Skip to content
PlanIndex Get alerts
Menu

Planning application

Cefn Du ,Gwalchmai

Granted Isle of Anglesey ELE/2022/1 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais llawn o dan Adran 37 Deddf Trydan 1989 i dargyfeirio'r Llinell Uwchben 11kV bresennol, wedi'i chynnal gan bolion pren, ar dir gerllaw yn/ Full application under Section 37 of the Electricity Act 1989 for the diversion of the existing 11kV Overhead Line, supported by wood poles, on land near

As published by the council, reference ELE/2022/1

Application record

Reference
ELE/2022/1
Type
Full
Status
Permitted
Decision
Dim Gwrthwynebiad / No Objection
Received
5 Apr 2022
Validated
5 Apr 2022
Decided
18 May 2022
Ward
Crigyll
Parish
Trewalchmai
Decision by
Delegated

Timeline

Dates from the published record

  1. 5 Apr 2022

    Received by Isle of Anglesey

  2. 18 May 2022

    Decision issued: Dim Gwrthwynebiad / No Objection

  3. 29 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Isle of Anglesey granted permission on 18 May 2022, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Isle of Anglesey

  • FPL/2026/33 Granted

    M-SParc, Gaerwen

    Cais llawn ar gyfer gosod paneli solar PV ar y ddaear, ynghyd ag offer cysylltiedig ar dir yn / Full application for the installation of ground mounted PV solar panels, together with associated equipment on land at

    13 Feb 2026 Full applications
  • FPL/2025/320 Granted

    Ffrwd Onnen, Llangristiolus, Bodorgan

    Cais llawn ar gyfer creu menage a codi stabl yn / Full application for the creation of a menage and the erection of a stable at

    22 Dec 2025 Full applications
  • FPL/2026/85 Granted

    31 & 32 Tyddyn To, Porthaethwy / Menai Bridge.

    Cais llawn ar gyfer newid defnydd dau uned fanwerthu ar y llawr gwaelod (Dosbarth Defnydd A1) i ddau uned breswyl fforddiadwy (Dosbarth Defnydd C3) ynghyd ag addasiadau allanol yn / Full application for the change of use of two ground floor retail units (Use Class A1) into two affordable residential units (Use Class C3) together with external alterations at

    17 Apr 2026 Full applications
  • FPL/2026/69 Granted

    Parc Gwledig Morglawdd, Caergybi / Breakwater Country Park, Holyhead

    Cais llawn ar gyfer lleoli arsyllfa seryrol ac adeilad addysgol yn ogystal â datblygiad cysylltiedig yn / Full application for the siting of an astronomical observatory and education building together with associated development at

    31 Mar 2026 Full applications
  • FPL/2026/40 Granted

    Cumbria, High Street, Rhosneigr.

    Cais llawn ar gyfer dymchwel yr adeilad tair llawr presennol ac adeiladu adeilad tair llawr yn ei le sy'n cynnwys chwe fflat preswyl ac uned fwyd a diod ar y llawr gwaelod â maes parcio cysylltiedig yn / Full application for demolition of the existing three-storey building and the construction of a replacement three-storey building comprising six residential flats and a ground floor food and beverage unit with associated car parking at

    23 Feb 2026 Full applications