Skip to content
PlanIndex Get alerts
Menu

Planning application

Mostyn Arms, Ffordd Cynan / St George's Road, Porthaethwy / Menai Bridge.

Granted Isle of Anglesey FPL/2024/316 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer codi cyfleuster gofal preswyl (Dosbarth Defnydd C2) a uned llety byw cysylltiedig yn / Full application for the erection of a residential care facility (Use Class C2) and associated living accommodation unit at

As published by the council, reference FPL/2024/316

Application record

Reference
FPL/2024/316
Type
Full
Status
Permitted
Decision
Granted As published: Caniatáu / Permit
Received
8 Nov 2024
Validated
4 Dec 2024
Decided
24 Jan 2025
Ward
Aethwy
Parish
Menai Bridge
Decision by
Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 3 applications since 2023: 2 approved, 0 refused.

  • CAC/2025/1 Granted

    Mostyn Arms, Ffordd Cynan / St George's Road, Porthaethwy / Menai Bridge.

    Caniatad Ardal Cadwraeth ar gyfer dymchwel yr adeilad presennol a codi cyfleuster gofal preswyl (Dosbarth Defnydd C2) a uned llety byw cysylltiedig yn / Conservation Area Consent for the demolition of the existing building and erection of a residential care facility (Use Class C2) and associated living accommodation unit at

    Decided 24 Feb 2025 Heritage and listed buildings
  • FPL/2023/173 Decided

    Mostyn Arms, Ffordd Cynan / St George's Road, Porthaethwy / Menai Bridge.

    Cais llawn gyfer newid defnydd yr hen dafarndy (Dosbarth Defnydd A3) i fod yn gyfleuster gofal preswyl (Dosbarth Defnydd C2) ynghyd a'i addasu ac ehangu yn / Full application for the change of use of the former public house (Use Class A3) to a residential care facility (Use Class C2) together with alterations and extensions at

    Submitted 30 Jun 2023 Amendments

Timeline

Dates from the published record

  1. 8 Nov 2024

    Received by Isle of Anglesey

  2. 4 Dec 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jan 2025

    Decision issued: Caniatáu / Permit

  4. 16 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Isle of Anglesey granted permission on 24 January 2025, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Mostyn Arms , Ffordd Cynan/St Georges Road, Porthaethwy/Menai Bridge.

    LUE/2023/9 Submitted 5 Apr 2023 50 yards away

    Cais am Dystysgrif Cyfreithlondeb o ddatblygiad presennol mewn perthynas a cychwyn gwaith materol ar ganiatad cynllunio rhif 39C82B yn / Application for a Certificate of Lawfulness of existing development in relation to a material start having been made on planning permission reference 39C82B at

    Refused Lawful development 6 docs
  • Mostyn Arms , Ffordd Cynan/St Georges Road , Porthaethwy/Menai Bridge

    FPL/2025/126 Submitted 29 Apr 2025 50 yards away

    Cais llawn ar gyfer addasu ac ehangu'r modurdai presennol i ddarparu fflat preswyl uwchben yn / Full application for the alterations and extensions to the existing garages to provide residential apartment above at

    Withdrawn Full applications Extension 12 docs
  • Mostyn Arms, Ffordd Cynan / St George's Road, Porthaethwy / Menai Bridge.

    CAC/2025/1 Submitted 3 Jan 2025 50 yards away

    Caniatad Ardal Cadwraeth ar gyfer dymchwel yr adeilad presennol a codi cyfleuster gofal preswyl (Dosbarth Defnydd C2) a uned llety byw cysylltiedig yn / Conservation Area Consent for the demolition of the existing building and erection of a residential care facility (Use Class C2) and associated living accommodation unit at

    Granted Heritage and listed buildings Demolition 17 docs
  • Mostyn Arms, Ffordd Cynan/St Georges Road, Porthaethwy/Menai Bridge.

    FPL/2023/264 Submitted 14 Sep 2023 50 yards away

    Cais llawn ar gyfer adeilad deulawr yn cynnwys modurdai ar y llawr isaf a fflat preswyl ar y llawr cyntaf yn / Full application for the erection of a two storey building comprising of garages on the ground floor and a first floor residential apartment at

    Refused Full applications 11 docs
  • Mostyn Arms, Ffordd Cynan / St George's Road, Porthaethwy / Menai Bridge.

    FPL/2023/173 Submitted 30 Jun 2023 50 yards away

    Cais llawn gyfer newid defnydd yr hen dafarndy (Dosbarth Defnydd A3) i fod yn gyfleuster gofal preswyl (Dosbarth Defnydd C2) ynghyd a'i addasu ac ehangu yn / Full application for the change of use of the former public house (Use Class A3) to a residential care facility (Use Class C2) together with alterations and extensions at

    Decided Amendments Extension 19 docs
  • Mostyn Arms , Ffordd Cynan/St Georges Road, Porthaethwy/Menai Bridge.

    FPL/2023/110 Submitted 21 Apr 2023 50 yards away

    Cais ôl-weithredol ar gyfer codi bloc o garejys ar dir cyfagos yn / Retrospective application for the erection of a block of garages on land adjacent to

    Granted Amendments 7 docs

In Isle of Anglesey

  • FPL/2025/311 Granted

    Tai Lewis Rogers, Ffordd Penmynydd, Penmynydd

    Cais llawn ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal ag addasu ac ehangu, creu mynedfa newydd, gosod pecyn trin carthion a phaneli solar ar y ddaear yn / Full application for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at

    Received 12 Dec, published by the council 6 Aug 2026 Full applications
  • FPL/2026/33 Granted

    M-SParc, Gaerwen

    Cais llawn ar gyfer gosod paneli solar PV ar y ddaear, ynghyd ag offer cysylltiedig ar dir yn / Full application for the installation of ground mounted PV solar panels, together with associated equipment on land at

    Received 13 Feb, published by the council 6 Aug 2026 Full applications
  • FPL/2025/320 Granted

    Ffrwd Onnen, Llangristiolus, Bodorgan

    Cais llawn ar gyfer creu menage a codi stabl yn / Full application for the creation of a menage and the erection of a stable at

    Received 22 Dec, published by the council 6 Aug 2026 Full applications
  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    Received 17 Apr, published by the council 6 Aug 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    Received 31 Mar, published by the council 6 Aug 2026 Full applications