Planning application

Fferm Wynt Trysglwyn Wind Farm, Rhosybol

Decided Isle of Anglesey SCO/2020/3 Outline

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Barn sgopio ar gyfer ymestyn cyfnod y caniatad dros dro er mwyn ymestyn am gyfnod o 10 mlynedd pellach gyfnod gweithredol y datblygiad yn / Scoping opinion for extending the temporary planning permission so as to extend the operational life of the development by an additional 10 years at

As published by the council, reference SCO/2020/3

Application record

Reference
SCO/2020/3
Type
Outline
Status
Permitted
Decision
Barn Sgopio AEA / EIA Scoping Opinion
Received
20 May 2020
Validated
20 May 2020
Decided
24 Jul 2020
Ward
Twrcelyn
Parish
Rhosybol
Decision by
Delegated

Timeline

Dates from the published record

  1. 20 May 2020

    Received by Isle of Anglesey

  2. 24 Jul 2020

    Decision issued: Barn Sgopio AEA / EIA Scoping Opinion

  3. 30 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Fferm Wynt Trysglwyn, Rhosybol / Trysglwyn Windfarm, Rhosybol

    VAR/2021/38 Submitted 4 May 2021 50 yards away

    Cais o dan Adran 73 i ddiwygio amodau 15 a 16 o ganiatâd cynllunio rhif APP45-36 (caniatad ar apel) (adeiladu 15 twrbin gwynt ar dir yn Trysglwyn Fawr, Rhosybol) er mwyn ymestyn cyfnod gweithredol y 14 twrbin sydd wedi ei adeiladu ar y safle am gyfnod pellach o 10 mlynedd hyd at 29.6.31, ymestyn y cyfnod lle mae angen dadgomisiynu y fferm ynghyd ag ymestyn y cyfnod o orfod tynnu twrbin oddi ar y safle os ddim yn cynhyrchu trydan am gyfnod ir grid lleol yn Application under Section 73 for the variation of conditions 15 and 16 of planning permission reference APP45-36 (permission on appeal) which permitted the construction of 15 wind turbines on land at Trysglwyn Fawr, Rhosybol) so as to extend the operational phase of 14 turbines constructed on site for a further period of 10 years up to 29.6.31, extend the period where the farm needs to be decommissioned as well as extend the period where a turbine needs to be dismantled if it is not producing electricity to the local grid at

    Granted Conditions 25 docs
  • Trysglwyn Windfarm , Rhosybol

    DIS/2022/51 Submitted 15 Jul 2022 50 yards away

    Cais i ryddhau amod (14) (Ecoleg), o ganiatâd cynllunio VAR/2021/38 (Cais o dan Adran 73 i ddiwygio amodau 15 a 16 o ganiatâd cynllunio rhif APP45-36 (caniatad ar apel) (adeiladu 15 twrbin gwynt ar dir yn Trysglwyn Fawr, Rhosybol) er mwyn ymestyn cyfnod gweithredol y 14 twrbin sydd wedi ei adeiladu ar y safle am gyfnod pellach o 10 mlynedd hyd at 29.6.31, ymestyn y cyfnod lle mae angen dadgomisiynu y fferm ynghyd ag ymestyn y cyfnod o orfod tynnu twrbin oddi ar y safle os ddim yn cynhyrchu trydan am gyfnod ir grid lleol) yn Application to discharge condition (14) (Ecology), of planning permission VAR/2021/38 (Application under Section 73 for the variation of conditions 15 and 16 of planning permission reference APP45-36 (permission on appeal) which permitted the construction of 15 wind turbines on land at Trysglwyn Fawr, Rhosybol) so as to extend the operational phase of 14 turbines constructed on site for a further period of 10 years up to 29.6.31, extend the period where the farm needs to be decommissioned as well as extend the period where a turbine needs to be dismantled if it is not producing electricity to the local grid) at

    Granted Conditions 10 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Decided

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline