Planning application
Wylfa Power Station,Cemaes
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais llawn a'r gyfer codi is-orsaf 11kV yn / Full application for a new 11kV substation at
As published by the council, reference FPL/2022/34
Application record
- Reference
- FPL/2022/34
- Type
- Full
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 4 Feb 2022
- Validated
- 24 Feb 2022
- Decided
- 19 Apr 2022
- Ward
- Twrcelyn
- Parish
- Llanbadrig
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
MAO/2026/7 Granted
Wylfa Power Station, Cemaes.
Mân newidiadau i’r cynllun a gymeradwywyd yn flaenorol o dan gyfeirnodau caniatâd cynllunio FPL/2025/191 er mwyn caniatáu i'r prosiect ddechrau o fewn y tymor nythu yn / Minor amendments to scheme previously approved under planning permission references FPL/2025/191 so to allow the project to begin within the nesting season at
-
DEM/2021/2 Granted
Wylfa Power Station, Cemaes
Caniatâd blaenorol arfaethedig i ddymchwel adeiladau rhif 44, 45, 46, 51, 53, 54, 58, 77, 78, 114, 118, 123 a 173 ac unrhyw geblau, peipiau, dyfrbibellau a ffliwiau yn / Prior Approval for proposed demolition of buildings 44, 45, 46, 51, 53, 54, 58, 77, 78, 114, 118, 123 & 173 and any associated cables, pipes, conduits and flues at
Timeline
Dates from the published record
-
4 Feb 2022
Received by Isle of Anglesey
-
24 Feb 2022
Validated
Checked as complete and ready for consideration.
-
19 Apr 2022
Decision issued: Caniatáu / Permit
-
29 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 19 April 2022, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Gorsaf Pwer Wylfa / Wylfa Power Station, Bae Cemaes / Cemaes Bay
Cais i benderfynu a oes angen cymeradwyaeth ymlaen llaw i ddymchwel yr adeilad modiwlaidd deulawr yn / Application to determine whether prior approval is required for the demolition of a two-storey modular building at
Granted Outline Demolition 10 docs -
Gorsaf Bŵer Wylfa Power Station, Cemaes Bay.
94% historically approved · decision due ~14 Aug
Cais llawn ar gyfer symud ac adleoli adeilad segur (a elwir yn Adeilad 187) i'w ddefnyddio fel Cyfleuster Clirio Gwastraff Anweithredol yn / Full application for removal and relocation of redundant building (known as Building 187) for use as a Non-Active Waste Clearance Facility at
Status unknown Full applications 7 docs -
Wylfa, Cemaes
Cais o dan Adran 73 i ddiwygio amod (01) (cynllun tynnu ac ail-osod) o ganiatâd cynllunio rhif VAR/2021/42 (diwygio amod (01) o gais 38C310E er mwyn caniatau estyniad 12 mis) er mwyn ymestyn hyd y caniatâd am gyfnod o bedair blynedd yn / Application under Section 73 for the variation of condition (01) (removal and re-instatement scheme) of planning permission reference VAR/2021/42 (variation of condition (01) of 38C310E to allow 12 month extension) so as to extend the duration of the permission by a period of four years at
Granted Conditions Extension 7 docs -
Wylfa, Cemaes
Cais o dan Adran 73 i ddiwygio amod (01) (cynllun tynnu ac ail-osod) o ganiatâd cynllunio rhif VAR/2022/39 (diwygio amod (01) o gais 38C310E er mwyn caniatau estyniad 12 mis) er mwyn ymestyn hyd y caniatâd am gyfnod o bedair blynedd yn / Application under Section 73 for the variation of condition (01) (removal and re-instatement scheme) of planning permission reference VAR/2022/39 (variation of condition (01) of 38C310E to allow 12 month extension) so as to extend the duration of the permission by a period of four years at
Granted Amendments Extension 8 docs -
Gorsaf Bwer Wylfa Power Station, Cemaes.
Cais llawn ar gyfer gosod colofn o 10 llifoleuadau annibynnol yn / Full application for the installation of 10 no. freestanding floodlight columns at
Granted Full applications 11 docs -
Wylfa Power Station, Cemaes
Caniatâd blaenorol arfaethedig i ddymchwel adeiladau rhif 44, 45, 46, 51, 53, 54, 58, 77, 78, 114, 118, 123 a 173 ac unrhyw geblau, peipiau, dyfrbibellau a ffliwiau yn / Prior Approval for proposed demolition of buildings 44, 45, 46, 51, 53, 54, 58, 77, 78, 114, 118, 123 & 173 and any associated cables, pipes, conduits and flues at
Granted Other Demolition 8 docs
Other full applications
In Isle of Anglesey
-
FPL/2025/297 Withdrawn
Bryn Gwyn, Brynrefail, Dulas
Cais llawn ar gyfer dymchwel yr annedd a garej bresennol, codi annedd a garej newydd yn ei le a gwaith cysylltiedig yn / Full application for the demolition of the existing dwelling and garage, the erection of a replacement dwelling and garage and associated works at
-
FPL/2025/295 Granted
58 Stryd y Glorian / Machine Street, Amlwch.
Cais llawn ar gyfer codi garej newydd ar dir ger / Full application for the erection of a new garage on land adjacent to
-
FPL/2026/45 Granted
Rallt, Nebo.
Cais llawn i godi bloc stabl ar dir ger / Full application for the erection of a stable block on land near
-
FPL/2025/311 Granted
Tai Lewis Rogers, Ffordd Penmynydd, Penmynydd
Cais llawn ar gyfer trosi'r 5 eiddo preswyl presennol yn 3, yn ogystal ag addasu ac ehangu, creu mynedfa newydd, gosod pecyn trin carthion a phaneli solar ar y ddaear yn / Full application for the conversion of the 5 existing residential properties into 3, together with alterations and extensions, creation of a new access, installation of a treatment plant and ground mounted solar panels at
-
FPL/2026/33 Granted
M-SParc, Gaerwen
Cais llawn ar gyfer gosod paneli solar PV ar y ddaear, ynghyd ag offer cysylltiedig ar dir yn / Full application for the installation of ground mounted PV solar panels, together with associated equipment on land at