Planning application
Land Between 24 And 26 Newport Street Ryde Isle Of Wight
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Proposed construction of terrace of three dwellings with associated access, private amenity space, refuse and cycle storage, landscaping, drainage works and reinstatement of vehicular crossover
As published by the council, reference 26/01289/FUL
Application record
- Reference
- 26/01289/FUL
- Category
- Full applications
- Status
- Registered
- Received
- 16 Sep 2026
- Validated
- 23 Sep 2026
- Ward
- Ryde North West
Timeline
Dates from the published record
-
16 Sep 2026
Received by Isle of Wight
-
23 Sep 2026
Validated
Checked as complete and ready for consideration.
-
23 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Isle of Wight took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
- SITE NOTICE
- APPLICATIONFORMREDACTED
- ATTACHMENTSUMMARY
- 01_PLANNING_DESIGN_ACCESS_HERITAGE_STATEMENT
- 02_HIGHWAYS_PARKING_SUSTAINABLE_TRAVEL_STATEMENT
- 03_DRAINAGE_FOUL_UTILITIES_NITRATES_STATEMENT
- 04_BIODIVERSITY_NET_GAIN_EXEMPTION_STATEMENT
- 251113 PRE-APPLICATION PLANNING ADVICE 23 24 25 NEWPORT STREET RYDE
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-001 LOCATION PLAN
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-002 EXISTING SITE PLAN
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-003 PROPOSED SITE PLAN
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-004 PROPOSED FLOOR PLANS
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-005 PROPOSED FRONT AND REAR EL
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-006 PROPOSED SIDE ELEVATIONS
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-007 SECTIONS
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-009 STREET SCENE PROPOSED
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-008 STREET SCENE EXISTING
- NEWPORT STREET RYDE - PLANNING DRAWINGS - 2026-PL-010 STREET SCENE VISUAL
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Isle of Wight for determination, against a statutory target of eight weeks. Over the last year Isle of Wight decided full applications in a median of 71 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Isle of Wight
-
26/01450/FUL Awaiting decision
Northwood House Ward Avenue Cowes Isle Of Wight PO31 8AZ
Proposed installation of 84 roof mounted solar panels on the west, east and south wings
-
26/01448/FUL Awaiting decision
Skinners Farmhouse Skinners Farm Pallance Road Northwood Cowes Isle Of Wight PO31 8LX
Demolition and replacement building to provide storage and a single bedroom unit of holiday accommodation
-
26/01434/FUL Awaiting decision
64 Forest Road Newchurch Sandown Isle Of Wight PO36 0JZ
Demolition of rear extension; Proposed two storey/single storey rear extension and new slate roof to existing dwelling; carport; replacement windows
-
26/01437/FUL Awaiting decision
Former Liberal Club 13 Denmark Road Cowes Isle Of Wight PO31 7SY
Repositioning of external staircase to first floor apartment from the south west elevation to the north east elevation; provision of security gate to new staircase; alterations to fenestration to north east elevation
-
26/01432/FUL Awaiting decision
Aldi Foodstore Ltd Brading Road Ryde Isle Of Wight PO33 1QG
Extension of the approved customer car park to provide 23 additional parking spaces, comprising a revised car park layout, associated landscaping and infrastructure works