Pen Dalar, Cemaes

Granted Isle of Anglesey FPL/2021/244 Outline

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais cynllunio llawn ar gyfer datblygu trefniant mynediad diwygiedig i'r datblygiad fferm solar a gymeradwywyd o dan ganiatâd cynllunio cyfeirnod 20C310B / EIA / RE (Fferm Solar Porth Wen - a elwid gynt yn Fferm Solar Gogledd Môn) yn / Full planning application for the development of a revised access arrangement to the solar farm development approved under planning permission reference 20C310B/EIA/RE (Porth Wen Solar Farm – formerly known as North Anglesey Solar Farm) at

As published by the council, reference FPL/2021/244

Application record

Reference
FPL/2021/244
Type
Outline
Status
Permitted
Decision
Granted As published: Caniatáu / Permit
Received
6 Sep 2021
Validated
25 Oct 2021
Decided
14 Dec 2021
Ward
Twrcelyn
Parish
Llanbadrig
Decision by
Delegated

Timeline

Dates from the published record

  1. 6 Sep 2021

    Received by Isle of Anglesey

  2. 25 Oct 2021

    Validated

    Checked as complete and ready for consideration.

  3. 14 Dec 2021

    Decision issued: Caniatáu / Permit

  4. 19 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Isle of Anglesey granted permission on 14 December 2021, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Fferm Solar Porth Wen Solar Farm, Cemaes

    DIS/2021/109 Submitted 10 Dec 2021 50 yards away

    Cais i ryddhau amod (11) (Cynllun Rheoli Amgylcheddol Adeiladu ar gyfer Gwaith Cam 1 sy'n cynnwys y Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio MAO/2021/26 (Mân ddiwygiadau i ganiatâd cynllunio 20C310B/EIA/RE adeiladu fferm arae solar 49.99MW) yn / Application to discharge condition (11) (Construction Environmental Management Plan for Phase 1 Works which includes the Construction Traffic Management Plan) of planning permission MAO/2021/26 (Minor amendments to planning permission 20C310B/EIA/RE construction of a 49.99MW solar array farm) at

    Granted Conditions 14 docs
  • Fferm Solar Porth Wen Solar Farm, Cemaes

    DIS/2021/108 Submitted 10 Dec 2021 50 yards away

    Cais i ryddhau amod (6a) (safle / compownd storio) o ganiatâd cynllunio MAO/2021/26 (Mân ddiwygiadau i ganiatâd cynllunio 20C310B/EIA/RE adeiladu fferm arae solar 49.99MW) yn / Application to discharge condition (6a) (site / storage compound details of planning permission MAO/2021/26 (Minor amendments to planning permission 20C310B/EIA/RE construction of a 49.99MW solar array farm) at

    Granted Conditions 5 docs
  • Fferm Solar Porth Wen Solar Farm, Cemaes

    DIS/2022/71 Submitted 19 Oct 2022 50 yards away

    Cais i ryddhau amod (07) ( CCTV) o ganiatâd cynllunio cyfeirnod 20C310B/EIA/RE (fel y’i diwygiwyd drwy welliant ansylweddol (cyfeirnod MAO/2021/26) yn / Application to discharge condition (07) (CCTV) of planning permission 20C310B/EIA/RE (as amended through the non-material amendment (reference: MAO/2021/26) at

    Granted Conditions 6 docs
  • Fferm Solar Rhyd y Groes Solar Farm, Rhosgoch

    DIS/2021/64 Submitted 2 Jul 2021 50 yards away

    Cais i ryddhau amod (14) ( rhaglen o waith archaeolegol) o ganiatâd cynllunio 20C310B/EIA/RE yn / Application to discharge condition (14) (programme of archaeological work) of planning permission 20C310B/EIA/RE at

    Granted Conditions 6 docs
  • Fferm Solar Porth Wen Solar Farm, Cemaes

    DIS/2022/10 Submitted 7 Feb 2022 50 yards away

    Cais i ryddhau amod (11) ( Cynllun Rheoli Amgylcheddol Adeiladu) (Cam 2) o ganiatâd cynllunio cyfeirnod 20C310B/EIA/RE (fel y’i diwygiwyd drwy welliant ansylweddol (cyfeirnod MAO/2021/26) yn / Application to discharge condition (11) (Construction Environmental Management Plan) (Phase 2) of planning permission 20C310B/EIA/RE (as amended through the non-material amendment (reference: MAO/2021/26) at

    Granted Conditions 17 docs
  • Fferm Solar Porth Wen Solar Farm, Cemaes

    MAO/2021/26 Submitted 7 Oct 2021 50 yards away

    Mân ddiwygiadau i'r cynllun a gymeradwywyd yn flaenorol o dan ganiatâd cynllunio 20C310B/EIA/RE (cais llawn ar gyfer adeiladu fferm arae solar 49.99MW ynghyd a offer, seilwaith a gwaith ategol cysylltiedig) yn Rhyd y Groes, Rhosgoch er mwyn diwygio geiriad amodau 5, 6 ac 11 i ganiatáu i'r datblygiad ddigwydd mewn dau gam (cam 1 - gwaith galluogi a cham 2 - gosod paneli) yn / Minor amendments to the scheme previously approved under planning permission 20C310B/EIA/RE (full application for the construction of a 49.99MW solar array farm together with associated equipment, infrastructure and ancillary works) at Rhyd y Groes, Rhosgoch so as to amend the wording of conditions 5, 6, and 11 to allow the development to take place in two phases (phase 1 – enabling works and phase 2 – installation of panels) at

    Granted Conditions 5 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at