Skip to content
PlanIndex Get alerts
Menu

Planning application

Llynfor, Llanfaelog

Decided Isle of Anglesey SCR/2023/25 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer fferm solar yn / Screening opinion for a solar farm at

As published by the council, reference SCR/2023/25

Application record

Reference
SCR/2023/25
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
27 Apr 2023
Validated
27 Apr 2023
Decided
6 Jun 2023
Ward
Crigyll
Parish
Llanfaelog
Decision by
Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 2 applications since 2022.

  • FPL/2022/334 Withdrawn

    Llynfor, Llanfaelog

    Cais llawn ar gyfer fferm solar yn / Full application for a solar farm at

    Decided 7 Sep 2023 Full applications

Timeline

Dates from the published record

  1. 27 Apr 2023

    Received by Isle of Anglesey

  2. 6 Jun 2023

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Llynfor, Station Road, Llanfaelog

    FPL/2021/199 Submitted 27 May 2021 0m away

    Cais llawn ar gyfer ymestyn y cwrtil preswyl ynghyd a codi anecs yn / Full application for extension to residential curtilage together with the erection of annexe at

    Granted Full applications Extension 7 docs
  • Llynfor, Llanfaelog

    FPL/2022/334 Submitted 23 Dec 2022 0m away

    Cais llawn ar gyfer fferm solar yn / Full application for a solar farm at

    Withdrawn Full applications 9 docs
  • Coedmor,Station Road ,Llanfaelog

    TPO/2021/30 Submitted 1 Dec 2021 171m away

    Cais i wneud gwaith ar coed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn/ Application for works to trees protected by a Tree Preservation Order at

    Granted Trees 5 docs
  • Coed Môr, Llanfaelog

    OP/2022/9 Submitted 16 Sep 2022 197m away

    Cais amlinellol gyda holl faterion wedi ei gadw yn ôl ar gyfer dymchwel 3 adeilad presennol ynghyd â codi 4 annedd newydd a'r dir yn / Outline application with all matters reserved for the demolition of 3 existing buildings together with the erection of 4 new dwellings on land at

    Decided Outline New dwelling Demolition
    Several homes
  • 1 Rehoboth Terrace, Station Road, Rhosneigr

    FPL/2023/332 Submitted 10 Nov 2023 205m away

    Cais ôl-weithredol ar gyfer mynedfa newydd yn / Retrospective application for a new access at

    Refused Amendments 10 docs
  • 1 Rehoboth Terrace, Station Road, Rhosneigr.

    FPL/2023/247 Submitted 4 Sep 2023 205m away

    Cais ôl-weithredol ar gyfer mynedfa newydd yn / Retrospective application for a new access at

    Refused Amendments 9 docs

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • SCR/2026/20 Decided

    Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

    Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

    17 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to

    20 Nov 2025 Outline