Skip to content
PlanIndex Get alerts
Menu

Planning application

London Metropolitan University, 166-220 Holloway Road, London, N7 8DB

Granted Islington P2023/0478/FUL Full Planning Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a stainless steel wire mesh on the concrete columns (excluding the windows) for a temporary period of 2 years.

As published by the council, reference P2023/0478/FUL

Application record

Reference
P2023/0478/FUL
Type
Full Planning Application
Status
Decided
Decision
Approve with conditions
Received
15 Feb 2023
Validated
15 Feb 2023
Decided
12 Apr 2023
Ward
Arsenal
Decision by
Delegated
Postcode
N7 8DB

Timeline

Dates from the published record

  1. 15 Feb 2023

    Received by Islington

  2. 12 Apr 2023

    Decision issued: Approve with conditions

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Islington

  • P2026/2205/FUL Status unknown

    Flat 3, 8 Birnam Road, London, N4 3LQ

    Erection of a rear dormer roof extension and a rear roof terrace with a railing

    4 Sep 2026 Full applications
  • P2026/1941/FUL Status unknown

    Flat A, 10 Loraine Road, London, N7 6EZ

    Replacement of an existing external step to access the rear garden.

    3 Sep 2026 Full applications
  • P2026/1722/FUL Refused

    Pavement outside 2-4 Archway Close, London, N19 3TD

    The proposed deployment of a Street Hub 3 unit with associated digital advertise

    13 Jul 2026 Full applications
  • P2026/2280/FUL Status unknown

    Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR

    A new secondary access gate adjacent to the Community Room at Margery Street Com

    3 Sep 2026 Full applications
  • P2026/1507/FUL Granted

    Ground Floor, 257 Caledonian Road, London, N1 1ED

    Alterations to shopfront including new aluminium-composite panels to integrate d

    9 Jun 2026 Full applications