Skip to content
PlanIndex Get alerts
Menu

Planning application

Parc Carafanau Nant Newydd Caravan Park, Brynteg

Decided Isle of Anglesey SCR/2021/28 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgrinio ar gyfer trosi 53 llain carafanau teithiol tymhorol yn 49 o garafanau gwyliau statig, ynghyd ag ail-osod a gwella ardal deithiol y parc a gwneud gwelliannau amgylcheddol yn / Screening opinion for the conversion of 53 seasonal touring caravan pitches to 49 static holiday caravans, along with the re-layout and improvement of the touring area of the park and environmental improvements at

As published by the council, reference SCR/2021/28

Application record

Reference
SCR/2021/28
Type
Outline
Status
Permitted
Decision
Dim Angen AEA / EIA Not Required
Received
28 Apr 2021
Validated
28 Apr 2021
Decided
17 May 2021
Ward
Lligwy
Parish
Llaneugrad
Decision by
Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 2 applications since 2021: 0 approved, 1 refused.

  • FPL/2021/96 Refused

    Parc Carafanau Nant Newydd Caravan Park, Brynteg

    Cais llawn i drosi 53 llain carafanau teithiol tymhorol yn 49 o garafanau gwyliau statig, ynghyd ag ail-osod a gwella ardal deithiol y parc a gwneud gwelliannau amgylcheddol yn / Full application for the conversion of 53 seasonal touring caravan pitches to 49 static holiday caravans, along with the re-layout and improvement of the touring area of the park and environmental improvements at

    Decided 17 Jun 2021 Full applications

Timeline

Dates from the published record

  1. 28 Apr 2021

    Received by Isle of Anglesey

  2. 17 May 2021

    Decision issued: Dim Angen AEA / EIA Not Required

  3. 19 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Parc Carafanau Nant Newydd Caravan Park, Brynteg

    FPL/2021/96 Submitted 28 Apr 2021 50 yards away

    Cais llawn i drosi 53 llain carafanau teithiol tymhorol yn 49 o garafanau gwyliau statig, ynghyd ag ail-osod a gwella ardal deithiol y parc a gwneud gwelliannau amgylcheddol yn / Full application for the conversion of 53 seasonal touring caravan pitches to 49 static holiday caravans, along with the re-layout and improvement of the touring area of the park and environmental improvements at

    Refused Full applications 13 docs
  • Tŷ Coch, Brynteg

    FPL/2023/344 Submitted 28 Nov 2023 450 yards away

    Cais llawn ar gyfer codi sied amaethyddol i storio peiriannau/gwair a bwyd anifeiliaid ynghyd a ffurfio mynedfa newydd a creu trac newydd i gerbydau ar dir yn / Full application for the erection of an agricultural shed for the storage of machinery/hay and animal feed together with the formation of a new access and the creation of a vehicular track on land at

    Granted Full applications 3 docs
    Small domestic
  • Damedma, Brynteg

    FPL/2023/95 Submitted 13 Apr 2023 0.3 miles away

    Cais llawn i godi sied amaethyddol newydd ar gyfer storio gwair, gwellt ac anifeiliaid ynghyd a gosod trac amaethyddol yn / Full application for the erection of a new agricultural shed for storage of hay, straw and animals together with the the laying of an agricultural track at

    Granted Full applications 8 docs
    Small domestic
  • Tyddyn Traian, Brynteg

    FPL/2024/235 Submitted 21 Aug 2024 0.3 miles away

    Cais llawn ar gyfer defnydd tir ar gyfer lleoli 3 caban gwyliau, gosod system trin carthffosiaeth ynghyd â gwaith tirlunio meddal a chaled ar dir ger / Full application for the use of land for the siting of 3 holiday lodges, installation of sewage treatment plant together with soft and hard landscaping on land adjacent to

    Granted Full applications 13 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline