Planning application
Angorfa, Traeth Coch/Red Wharf Bay, Pentraeth
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn Sgrinio ar gyfer codi annedd fforddiadwy ynghyd a gosod system trin carthffosiaeth a datblygiad cysylltiedig ar dir ger / Screening Opinion for the erection of an affordable dwelling together with the installation of a sewage treatment plant and associated development on land adjacent to
As published by the council, reference SCR/2023/36
Application record
- Reference
- SCR/2023/36
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 27 Jun 2023
- Validated
- 3 Jul 2023
- Decided
- 27 Jul 2023
- Ward
- Lligwy
- Parish
- Llanfair M.E.
- Decision by
- Delegated
Timeline
Dates from the published record
-
27 Jun 2023
Received by Isle of Anglesey
-
3 Jul 2023
Validated
Checked as complete and ready for consideration.
-
27 Jul 2023
Decision issued: Dim Angen AEA / EIA Not Required
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Angorfa, Traeth Coch/Red Wharf Bay, Pentraeth
Cais llawn ar gyfer codi annedd fforddiadwy, gosod system trin carthffosiaeth a gwaith cysylltiedig ar dir ger / Full application for the erection of an affordable dwelling, installation of a sewage treatment plant and associated work on land adjacent to
Refused Full applications 11 docsDomestic -
1 Parc Tyddyn, Traeth Coch / Red Wharf Bay
Cais llawn ar gyfer addasu ac ehangu yn / Full application for extensions and alterations at
Granted Full applications Extension 6 docs -
Pont Y Cerrig, Traeth Coch/ Red Wharf Bay
Rhybudd Eithriad Trydan ar gyfer gwyriad o llinell gorbenion foltedd isel presennol yn/ Electricity Exemption Notice for diversion of existing low voltage overhead line at
Granted Other 2 docs -
Pont y Cerrig, Red Wharf Bay.
Cais o dan Adran 73 i ddiwygio amod (02) o caniatâd cynllunio rhif HHP/2021/419 (addasu ac ehangu) er mwyn diwygio'r dyluniad yn / Application under Section 73 for the variation of condition (02) of planning permission reference HHP/2021/419 (alterations and extensions) so as to amend the design at
Granted Conditions Extension 5 docs -
Pont y Cerrig, Red Wharf Bay
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 7 docs -
3 Traeth Coch Uchaf, Red Wharf Bay, Pentraeth
Cais llawn ar gyfer gosod phaneli solar ar y to yn / Full application for the installation of solar panels on the roof at
Granted Full applications 11 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to