Planning application
Bryn Maelog, Ffordd Belan, Rhosneigr
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer dymchwel y gwesty hunanarlwyo presennol a chodi gwesty hunanarlwyo yn ei le ynghyd a datblygiad cysylltiedig yn / Screening opinion for the demolition of the existing self-catered guesthouse and the erection of a replacement self-catered guesthouse together with associated development at
As published by the council, reference SCR/2022/23
Application record
- Reference
- SCR/2022/23
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 17 May 2022
- Validated
- 20 May 2022
- Decided
- 13 Jun 2022
- Ward
- Crigyll
- Parish
- Llanfaelog
- Decision by
- Delegated
Timeline
Dates from the published record
-
17 May 2022
Received by Isle of Anglesey
-
20 May 2022
Validated
Checked as complete and ready for consideration.
-
13 Jun 2022
Decision issued: Dim Angen AEA / EIA Not Required
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Bryn Maelog, Ffordd Belan, Rhosneigr
Cais llawn i ddymchwel y gwesty hunanarlwyo presennol a chodi gwesty hunanarlwyo yn ei le ynghyd a datblygiad cysylltiedig yn / Full application for the demolition of the existing self-catered guesthouse and the erection of a replacement self-catered guesthouse together with associated development at
Granted Full applications Demolition 20 docs -
Bryn Maelog, Ffordd Belan, Rhosneigr
Cais i ryddhau amod (10)(Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio FPL/2022/124 yn / Application to discharge condition (10)(Construction Traffic Management Plan) of planning permission FPL/2022/124 at
Decided Conditions 4 docs -
Bryn Maelog, , Rhosneigr
Cais am dystysgrif defnydd presennol o’r datblygiad oherwydd bod gwaith sylweddol wedi cychwyn ar ganiatad FPL/2022/124 er mwyn diogelu’r caniatâd hwnnw ar dir yn / Application for a certificate of existing use or development in relation to a material start having been made on permission FPL/2022/124 thus safeguarding the consent on land at
Decided Amendments 5 docs -
Iscoed, Ger y Môr,Rhosneigr
Cais llawn ar gyfer addasu ag ehangu ynghyd a codi balconi yn/ Full application for alterations and extensions together with the erection of a balcony at
Granted Full applications Extension 6 docs -
Edelweiss, 5 Chelford Close, Rhosneigr
Cais llawn ar gyfer dymchwel rhannol, addasu ac ehangu ynghyd â gwaith tirlunio cysylltiedig yn/ Full application for part demolition, alterations and extensions together with associated landscaping work at
Granted Full applications Extension Demolition 8 docs -
Bear House, Stad Belan Estate, Rhosneigr
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 10 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to