Skip to content
PlanIndex Get alerts
Menu

Planning application

P2026/0095/FUL

169 Junction Road, London, N19 5PZ

Awaiting decision Islington Full Planning Application

Proposal

Change of use of the rear ground floor from commercial (Use Class E) to residential (Use Class C3) to create 1 self-contained studio flat.

As published by the council, reference P2026/0095/FUL

Timeline

Dates from the published record

  1. 14 Jan 2026

    Received by Islington

  2. 27 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Islington for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2026/0846/FUL Granted

    Flat 3, 165 Junction Road, London, N19 5PZ

    Replacement of timber casement windows with double glazed timber sash windows. Replacement of single glazed sash windows on the side and rear of the house with double glazed timber sash windows.

    30 Mar 2026 25m away Full applications
  • P2025/2666/FUL Withdrawn

    124 Junction Road, N19 5LB, London

    Erection of a dormer extension on main rear roof and retrospective subdivision of second floors to provide 2no. self-contained residential units

    19 Sep 2025 30m away Full applications
  • P2025/2632/FUL Awaiting decision

    126 Junction Road, London, N19 5LB

    Erection of a dormer extension on main rear roof.

    16 Sep 2025 31m away Full applications
  • P2025/2740/FUL Awaiting decision

    128 Junction Road, London, N19 5LB

    Erection of a dormer extension on main rear roof.

    29 Sep 2025 31m away Full applications
  • P2026/0528/FUL Awaiting decision

    Monnery Works, 2C Monnery Road, London, N19 5RZ

    Roof replacement including roof extension, replacement windows and doors, creation of courtyard garden, lowering of floor level to lower ground floor, landscaping and installation of PVs and air source heat pump

    25 Feb 2026 60m away Full applications
  • P2025/0702/TRE Awaiting decision

    12 Monnery Road, London, N19 5RZ

    Rear garden: T1: Mature Olive: Approximately 6.00m: Right hand tree: Thin upper crown density by approximately 20%. Reduce overhanging section back from neighbouring property. Pole prune to reduce overlong branches bak to main crown structure by up to approximately 0.50m-1.00m. General maintenance/Control encroachment. T2: Mature Olive: Approximately 6.00m: Left hand tree (leaning): Reduce cown height by approximately 1.20m-1.50m. Thin crown density by 20%. Reduce branches overhanging No.12 back by approximately 1.20m. Reduce over neighbouring property to the left to help control encroachment by up to 1.20m. General maintenance/Control encroachment.

    11 Mar 2025 65m away Trees

In Islington

  • P2026/1970/FUL Awaiting decision

    Garages G12 - 13, Brooksby Mews, London, N1 1EZ

    External refurbishment of Garages G12 and G13, comprising: replacement of existing roof with new flat asphalt roof with three rooflights; replacement of existing front entrance doors with new painted timber bi-fold and tri-fold doors; replacement of existing front clerestory windows with full-width painted timber-framed glazing; replacement of existing rear clerestory windows on a like-for-like basis with timber-framed heritage glazing; and reinstatement of gateway to east elevation of G13.

    24 Jul 2026 Full applications
  • P2025/1883/FUL Granted

    68 - 70 and 60 Goswell Road, London, EC1M 7AD

    Comprehensive refurbishment of two existing buildings, comprising façade alterations, roof extensions incorporating new terrace space with metal balustrades, installation of photovoltaic (PV) panels, provision of new plant areas with screening, installation of new shopfronts and associated alterations.

    1 Jul 2025 Full applications
  • P2026/1227/FUL Refused

    Flat C, 80 Birnam Road, London, N4 3LQ

    Erection of L shaped rear dormer roof extension, installation of 2 front rooflights and new windows to rear elevation

    11 May 2026 Full applications
  • P2026/1352/FUL Granted

    7-13 & 15-21 Wakeham Street, London, N1 3HP

    Replacement of single glazed crittal windows with double glazed steel windows to front, side and rear elevations.

    26 May 2026 Full applications
  • P2026/1910/FUL Awaiting decision

    25 Amwell Street, London, EC1R 1UN

    Change of use of the building from an education use (Use Class F1) to a new office, training and collaborative spaces and networking areas (Sui Generis) along with the provision of cycle parking, external plant and other associated works. Removal of modern finishings and fittings; new flooring, lighting and finishes; repair and restoration of historic partitions; refurbishment of joinery and other historic features; overhaul and upgrading of windows and installation of secondary glazing; redecoration; new power lighting and ventilation; retention of historic plaque (internal); minor works to garden including cycle shed and lighting; install M and E and loft insulation, internal lift, ramped access at front [Listed Building Consent P2026/1911/LBC also submitted].

    17 Jul 2026 Full applications