Planning application
The Lookout Point, Porth Crigyll, Rhosneigr / The Lookout Point, Station Road, Rhosneigr
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais ôl-weithredol ar gyfer mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio 28C373G er mwyn gosod 3 Pwmp Gwres Ffynhonnell Awyr ynghyd â sgrin-bren yn / Retrospective application for minor amendments to scheme previously approved under planning permission 28C373G so as to install 3 Air Source Heat Pumps together with timber screening at
As published by the council, reference MAO/2020/13
Application record
- Reference
- MAO/2020/13
- Type
- Outline
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 30 Jun 2020
- Validated
- 8 Jul 2020
- Decided
- 31 Jul 2020
- Ward
- Crigyll
- Parish
- Llanfaelog
- Decision by
- Delegated
Timeline
Dates from the published record
-
30 Jun 2020
Received by Isle of Anglesey
-
8 Jul 2020
Validated
Checked as complete and ready for consideration.
-
31 Jul 2020
Decision issued: Caniatáu / Permit
-
30 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 31 July 2020, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Bryn Colyn, Warren Road, Rhosneigr
Cais llawn ar gyfer newid defnydd modurdy presennol i anecs yn / Full application for the change of use of existing garage into a annexe at
Granted Amendments 8 docs -
Galwad Y Mor, 15 Porth Crigyll, Rhosneigr
Cais llawn ar gyfer addasu ac ehangu gan cynnwys adeiladu balconi yn / Full application for alterations and extensions including the erection of a new balcony at
Granted Full applications Extension 14 docs -
Ty Mel, Ffordd Warren Road, Rhosneigr
Cais llawn ar gyfer addasu ac ehangu hefo balconis ochr a cefn yn / Full application for alterations and extensions with rear and side balconies at
Granted Householder Extension 8 docsDomestic -
Ty Mel, Warren Road, Rhosneigr
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Refused Full applications Extension 8 docs -
1 & 2 Bryn Colyn, Warren Road, Rhosneigr
Cais llawn ar gyfer codi dau falconi yn / Full application for the erection of two balconies at
Granted Householder 15 docsDomestic -
1 Porth Crigyll, Rhosneigr
Cais i ryddhau amod (03)(CEMP), (04)(Goleuadau Allanol), (05)(Manylion Ffenestr) a (06)(Bioamrywiaeth) o ganiatâd cynllunio HHP/2023/98 (addasu ac ehangu hefo balconi) yn / Application to discharge condition (03)(CEMP), (04)(External Lighting,) (05)(Fenestration Detail) and (06)(Biodiversity) of planning permission HHP/2023/98 (alterations and extensions with a balcony) at
Granted Conditions Extension Windows or glazing 6 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at