Skip to content
PlanIndex Get alerts
Menu

Planning application

Lindow, Sandy Lane, Rhosneigr

Granted Isle of Anglesey FPL/2022/108 Full

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn ar gyfer codi annedd, creu myndefa gerbydau newydd ynghyd a tirlunio meddal a caled yn / Full application for the erection of a dwelling, construction of a new vehicluar access together with soft and hard landscaping at

As published by the council, reference FPL/2022/108

Application record

Reference
FPL/2022/108
Type
Full
Status
Permitted
Decision
Caniatáu / Permit
Received
8 Apr 2022
Validated
24 Oct 2022
Decided
18 Jan 2023
Ward
Llifon
Parish
Llanfaelog
Decision by
Delegated

Timeline

Dates from the published record

  1. 8 Apr 2022

    Received by Isle of Anglesey

  2. 24 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 18 Jan 2023

    Decision issued: Caniatáu / Permit

  4. 19 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Wenallt, Sandy Lane, Rhosneigr

    HHP/2023/156 Submitted 18 Jul 2023 19m away

    Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at

    Granted Full applications Extension 7 docs
  • Lindow, Sandy Lane, Rhosneigr

    DIS/2024/24 Submitted 10 Apr 2024 23m away

    Cais i ryddhau amod (08) (CTMP) o ganiatâd cynllunio FPL/2022/108 (codi annedd, creu mynedfa gerbydau newydd ynghyd a tirlunio meddal a caled) yn / Application to discharge condition (08) (CTMP) of planning permission FPL/2022/108 (erection of a dwelling, construction of a new vehicular access together with soft and hard landscaping) at

    Decided Conditions New dwelling 3 docs
    Domestic
  • Ashanti & Gwlith, Sandy Lane, Rhosneigr.

    FPL/2024/357 Submitted 18 Dec 2024 40m away

    Cais llawn ar gyfer codi tri annedd marchnad leol, ynghyd â pharcio cysylltiedig ar dir rhwng / Full application for the erection of three local market dwellings, together with associated parking on land in between

    Decided Full applications 9 docs
  • 7 Cae Cloc, Rhosneigr

    HHP/2024/76 Submitted 19 Apr 2024 72m away

    Cais llawn ar gyfer addasu ac ehangu sydd yn cynnwys balconi yn / Full application for alterations and extensions which include a balcony at

    Granted Full applications Extension 14 docs
  • Rhandir Mwyn, Ffordd y Stablau, Rhosneigr.

    HHP/2023/257 Submitted 5 Dec 2023 113m away

    Cais llawn i ymestyn y balconi presennol ynghyd â chodi garej newydd yn / Full application to extend the existing balcony together with erecting a new garage at

    Granted Full applications 7 docs
  • 8 Marine Terrace, Stryd Fawr / High Street, Rhosneigr

    ADV/2024/2 Submitted 7 May 2024 116m away

    Cais am newid 2 arwydd 'fascia' ac 1 arwydd heb ei oleuo yn ymestyn allan yn / Application for the replacement of 2 Fascia signs and 1 non-illuminated projecting sign at

    Granted Advertising 4 docs

In Isle of Anglesey

  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications
  • FPL/2026/38 Granted

    Pen Bryn Uchaf, Lon Pentracha, Gwalchmai.

    Cais llawn am estyniad i barc carafanau teithiol presennol i greu 11 llein gartrefi modur hunangynhwysol a charafannau teithiol hunangynhwysol yn / Full application for an extension to the existing touring caravan park to create 11 new self contained motorhome and self contained touring caravan pitches at

    18 Feb 2026 Full applications
  • FPL/2025/285 Granted

    Cefn Coch, Llanfechell

    Cais llawn ar gyfer clamp silwair a tanc silwair yn / Full application for a silage clamp and silage tank at

    25 Nov 2025 Full applications