Planning application
Stena Land Holdings, London Road, Caergybi / Holyhead.
Works: Trees
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at
As published by the council, reference TPO/2025/10
Application record
- Reference
- TPO/2025/10
- Type
- Trees
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 27 May 2025
- Validated
- 27 May 2025
- Decided
- 21 Jul 2025
- Ward
- Tref Cybi
- Parish
- Holyhead
- Decision by
- Delegated
Timeline
Dates from the published record
-
27 May 2025
Received by Isle of Anglesey
-
21 Jul 2025
Decision issued: Caniatáu / Permit
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 21 July 2025, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About tree works applications
Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Penrhos Works, Caergybi/Holyhead.
Barn Sgrinio ar gyfer System Storio Ynni Batri (BESS) a gwaith cysylltiedig yn / Screening Opinion Outline for a Battery Energy Storage System (BESS) together with associated development at
Decided Outline -
Parc Ffyniant / Prosperity Park, Caergybi/Holyhead
Cais i ryddhau amod (06)(Cynllun Rheoli Amgylcheddol Dymchwel ac Adeiladu) and (21)(Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio OP/2025/2 yn / Application to discharge condition (06)(Demolition and Construction Environmental Management Plan) and (21)(Construction Traffic Management Plan) of planning permission OP/2025/2 at
Granted Conditions Demolition 4 docs -
Parc Ffyrniant / Prosperity Parc, Caergybi / Holyhead
Cais amlinellol gyda'r holl faterion wedi ei cadw'n ol ar gyfer System Storio Ynni Batri (BESS) a gwaith cysylltiedig yn / Outline application with all matters reserved for a Battery Energy Storage System (BESS) together with associated development at
Granted Outline 15 docs -
Parc Ffyrniant / Prosperity Park, Caergybi/Holyhead
Barn sgrinio ar gyfer ailddatblygiad y safle i gynnwys dymchwel strwythurau ac adeiladau er mwyn galluogi adeiladu man cyflogaeth newydd yn cynnwys man diwydiannol cyffredinol (defnydd dosbarth B2), storio a dosbarthu (defnydd dosbarth B8), datblygiad diwydiannol ysgafn ac ymchwil (defnydd dosbarth B1) a storio egni batris yn / Screening opinion for the redevelopment of the site to include demolition of structures and buildings to enable the construction of new employment floorspace including general industrial (use class B2), storage and distribution (use class B8), light industrial and research development (use class B1) and battery energy storage at
Decided Outline Demolition 2 docs -
Penrhos Works, Caergybi/Holyhead.
Barn sgrinio ar gyfer bennu os oes angen caniatâd blaenorol ar gyfer dymchwel adeiladau a simne yn / Screening Opinion to determine whether prior approval is required for the demolition of buildings and a chimney stack at
Decided Outline Demolition -
Penrhos Works, Caergybi/Holyhead
Barn Sgrinio i ddiwygio amod (02) (cynlluniau a gymeradwywyd) o ganiatâd cynllunio rhif FPL/2023/189 (Adeiladu a gweithredu is-orsaf 132kV gydag isadeiledd cysylltiedig yn cynnwys ffensys, trac mynediad newydd a cheblau tanddaearol) er mwyn diwygio'r dyluniad yn / Screening opinion to vary condition (02) (approved plans) of planning permission reference FPL/2023/189 (Construction and operation of a 132kV substation with associated infrastructure, including fencing, new access track and underground cables) so as to amend the design at
Decided Conditions 5 docs
Other tree works applications
In Isle of Anglesey
-
TPO/2026/4 Withdrawn
Craig Selyf, Ffordd Telford Road, Porthaethwy / Menai Bridge.
Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at
-
TPO/2026/8 Withdrawn
Merlyns, Stad Bryn Hyfryd, Llanfaes
Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to a trees protected by a Tree Preservation Order at
-
TPO/2026/6 Granted
Glan Aber, Lon Glanhwfa Road, Llangefni.
Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at
-
FPL/2025/257 Granted
Dewis Dyddyn, Bodorgan
Cais llawn ar gyfer dymchwel yr adeilad allanol presennol a chodi adeilad allanol newydd i'w ddefnyddio fel ystafell gemau a storfa, addasu'r garej bresennol yn ogystal â newid defnydd tir ar gyfer gosod dau dwnnel polythen, creu llyn a plannu llysiau/coed yn / Full application for the demolition of the existing outbuilding and the erection of a new outbuilding for use as a games room and storage, alterations to the existing garage together with the change of use of land for the siting of two poly tunnels, the creation of a pond and vegetable/tree planting at
-
TPO/2026/3 Granted
Penygroes, Lon Ganol, Llandegfan.
Cais i leihau uchder coeden sydd wedi'i warchod gan Orchymyn Diogelu Coed yn / Application to reduce the height of a tree protected by a Tree Preservation Order at