Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Tyn Rhos, Gaerwen

Granted Isle of Anglesey HHP/2022/271 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer codi garej yn / Full application for the erection of a garage at

As published by the council, reference HHP/2022/271

Application record

Reference
HHP/2022/271
Type
Full
Status
Permitted
Decision
Caniatáu / Permit
Received
15 Sep 2022
Validated
10 Oct 2022
Decided
6 Dec 2022
Ward
Bodowy
Parish
Llanfihangelesceifiog
Decision by
Delegated

Timeline

Dates from the published record

  1. 15 Sep 2022

    Received by Isle of Anglesey

  2. 10 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 6 Dec 2022

    Decision issued: Caniatáu / Permit

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Tyn Rhos, Gaerwen

    FPL/2023/272 Submitted 21 Sep 2023 8m away

    Cais llawn ar gyfer gosod pwmp gwres ffynhonnell aer yn / Full application for the installation of an air source heat pump at

    Granted Full applications 4 docs
  • 1 Glanllyn, Ffordd Caergybi / Holyhead Road, Gaerwen

    HHP/2023/260 Submitted 5 Dec 2023 72m away

    Cais llawn ar gyfer addasu ac ehangu hefo balconi ynghyd a creu anecs yn / Full application for alterations and extensions with a balcony together with creating an annexe at

    Granted Full applications Extension 6 docs
  • Tros y Terfyn, Stryd y Capel / Chapel Street, Gaerwen

    HHP/2026/4 Submitted 13 Jan 2026 81m away

    Cais llawn ar gyfer addasu ac ehangu ynghyd a throsi'r garej i fod yn rhan o'r eiddo yn / Full application for alterations and extensions together with the conversion of the garage to form part of the dwelling at

    Granted Full applications Extension 5 docs
    Domestic
  • Gaerwen Arms, Chapel Street, Gaerwen

    FPL/2023/323 Submitted 30 Oct 2023 90m away

    Cais llawn ar gyfer ail adeiladu yr adeilad a ddifrodwyd gan dân yn / Full application for the rebuilding of the fire damaged building at

    Granted Full applications 23 docs
  • Little Chef, Gaerwen

    LUE/2026/6 Submitted 23 Mar 2026 136m away

    Cais am Dystysgrif Cyfreithlondeb o ddatblygiad presennol mewn perthynas â chychwyn gwaith materol ar ganiatâd cynllunio FPL/2019/124 (codi 5 annedd farchnad agored a 1 annedd fforddiadwy ynghyd a chreu mynedfeydd newydd i gerbydau a gwaith cysylltiedig) ar yr hen safle / Application for a Certificate of Lawfulness of existing development in relation to a material start having been made on planning permission reference FPL/2019/124 (erection of 5 open market dwellings and 1 affordable dwelling together with the creation of new vehicular accesses together with associated development) at the former

    Decided Lawful development 4 docs
    Domestic
  • Croeso, Gaerwen

    HHP/2022/213 Submitted 25 Jul 2022 288m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 9 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications