent P2026/1063/LBC also submitted].

As published by the council, reference P2026/1060/FUL

Timeline

Dates from the published record

  1. 22 Apr 2026

    Received by Islington

  2. 24 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Islington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2026/1063/LBC Awaiting decision

    15 Tufnell Park Road, London, N7 0PG

    Subdivision of existing property into 2no. units (1no. 4-bed unit and 1no. 1-bed unit). Repair of external envelope of property, subdivision of garden, installation of staircase, kitchens, bathroom and associated works [Full Planning P2026/1060/FUL also submitted].

    22 Apr 2026 0m away Heritage and listed buildings
  • P2026/1371/FUL Awaiting decision

    413 - 413A Holloway Road, London, N7 6HJ

    Installation of 3 no. Air Conditioning and plant units at rear ground floor level.

    28 May 2026 117m away Full applications
  • P2024/3515/S73 Awaiting decision

    443 - 445, The National Youth Theatre Of Great Britain, Ground And First Floors Blocks D And E, Holloway Road, London, N7 6LJ

    Section 73 application for the variation of condition 2 (approved plans) of Planning Permission Ref: P2019/2469/FUL dated 01/09/2020 which granted full planning permission for a Single storey entrance and studio pavilion with associated landscaping, additional window to the south elevation, and automatic opening vents (AOVs) to windows to comply with fire regulations. The variation seeks to remove the legal covenant in the agreed Section 106 legal agreement, which requires the demolition of the front extension in the event that the NYT vacates the building, sells the leasehold, or makes a formal decision to discontinue the provision of the minimum commitments of the NYT, as secured by the agreement.

    25 Nov 2024 133m away Amendments
  • P2024/2314/PRA Granted

    The National Youth Theatre Of Great Britain, Ground And First Floors Blocks D And E, 443 - 445 Holloway Road, London, N7 6LJ

    Notification of prior approval for the installation of ~39.5kWpe array comprising 92no. Maxeon3 430W Solar PV panels with Solaredge SE40K 40kW Inverter and SolarEdge 950 optimisers, complete with Nicholson Mounting Posts and frames. Array sized to generate approximately 37,000kWh per annum, offsetting approximately 7.2 tonnes CO2 per annum that would otherwise be consumed through grid supplied electricity • Works to existing electrical infrastructure within building to accommodate solar PV array, including new 63A TPN MCCB and submain from existing basement LV Panel Board to rooftop array • Works to improve edge protection around the building to enable safe access for panel maintenance and inspection. • Panels would be sited at least 1m away from roof perimeter and would not be higher than the existing lift motor room being the highest structure, they would not be visible from ground level street view

    30 Jul 2024 133m away Prior approval
  • P2026/0891/PRA Granted

    470 - 474, Holloway Road, London, N7 6HT

    Notification of Prior Approval for the change of use of the first, second and third floors of existing commercial building (Class E) to mixed use and residential accommodation to provide 2 self-contained residential units (Class C3) under 'Class G' of Schedule 2 of the Town and Country Planning (General Permitted Development) Order (GPDO) 2015 (as amended)

    31 Mar 2026 168m away Prior approval
  • P2025/3245/FUL Awaiting decision

    470 - 474, Holloway Road, London

    Change of use of the upper floor levels of the existing commercial building (Class E) to residential accommodation (Class C3) comprising of 5 self-contained units: (1x studio, 3x one bedroom and 1x two bedroom) with associated cycle and refuse storage.

    17 Nov 2025 170m away Full applications

In Islington

  • P2026/1970/FUL Awaiting decision

    Garages G12 - 13, Brooksby Mews, London, N1 1EZ

    External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.

    24 Jul 2026 Full applications
  • P2025/1883/FUL Granted

    68 - 70 and 60 Goswell Road, London, EC1M 7AD

    Comprehensive refurbishment of two existing buildings, comprising façade alterations, roof extensions incorporating new terrace space with metal balustrades, installation of photovoltaic (PV) panels, provision of new plant areas with screening, installation of new shopfronts and associated alterations.

    1 Jul 2025 Full applications
  • P2026/1227/FUL Refused

    Flat C, 80 Birnam Road, London, N4 3LQ

    Erection of L shaped rear dormer roof extension, installation of 2 front rooflights and new windows to rear elevation

    11 May 2026 Full applications
  • P2026/1352/FUL Granted

    7-13 & 15-21 Wakeham Street, London, N1 3HP

    Replacement of single glazed crittal windows with double glazed steel windows to front, side and rear elevations.

    26 May 2026 Full applications
  • P2026/1910/FUL Awaiting decision

    25 Amwell Street, London, EC1R 1UN

    Change of use of the building from an education use (Use Class F1) to a new office, training and collaborative spaces and networking areas (Sui Generis) along with the provision of cycle parking, external plant and other associated works. Removal of modern finishings and fittings; new flooring, lighting and finishes; repair and restoration of historic partitions; refurbishment of joinery and other historic features; overhaul and upgrading of windows and installation of secondary glazing; redecoration; new power lighting and ventilation; retention of historic plaque (internal); minor works to garden including cycle shed and lighting; install M and E and loft insulation, internal lift, ramped access at front [Listed Building Consent P2026/1911/LBC also submitted].

    17 Jul 2026 Full applications