Planning application
Haulfryn, Scotland Terrace, Bodffordd.
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn i godi 15 tŷ fforddiadwy, creu mynedfa newydd i gerbydau ac i gerddwyr ynghyd a chreu ffordd mewnol a gwaith cysylltiedig ar dir ger / Full application for the erection of 15 affordable dwellings, creation of new vehicular and pedestrian access and creation of internal access road and associated works on land adjacent to
As published by the council, reference FPL/2023/15
Application record
- Reference
- FPL/2023/15
- Type
- Full
- Status
- Permitted
- Decision
- Caniatáu / Permit
- Received
- 18 Jan 2023
- Validated
- 25 May 2023
- Decided
- 12 Feb 2026
- Ward
- Canolbarth Mon
- Parish
- Bodffordd
- Decision by
- Planning Committee
Timeline
Dates from the published record
-
18 Jan 2023
Received by Isle of Anglesey
-
25 May 2023
Validated
Checked as complete and ready for consideration.
-
12 Feb 2026
Decision issued: Caniatáu / Permit
-
19 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
57 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Haulfryn, Scotland Terrace, Bodffordd
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio FPL/2023/15 er mwyn diwygio'r dyluniad a geiriad amod (12)(Amodau mynediad) a (14) (cynlluniau a ganiatawyd) yn / Minor amendments to scheme previously approved under planning permission FPL/2023/15 so as to amend the design and the wording of condition 12 (Access conditions) and (14) (approved plans) at
Refused Amendments 21 docs -
Heulfryn House, Bodffordd
Cais llawn ar gyfer estyniad i'r cwrtil yn / Full application for extension to curtilage at
Granted Full applications Extension 6 docs -
Maes Hyfryd, Bodffordd
Cais llawn ar gyfer codi garej ddwbl yn / Full application for the erection of a double garage at
Granted Full applications 8 docs -
Maes Hyfryd, Bodffordd
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan ganiatád cynllunio HHP/2022/98 (codi garej ddwbl) er mwyn diwygio'r dyluniad yn / Minor amendments to scheme previously approved under planning permission HHP/2022/98 (erection of a double garage) so as to amend the design at
Granted Amendments 6 docs -
Caer Delyn, Bodffordd
Rhybudd Eithriad Trydan ar gyfer codi polyn ychwanegol ar llwybr troed yn / Electricity Exemption Notice for the erection of an additional pole on footpath at
Granted Other 1 doc -
Ysgol Bodffordd, Minffordd, Bodffordd, LLangefni
Cais llawn ar gyfer lleoli adeilad ystafell ddosbarth dwbl modiwlaidd ar faes chwarae'r ysgol yn / Full application for the siting of a modular double classroom building on the school's playground area at
Granted Full applications 8 docs
Other full applications applications
In Isle of Anglesey
-
FPL/2026/85 Granted
31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.
Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at
-
FPL/2026/69 Granted
Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead
Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at
-
FPL/2026/40 Granted
Cumbria, High Street, Rhosneigr.
Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at
-
FPL/2026/38 Granted
Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.
Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at
-
FPL/2025/285 Granted
Cefn Coch, Llanfechell
Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at