Skip to content
PlanIndex Get alerts
Menu

Planning application

Ynys Y Big, Ffordd Biwmares, Glyn Garth, Porthaethwy / Ynys Y Big, Beaumaris Road, Glyngarth, Menai Bridge

Decided Isle of Anglesey SCR/2023/22 Screening Opinion

Works: New dwelling Demolition Domestic

Read from the description, not a valuation. How we read the register

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer dymchwel yr annedd presennol ynghyd â chodi annedd a garej newydd ynghyd a gwaith cysylltiedig yn / Screening opinion for the demolition of the existing dwelling together with the erection of new dwelling and garage together with associated works at

As published by the council, reference SCR/2023/22

Application record

Reference
SCR/2023/22
Type
Screening Opinion
Status
Closed
Decision
Dim Angen AEA / EIA Not Required
Received
14 Apr 2023
Validated
17 Apr 2023
Decided
18 Apr 2023
Ward
Seiriol
Parish
Cwm Cadnant
Decision by
Dirprwyedig / Delegated

Timeline

Dates from the published record

  1. 14 Apr 2023

    Received by Isle of Anglesey

  2. 17 Apr 2023

    Validated

    Checked as complete and ready for consideration.

  3. 18 Apr 2023

    Decision issued: Dim Angen AEA / EIA Not Required

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Ynys Y Big, Ffordd Biwmares Road, Glyn Garth, Porthaethwy / Menai Bridge

    HHP/2025/195 Submitted 28 Nov 2025 0m away

    Dymchwel, addasu ac ehangu'r tŷ cychod presennol ar gyfer defnydd fel man adloniant a tŷ cychod atodol ynghyd a gwaith cysylltiedig yn / Demolition, alterations and extensions to existing boathouse for use as ancillary recreation space and boathouse together with associated works at

    Decided Householder Extension Demolition 22 docs
    Domestic
  • Ynys Y Big, Ffordd Biwmares, Glyn Garth, Porthaethwy / Ynys Y Big, Beaumaris Road, Glyngarth, Menai Bridge

    FPL/2022/289 Submitted 4 Nov 2022 0m away

    Cais llawn ar gyfer dymchwel yr annedd presennol ynghyd â chodi annedd a garej newydd ynghyd a gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling together with the erection of new dwelling and garage together with associated works at

    Granted Full applications New dwelling Demolition 25 docs
    Domestic
  • Ynys y Big, Ffordd Biwmares / Beaumaris Road, Glyn Garth, Porthaethwy / Menai Bridge.

    TPO/2023/21 Submitted 18 Oct 2023 0m away

    Cais i wneud gwaith ar goed sydd wedi eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to trees protected by a Tree Preservation Order at

    Granted Trees 9 docs
  • Ynys Y Big, Ffordd Biwmares, Glyn Garth, Porthaethwy / Ynys Y Big, Beaumaris Road, Glyngarth, Menai Bridge

    FPL/2020/182 Submitted 24 Sep 2020 0m away

    Cais llawn ar gyfer dymchwel yr annedd a’r garej presennol ynghyd â chodi annedd a garej newydd yn eu lle, gosod sustem trin carthffosiaeth a gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling and garage together with the erection of a replacement dwelling and garage block, installation of new package treatment plant and associated works at

    Refused Full applications Demolition 25 docs
    Domestic
  • Ynys Y Big, Ffordd Biwmares Rd, Glyn Garth, PorthaethwyMenai Bridge

    DIS/2025/70 Submitted 28 Oct 2025 0m away

    Cais i ryddhau amodau (04) (Goleuadau Allanol) a (10) (Asesiad Risg Bioddiogelwch) o ganiatâd cynllunio FPL/2022/289 (Dymchwel yr annedd presennol ynghyd â chodi annedd a garej newydd ynghyd a gwaith cysylltiedig) yn / Application to discharge conditions (04) (External Lighting) and (10) (Biosecurity Risk Assessment) of planning permission FPL/2022/289 (Demolition of the existing dwelling together with the erection of new dwelling and garage together with associated works) at

    Decided Conditions New dwelling Demolition 7 docs
    Domestic
  • Aran Hold, Ffordd Biwmares / Beaumaris Road, Glyn Garth, Porthaethwy / Menai Bridge

    TPO/2022/21 Submitted 5 Oct 2022 155m away

    Cais i wneud gwaith ar coeden sydd wedi ei/eu gwarchod gan Orchymyn Diogelu Coed yn / Application for works to a tree protected by a Tree Preservation Order at

    Granted Trees 6 docs

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • SCR/2026/20 Decided

    Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

    Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

    17 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to

    20 Nov 2025 Outline