Planning application
Sibrwd y Ffair, Benllech
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Cais barn sgrinio ar gyfer cais ol-weithredol ar gyfer gosod 4 cabannau gwyliau (2 cwt bugail a 2 pod 'glamping') yn / Screening opinion application for the retrospective application for the siting of 4 holiday cabins (2 shepherd huts and 2 glamping pods) at
As published by the council, reference SCR/2021/88
Application record
- Reference
- SCR/2021/88
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 3 Dec 2021
- Validated
- 3 Dec 2021
- Decided
- 23 Dec 2021
- Ward
- Lligwy
- Parish
- Llanfair M.E.
- Decision by
- Delegated
Timeline
Dates from the published record
-
3 Dec 2021
Received by Isle of Anglesey
-
23 Dec 2021
Decision issued: Dim Angen AEA / EIA Not Required
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Sibrwd y Ffair, Benllech
Cais ol-weithredol ar gyfer gosod 4 cabannau gwyliau (2 cwt bugail a 2 pod 'glamping') yn / Retrospective application for the siting of 4 holiday cabins (2 shepherd huts and 2 glamping pods) at
Refused Amendments 11 docs -
Hunters Cottage, 3 Pont Y Pandy, Tyn Y Gongl
Cais llawn ar gyfer codi anecs yn / Full application for the erection of an annex at
Refused Full applications 6 docs -
Hunters Cottage, 3 Pont y Pandy, Tyn y Gongl
Cais ol-weithredol am shed yn / Retrospective application for a shed at
Granted Amendments 6 docsSmall domestic -
Harela, Benllech, Tyn y Gongl.
Cais llawn ar gyfer ymestyn y cwrtil preswyl, codi sied ynghyd a caniatad ôl-weithredol ar gyfer defnyddio rhan o'r tir fel rhan o'r cwrtil preswyl yn / Full application for an extension to the residential curtilage, erection of a shed together with retrospective approval for use of part of land as part of residential curtilage at
Granted Amendments Extension 4 docsSmall domestic -
10 Swn Y Don, Benllech
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 7 docs -
Gorllwyn, Benllech
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 12 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to