Planning application
Bryn Aber, Lon Esgair, Bae Cemlyn Bay
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Cais llawn ar gyfer dymchwel yr adeiladau allanol presennol ynghyd â chodi adeilad allanol newydd ar gyfer gweithdy a modurdy yn / Full application for demolition of the existing outbuildings together with the erection of a new outbuilding consisting of a workshop and garage at
As published by the council, reference HHP/2025/119
Application record
- Reference
- HHP/2025/119
- Type
- Full
- Received
- 3 Jul 2025
- Validated
- 3 Jul 2025
- Ward
- Talybolion
- Parish
- Cylch y Garn
- Decision by
- Delegated
Timeline
Dates from the published record
-
3 Jul 2025
Received by Isle of Anglesey
-
16 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 28 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Isle of Anglesey took a median of 71 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsChecking the current position
The published feed does not show a live status for this application; the register on Isle of Anglesey's own portal holds the authoritative version.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Isle of Anglesey
-
FPL/2025/311 Granted
Tai Lewis Rogers, Ffordd Penmynydd, Penmynydd
Cais llawn ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal ag addasu ac ehangu, creu mynedfa newydd, gosod pecyn trin carthion a phaneli solar ar y ddaear yn / Full application for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at
-
FPL/2026/33 Granted
M-SParc, Gaerwen
Cais llawn ar gyfer gosod paneli solar PV ar y ddaear, ynghyd ag offer cysylltiedig ar dir yn / Full application for the installation of ground mounted PV solar panels, together with associated equipment on land at
-
FPL/2025/320 Granted
Ffrwd Onnen, Llangristiolus, Bodorgan
Cais llawn ar gyfer creu menage a codi stabl yn / Full application for the creation of a menage and the erection of a stable at
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at