Proposal
Cais i ryddhau amod (07) (cynllun arwyddion) o ganiatâd cynllunio FPL/202/65 (cadw maes parcio HGV a gwaith cysylltiedig am gyfnod dros dro o 12 mis)yn/ Application to discharge condition (07)(signage scheme) of planning permission FPL/2022/65(for the retention of HGV parking area and associated works for a temporary period of 12 months) at
As published by the council, reference DIS/2022/68
Application record
- Reference
- DIS/2022/68
- Type
- Advertising
- Status
- Conditions
- Decision
- Amod wedi ei Ryddhau / Condition Discharged
- Received
- 21 Sep 2022
- Validated
- 26 Sep 2022
- Decided
- 2 Nov 2022
- Ward
- Ynys Gybi
- Parish
- Holyhead
- Decision by
- Planning Committee
Timeline
Dates from the published record
-
21 Sep 2022
Received by Isle of Anglesey
-
26 Sep 2022
Validated
Checked as complete and ready for consideration.
-
2 Nov 2022
Decision issued: Amod wedi ei Ryddhau / Condition Discharged
-
29 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
FPL/2022/65 Granted
Plot 9 (Eastern Half), Parc Cybi, Caergybi / Holyhead
Cais llawn i gadw maes parcio HGV a gwaith cysylltiedig am gyfnod dros dro o 12 mis yn / Full application for the retention of HGV parking area and associated works for a temporary period of 12 months at
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About advertisement consent applications
Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
PLOT 9, PARC CYBI, CAERGYBI / PLOT 9, PARC CYBI, HOLYHEAD
Gorchymyn Datblygu Arbennig Cynllunio Glwad a Thref (Safle Rheoli ar y Ffin Gogledd Cymru) (Ymadael â'r UE) 2023 / The Town and Country Planning (North Wales Border Control Post) (EU Exit) Special Development Order 2023
Granted 3 docs -
BCP Inland Border Facility, Plot 9, Parc Cybi, Caergybi/Holyhead.
Cais i ryddhau amod (17) (Mesurau Lliniaru Sŵn) o 2023 Rhif. 256 (W.35) Gorchymyn Datblygu Arbennig Cynllunio Gwlad a Thref (Safle Rheoli ar y Ffin Gogledd Cymru) (Ymadael â’r UE) 2023 (Cyfeirnod ACLl SDO/2023/1) yn / Application to discharge condition (17) (Noise Mitigation Measures) of 2023 No. 256 (W.35) The Town and Country Planning (North Wales Border Control Post) (EU Exit) Special Development Order 2023 (LPA Reference SDO/2023/1) at
Decided Conditions 4 docs -
Plot 9, Parc Cybi, Caergybi / Plot 9, Parc Cybi, Holyhead
Cais i ryddhau amod 9. (7)(Lliwiau Deunyddiau) o 2023 Rhif. 256 (W.35) Gorchymyn Datblygu Arbennig Cynllunio Gwlad a Thref (Safle Rheoli ar y Ffin Gogledd Cymru) (Ymadael â’r UE) 2023 (Cyfeirnod ACLl SDO/2023/1) yn / Application to discharge condition 9. (7)(Material colours) of 2023 No. 256 (W.35) The Town and Country Planning (North Wales Border Control Post) (EU Exit) Special Development Order 2023 (LPA Reference SDO/2023/1) at
Decided Conditions 4 docs -
Plot 9 (Eastern Half), Parc Cybi, Caergybi / Holyhead
Cais llawn i gadw maes parcio HGV a gwaith cysylltiedig am gyfnod dros dro o 12 mis yn / Full application for the retention of HGV parking area and associated works for a temporary period of 12 months at
Granted Full applications 30 docs -
Plot C7, Parc Cybi, Caergybi / Holyhead
Cais i ryddhau amod (09)(Cynllun Rheoli Amgylcheddol Adeiladu) and (14)(Cynllun Rheoli Traffig Adeiladu) o ganiatâd cynllunio FPL/2022/88 yn / Application to discharge condition (09)(Construction Environmental Management Plan) and (14)(Construction Traffic Management Plan) of planning permission FPL/2022/88 at
Decided Conditions 3 docs -
Plot C7, Parc Cybi, Caergybi / Holyhead.
Barn sgrinio ar gyfer datblygu Cyfleuster Hwb Hydrogen gan gynnwys cyfleuster cynhyrchu hydrogen gwyrdd, storio hydrogen, cyfleuster tanwydd cerbydau hydrogen, a strwythurau ategol yn / Screening opinion for the development of a Hydrogen Hub Facility including green hydrogen production facility, hydrogen storage, hydrogen vehicle fuelling facility, and ancillary structures at
Decided Outline
Other advertisement consent applications
In Isle of Anglesey
-
SCR/2026/19 Decided
A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes
Barn sgrinio i amrywio amod (01) o gais VAR/2023/41 (Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2020/24 (Cais llawn i wella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall) ar hyd y / Screening opinion to vary condition (01) of application VAR/2023/41 (Section 73 application to vary condition (01) of application VAR/2020/24 (Full application for improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years )) along the
-
ADV/2025/8 Granted
Cyffordd, lôn i Ynys Lawd, Caergybi / Junction, road to South Stack, Holyhead
Cais i gadw dau arwydd heb ei oleuo yn / Application for the retention of two non-illuminated signs at
-
ADV/2026/2 Granted
Unit 5, Penrhos Retail Park, Caergybi/Holyhead
Cais i lleoli arwyddion heb ei oleuo a wedi ei oleuo yn / Application for the siting of illuminated and non-illuminated signs at
-
ADV/2025/9 Granted
Waitrose, Ffordd Mona, Porthaethwy / Waitrose, Mona Road, Menai Bridge.
Cais i leoli amryw o arwyddion wedi ei oleuo a heb ei oleuo yn / Application for the siting of various illuminated and non-illuminated signs at
-
ADV/2025/15 Granted
Oriel Ynys Môn, Llangefni.
Cais i leoli arwydd heb ei oleuo yn / Application for the siting of a non-illuminated sign at