Planning application
Gorslwyd Fawr Bungalow, Rhosybol
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais amlinellol ar gyfer adeiladu un annedd, yn cynnwys manylion llawn am y fynedfa, gyda’r holl faterion eraill wedi eu cadw yn ôl yn / Outline application for the erection of one dwelling together with full details of access with all other matters reserved at
As published by the council, reference OP/2023/7
Application record
- Reference
- OP/2023/7
- Type
- Outline
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 11 Sep 2023
- Validated
- 18 Sep 2023
- Decided
- 30 Nov 2023
- Ward
- Twrcelyn
- Parish
- Rhosybol
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
FPL/2026/137 Decided
Gorslwyd Fawr Bungalow, Rhosybol
Cais llawn ar gyfer codi annedd unllawr a garej ar dir ger / Full application for the erection of a single storey dwelling and garage on land adjacent to
Timeline
Dates from the published record
-
11 Sep 2023
Received by Isle of Anglesey
-
18 Sep 2023
Validated
Checked as complete and ready for consideration.
-
30 Nov 2023
Decision issued: Caniatáu / Permit
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 30 November 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Rose Hill Cottage, Rhosybol
Cais llawn ar gyfer dymchwel porthladd ceir presennol ynghyd â chodi modurdy, gweithdy a storfa yn/ Full application for the demolition of existing car port together with the erection of a garage, workshop and store at
Refused Full applications Demolition 11 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at