Planning application
Tir yn Porth Amlwch / Land at Amlwch Port.
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn Sgrinio ar gyfer creu parc cyhoeddus gan gynnwys tirlunio caled a meddal, man chwarae, codi strwythurau parciau, rheoleiddio llwybrau troed presennol, a chreu llwybrau troed newydd a llwybrau pren yn / Screening Opinion for the creation of a public park including hard and soft landscaping, play space, erection of park structures, regularisation of existing footpaths, and creation of new footpaths and boardwalks at
As published by the council, reference SCR/2023/46
Application record
- Reference
- SCR/2023/46
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 10 Aug 2023
- Validated
- 10 Aug 2023
- Decided
- 31 Aug 2023
- Ward
- Twrcelyn
- Parish
- Amlwch
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
FPL/2024/29 Granted
Tir yn Porth Amlwch / Land at Amlwch Port.
Cais llawn ar gyfer creu parc cyhoeddus yn cynnwys gwaith tirlunio caled a meddal, lle chwarae, codi strwythurau, rheoleiddio llwybrau troed presennol, creu llwybrau troed newydd a llwybrau pren ynghyd ag adeiladu lle parcio anabl yn / Full application for the creation of a public park including hard and soft landscaping, play space, erection of structures, regularisation of existing footpaths, creation of new footpaths and boardwalks together with construction of disabled car parking at
Timeline
Dates from the published record
-
10 Aug 2023
Received by Isle of Anglesey
-
31 Aug 2023
Decision issued: Dim Angen AEA / EIA Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Tir yn Porth Amlwch / Land at Amlwch Port.
Cais llawn ar gyfer creu parc cyhoeddus yn cynnwys gwaith tirlunio caled a meddal, lle chwarae, codi strwythurau, rheoleiddio llwybrau troed presennol, creu llwybrau troed newydd a llwybrau pren ynghyd ag adeiladu lle parcio anabl yn / Full application for the creation of a public park including hard and soft landscaping, play space, erection of structures, regularisation of existing footpaths, creation of new footpaths and boardwalks together with construction of disabled car parking at
Granted Full applications 55 docs -
Twr Gwylio/ Amlwch Watchtower, Amlwch.
Cais ar gyfer amnewid arwydd dehongli yn / Application for the replacement of interpretation sign at
Granted Advertising 6 docs -
Twr Gwylio / Amlwch Watchtower, Amlwch.
Cais i ryddhau amod (08) (Cynnwys dylunio terfynol yr arwydd) o ganiatâd cynllunio ADV/2023/6 (Cais ar gyfer amnewid arwydd dehongli) yn / Application to discharge condition (08) (Final design content of the sign) of planning permission ADV/2023/6 (Application for the replacement of interpretation sign) at
Granted Advertising 7 docs -
Amlwch Watchtower, Amlwch.
Cais ar gyfer amnewid arwydd dehongli yn / Application for the replacement of interpretation sign at
Granted Advertising 6 docs -
Adeilad Terfynell Morol/Marine Terminal Building, Porth Amlwch/Amlwch Port, Amlwch
Cais llawn ar gyfer adfer ac addasu ynghyd a gwaith tirlunio cysylltiedig yn y cyn / Full application for refurbishment and alterations together with associated landscape works at the former
Granted Full applications 25 docs -
Maes Ednyfed, Amlwch
Cais o dan Adran 73 ar gyfer amrywio amod (08) (draenio) o ganiatad cynllunio cyfeirnod (FPL/2022/126) (codi tri annedd newydd) er mwyn cyflwyno manylion ar ol i gwaith gychwyn ar y safle yn / Application under Section 73 for the variation of condition (08) (drainage) of planning permission reference (FPL/2022/126) (erection of three new dwellings) as so to allow details to be presented after the commencement of work on site at
Refused Conditions New dwelling 4 docsSeveral homes
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at