Planning application

Sibrwd y Ffair, Benllech

Decided Isle of Anglesey SCR/2021/88 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Cais barn sgrinio ar gyfer cais ol-weithredol ar gyfer gosod 4 cabannau gwyliau (2 cwt bugail a 2 pod 'glamping') yn / Screening opinion application for the retrospective application for the siting of 4 holiday cabins (2 shepherd huts and 2 glamping pods) at

As published by the council, reference SCR/2021/88

Application record

Reference
SCR/2021/88
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
3 Dec 2021
Validated
3 Dec 2021
Decided
23 Dec 2021
Ward
Lligwy
Parish
Llanfair M.E.
Decision by
Delegated

Timeline

Dates from the published record

  1. 3 Dec 2021

    Received by Isle of Anglesey

  2. 23 Dec 2021

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 29 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Sibrwd y Ffair, Benllech

    FPL/2021/343 Submitted 3 Dec 2021 0m away

    Cais ol-weithredol ar gyfer gosod 4 cabannau gwyliau (2 cwt bugail a 2 pod 'glamping') yn / Retrospective application for the siting of 4 holiday cabins (2 shepherd huts and 2 glamping pods) at

    Refused Amendments 11 docs
  • Hunters Cottage, 3 Pont Y Pandy, Tyn Y Gongl

    FPL/2023/123 Submitted 22 May 2023 36m away

    Cais llawn ar gyfer codi anecs yn / Full application for the erection of an annex at

    Refused Full applications 6 docs
  • Hunters Cottage, 3 Pont y Pandy, Tyn y Gongl

    FPL/2022/312 Submitted 2 Dec 2022 36m away

    Cais ol-weithredol am shed yn / Retrospective application for a shed at

    Granted Amendments 6 docs
    Small domestic
  • Harela, Benllech, Tyn y Gongl.

    HHP/2026/20 Submitted 4 Feb 2026 78m away

    Cais llawn ar gyfer ymestyn y cwrtil preswyl, codi sied ynghyd a caniatad ôl-weithredol ar gyfer defnyddio rhan o'r tir fel rhan o'r cwrtil preswyl yn / Full application for an extension to the residential curtilage, erection of a shed together with retrospective approval for use of part of land as part of residential curtilage at

    Granted Amendments Extension 4 docs
    Small domestic
  • 10 Swn Y Don, Benllech

    HHP/2021/408 Submitted 30 Nov 2021 158m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 7 docs
  • Gorllwyn, Benllech

    HHP/2025/204 Submitted 22 Dec 2025 174m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 12 docs

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • SCR/2026/20 Decided

    Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

    Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

    17 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to