Skip to content
PlanIndex Get alerts
Menu

Planning application

Units 1-3, Stapleton House, 271 -275 Holloway Road, London, N7 8FB

Granted Islington P2024/1269/FUL Full Planning Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Shopfront alterations to the Holloway Road elevation and installation of new ventilation louvre panels to the Eden Road elevation along with associated works.

As published by the council, reference P2024/1269/FUL

Application record

Reference
P2024/1269/FUL
Type
Full Planning Application
Status
FINAL DECISION
Decision
Approve with conditions
Received
16 Apr 2024
Validated
2 Jul 2024
Decided
12 Dec 2024
Ward
Holloway
Decision by
Delegated
Postcode
N7 8FB

Timeline

Dates from the published record

  1. 16 Apr 2024

    Received by Islington

  2. 2 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Dec 2024

    Decision issued: Approve with conditions

  4. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 1-3, Stapleton House, 271-275 Holloway Road, London, N7 8FB

    P2024/1267/FUL Submitted 16 Apr 2024 0m away

    Installation of 2 no. condenser units and refrigeration plant equipment mounted the rear first floor terrace above the commercial units with associated paladin mesh fence enclosure.

    Granted Full applications 20 docs
    Small domestic
  • Stapleton House, 263-289 Holloway Road, London, N7 8FB

    P2024/2373/FUL Submitted 2 Aug 2024 34m away

    Proposed recladding and façade remediation works

    Granted Full applications 22 docs
  • The George Public House, 9 Eden Grove, London, N7 8EE

    P2025/3689/FUL Submitted 24 Dec 2025 74m away

    86% historically approved · decision due ~18 Feb

    Erection of two storey rear extension to facilitate the conversion of the non-operational upper floors of the existing Public House (Sui Generis) to an apart-hotel (Use Class C1), installation of artwork to the side elevation, installation of demountable flat roof to rear, installation of plant enclosure at roof level and associated works.

    Awaiting decision Full applications Extension 26 docs
  • Bus Shelter, Pavement Opposite Brockway House, London, N7 8HF

    P2025/3297/ADV Submitted 21 Nov 2025 74m away

    Display of internally illuminated sequential advertisements in a bus shelter (ca

    Granted Advertising
  • London Metropolitan University, 166-220 Holloway Road, London, N7 8DB

    P2023/0478/FUL Submitted 15 Feb 2023 82m away

    Installation of a stainless steel wire mesh on the concrete columns (excluding the windows) for a temporary period of 2 years.

    Granted Full applications Windows or glazing 18 docs
  • Railway Arch 2, 303 Holloway Road, London, N7 8HS

    P2026/0194/S73 Submitted 17 Feb 2026 83m away

    Section 73 Application for the removal/variation of condition 9 of planning cons

    Granted Amendments

In Islington

  • P2026/2205/FUL Status unknown

    Flat 3, 8 Birnam Road, London, N4 3LQ

    Erection of a rear dormer roof extension and a rear roof terrace with a railing

    4 Sep 2026 Full applications
  • P2026/1941/FUL Status unknown

    Flat A, 10 Loraine Road, London, N7 6EZ

    Replacement of an existing external step to access the rear garden.

    3 Sep 2026 Full applications
  • P2026/1722/FUL Refused

    Pavement outside 2-4 Archway Close, London, N19 3TD

    The proposed deployment of a Street Hub 3 unit with associated digital advertise

    13 Jul 2026 Full applications
  • P2026/2280/FUL Status unknown

    Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR

    A new secondary access gate adjacent to the Community Room at Margery Street Com

    3 Sep 2026 Full applications
  • P2026/1507/FUL Granted

    Ground Floor, 257 Caledonian Road, London, N1 1ED

    Alterations to shopfront including new aluminium-composite panels to integrate d

    9 Jun 2026 Full applications