Planning application
Pen Y Dref Bach, Ffordd Pen Y Dref, Rhosneigr
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Barn sgrinio ar gyfer dymchwel y stabl bresennol, y sied a’r garej ynghyd â chodi storfa i gwch, swyddfa gartref, gweithdy/garej, a anecs ar y llawr cyntaf yn / Screening opinion for demolishing the existing stable, shed and garage together with the erection of boat store, home office, workshop/garage, and annexe on the first floor at
As published by the council, reference SCR/2020/33
Application record
- Reference
- SCR/2020/33
- Type
- Outline
- Status
- Permitted
- Decision
- Dim Angen AEA / EIA Not Required
- Received
- 7 Jul 2020
- Validated
- 7 Jul 2020
- Decided
- 17 Jul 2020
- Ward
- Crigyll
- Parish
- Llanfaelog
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 3 applications since 2020: 2 approved, 0 refused.
-
MAH/2020/14 Granted
Pen Y Dref Bach, Ffordd Pen Y Dref, Rhosneigr
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio HHP/2020/149 er mwyn diwygio safleoedd ffenestri yn / Minor amendments to scheme previously approved under planning permission HHP/2020/149 so as to amend window positions at
-
HHP/2020/149 Granted
Pen Y Dref Bach, Ffordd Pen Y Dref, Rhosneigr
Cais llawn ar gyfer dymchwel y stabl bresennol, y sied a’r garej ynghyd â chodi storfa i gwch, swyddfa gartref, gweithdy/garej, a anecs ar y llawr cyntaf yn / Full application for demolishing the existing stable, shed and garage together with the erection of boat store, home office, workshop/garage, and annexe on the first floor at
Timeline
Dates from the published record
-
7 Jul 2020
Received by Isle of Anglesey
-
17 Jul 2020
Decision issued: Dim Angen AEA / EIA Not Required
-
30 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pen Y Dref Bach, Ffordd Pen Y Dref, Rhosneigr
Cais llawn ar gyfer dymchwel y stabl bresennol, y sied a’r garej ynghyd â chodi storfa i gwch, swyddfa gartref, gweithdy/garej, a anecs ar y llawr cyntaf yn / Full application for demolishing the existing stable, shed and garage together with the erection of boat store, home office, workshop/garage, and annexe on the first floor at
Granted Full applications 16 docsSmall domestic -
Pen y Dref Bach, Rhosneigr
Cais i ryddhau amod (05) (Defnyddiau) a (06) (Cynllun Rheoli Traffig) o ganiatâd cynllunio HHP/2020/149 yn/ Application to discharge condition (05) (Materials) and (06) (Construction Traffic Management Plan) of planning permission HHP/2020/149 at
Granted Conditions 5 docs -
Pen Y Dref Bach, Ffordd Pen Y Dref, Rhosneigr
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio HHP/2020/149 er mwyn diwygio safleoedd ffenestri yn / Minor amendments to scheme previously approved under planning permission HHP/2020/149 so as to amend window positions at
Granted Amendments Windows or glazing 5 docs -
Caradoc, 24 Sisial Y Môr, Rhosneigr
Cais llawn ar gyfer dymchwel yr annedd a’r garej bresennol yn ogystal â codi annedd a garej newydd yn / Full application for the demolition of the existing dwelling and garage together with the erection of a new dwelling and garage at
Granted Full applications New dwelling Demolition 10 docsDomestic -
Caradoc, 24 Sisial Y Môr, Rhosneigr
Barn sgrinio ar gyfer dymchwel yr annedd a’r garej bresennol yn ogystal â codi annedd a garej newydd yn / Screening opinion for the demolition of the existing dwelling and garage together with the erection of a new dwelling and garage at
Decided Outline New dwelling Demolition 10 docsDomestic -
Emoyeni, Ffordd Maelog, Rhosneigr
Cais llawn ar gyfer dymchwel, addasu ac ehangu yn / Full application for the demolition, alterations and extensions at
Granted Full applications Extension Demolition 8 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at