Planning application
Garth Wion, Tynygongl
Works: Extension Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn ar gyfer dymchwel rhan or annedd ynghyd a addasu ac ehangu a codi storfa cychod yn / Full application for demolition of part of dwelling together with alterations and extensions and erection of a boat store at
As published by the council, reference HHP/2022/123
Application record
- Reference
- HHP/2022/123
- Type
- Full
- Status
- Permitted
- Decision
- Caniatáu / Permit
- Received
- 19 Apr 2022
- Validated
- 19 Apr 2022
- Decided
- 25 May 2022
- Ward
- Lligwy
- Parish
- Llanfair M.E.
- Decision by
- Delegated
Timeline
Dates from the published record
-
19 Apr 2022
Received by Isle of Anglesey
-
25 May 2022
Decision issued: Caniatáu / Permit
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Croes Wion, Tyn y Gongl
Cais i lleoli darllenfa yn / Application for the siting of a lectern at
Granted 5 docs -
Parc Bach Services, Tynygongl
Cais llawn ar gyfer codi estyniad i'r depo gwerthu teiars yn / Full application for the erection of an extension to the tyre sales depot at
Granted Full applications Extension 8 docs -
Cri Y Wylan, Rhianfa, Benllech, Tyn Y Gongl
Cais llawn ar gyfer codi decin i gefn yr eiddo yn / Full application for the erection of decking to the rear of the property at
Granted Full applications 8 docs -
The Chimes, Rhianfa, Benllech
Cais llawn ar gyfer dymchwel rhan o'r annedd ynghyd a addasu ac ehangu yn / Full application for demolition of part of the dwelling together with alterations and extensions at
Granted Full applications Extension Demolition 9 docsDomestic -
Can Aderyn, Rhianfa, Tynygongl
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 6 docs -
22 Garreglwyd, Benllech.
Cais llawn ar gyfer newid y modurdy bresennol yn rhan o'r eiddo bresennol yn / Full application for the conversion of the existing garage into part of the existing dwelling at
Granted Full applications 8 docsDomestic
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at