Skip to content
PlanIndex Get alerts
Menu

Planning application

25/01619/FUL

Land At & To The South Of Sandown Wastewater Treatment Works (WTW), East Yar Road, Sandown, Isle Of Wight, PO36 9AX & Extending 3km West From The WTW To The Eastern Yar (Lower) Immediately Upstream Of The Alverstone Weir

Awaiting decision Isle of Wight Full Planning Permission

Proposal

Water Recycling Project comprising the construction of a Water Recycling Plant (WRP) on land to the south of Sandown Wastewater Treatment Works, an outfall to release purified recycled water into the Eastern Yar (Lower) just upstream of the Alverstone weir, and a new below-ground pipeline to transfer purified recycled water from the new WRP to the Eastern Yar (Lower) at Alverstone and associated development to construct and operate the project, to include temporary construction compounds/laydown areas and associated access off Alverstone Road, College Close, Greenwood Lane and Kern Lane, with minor alterations to the junction of Greenwood Lane with the A3055 Morton Common/Morton Road and temporary pedestrian footpath north of Greenwood Lane (Environmental Statement submitted) (revised plans and additional information submitted - including amended site area, arboricultural report, archaeological evaluation reports, outline construction traffic management plan and enabling activities report) (revised description) (readvertised application)

As published by the council, reference 25/01619/FUL

Timeline

Dates from the published record

  1. 6 Nov 2025

    Received by Isle of Wight

  2. 6 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 27 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Isle of Wight for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

In Isle of Wight

  • 26/00698/FUL Granted

    GKN Aerospace Services Saunders Way East Cowes Isle Of Wight PO32 6LR

    Demolition of existing industrial building; Proposed industrial building, to include relocation of external plant equipment

    22 May 2026 Full applications
  • 26/00689/FUL Granted

    101 St James Street Newport Isle Of Wight PO30 1HX

    Proposed replacement entrance door

    21 May 2026 Full applications
  • 25/01439/FUL Granted

    Spinlock 41 Birmingham Road Cowes Isle Of Wight PO31 7BH

    Proposed change of use from office to a single dwellinghouse with alterations including replacement of sky lounge; roof terrace; balustrading; alterations to fenestration; new porch (Revised description)(readvertised application).

    1 Oct 2025 Full applications
  • 26/00617/FUL Refused

    90 Sandown Road Sandown Isle Of Wight PO36 9JX

    Proposed alterations and conversion of hotel (C1) to form HMO (sui generis)

    8 May 2026 Full applications
  • 26/00605/FUL Granted

    57 Manners View Newport Isle Of Wight PO30 5FA

    Proposed installation of extraction ventilation system (Revised plans, not showing container)

    6 May 2026 Full applications