Planning application
Glan Y Don, Ffordd Cynan/St George's Road, Porthaethwy/Menai Bridge
Works: Extension
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
As published by the council, reference HHP/2022/90
Application record
- Reference
- HHP/2022/90
- Type
- Full
- Status
- Withdrawn
- Decision
- Tynnwyd yn ôl / Withdrawn
- Received
- 16 Mar 2022
- Validated
- 21 Mar 2022
- Decided
- 1 Aug 2022
- Ward
- Aethwy
- Parish
- Menai Bridge
- Decision by
- Delegated
Timeline
Dates from the published record
-
16 Mar 2022
Received by Isle of Anglesey
-
21 Mar 2022
Validated
Checked as complete and ready for consideration.
-
1 Aug 2022
Decision issued: Tynnwyd yn ôl / Withdrawn
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Ysgol Gwyddorau Eigion Prifysgol Cymru, Porthaethwy /University of Wales School of Ocean Sciences, Menai Bridge
Cais llawn ar gyfer codi ffens ychwanegol ar ben y wal bresennol ynghyd â giât ychwanegol yn /Full application for the erection of additional fencing on top of existing wall together with an additional gate at
Granted Full applications 11 docs -
Cadfan Villa, Menai Ville Terrace, Porthaethwy / Menai Bridge
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio HHP/2021/300 (dymchwel y garej bresennol a chodi garej newydd) yn er mwyn diwygio'r dyluniad yn / Minor amendments to scheme previously approved under planning permission HHP/2021/300 (demolition of existing garage and erection of a replacement garage) so as to amend the design at
Granted Amendments Demolition 4 docs -
32 Stryd Fawr, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer addasiadau ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 7 docs -
32 Stryd Fawr, Porthaethwy / High Street, Menai Bridge
Cais llawn ar gyfer newid defnydd annedd (Dosbarth Defnydd C3) i fod yn deintyddfa a chlinig iechyd (Dosbarth Defnydd D1) yn / Full application for the change of use of a dwelling (Use Class C3) into a dentist and health clinic (Use Class D1) at
Granted Amendments 7 docsDomestic -
Mostyn Arms , Ffordd Cynan/St Georges Road, Porthaethwy/Menai Bridge.
Cais am Dystysgrif Cyfreithlondeb o ddatblygiad presennol mewn perthynas a cychwyn gwaith materol ar ganiatad cynllunio rhif 39C82B yn / Application for a Certificate of Lawfulness of existing development in relation to a material start having been made on planning permission reference 39C82B at
Decided Amendments 4 docs -
Mostyn Arms, Ffordd Cynan/St Georges Road, Porthaethwy/Menai Bridge.
Cais llawn ar gyfer adeilad deulawr yn cynnwys modurdai ar y llawr isaf a fflat preswyl ar y llawr cyntaf yn / Full application for the erection of a two storey building comprising of garages on the ground floor and a first floor residential apartment at
Refused Full applications 11 docs
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at