Planning application
Bryn Goleu, Ffordd Caergybi / Holyhead Road, Bryngwran.
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol at ddibenion storio ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed for storage purposes on land at
As published by the council, reference DAG/2026/6
Application record
- Reference
- DAG/2026/6
- Type
- Outline
- Status
- Permitted
- Decision
- Granted As published: Caniatáu / Permit
- Received
- 16 Feb 2026
- Validated
- 16 Feb 2026
- Decided
- 16 Mar 2026
- Ward
- Bro'r Llynnoedd
- Parish
- Bodedern
- Decision by
- Delegated
Site history
Applications at this address on the Isle of Anglesey register
This site has had 5 applications since 2019: 4 approved, 1 refused.
-
FPL/2024/258 Granted
Bryn Goleu, Ffordd Caergybi / Holyhead Road, Bryngwran.
Cais llawn ar gyfer addasu'r fynediad amaethyddol presennol ynghyd â chreu trac fferm yn / Full application for alterations to the existing agricultural access together with the creation of a farm track at
-
FPL/2023/71 Granted
Bryn Goleu, Ffordd Caergybi / Holyhead Road, Bryngwran
Cais llawn ar gyfer codi anecs ynghyd ag estyniad i'r cwrtil preswyl yn / Full application for the erection of an annexe together with an extension to the residential curtilage at
-
FPL/2020/207 Granted
Bryn Goleu, Ffordd Caergybi/Holyhead Road, Bryngwran
Cais llawn ar gyfer newid defnydd yr adeilad allanol i uned gwyliau yn / Full application for conversion of the outbuilding into a holiday unit at
-
FPL/2019/18 Refused
Bryn Goleu, Ffordd Caergybi/Holyhead Road, Bryngwran
Proposal to convert the existing outbuilding, without the need to amend the footprint, into holiday let accommodation. It is proposed that the existing outbuilding be converted into a holiday unit comprising of three double bedrooms, a bathroom, kitchen and living/ dining space. There is ample parking already available on the site.
Timeline
Dates from the published record
-
16 Feb 2026
Received by Isle of Anglesey
-
16 Mar 2026
Decision issued: Caniatáu / Permit
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 16 March 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Safle Carafanau Teithiol Bryn Goleu Touring Caravan Site, Bryngwran
Cais o dan Adran 73A i ddiwygio amod (04)(Defnydd tymhorol) o caniatâd cynllunio rhif FPL/2021/30 (change of use of existing Cartio Môn site into touring caravan site with 20 touring caravan pitches together with construction of a private road) er mwyn caniatáu defnydd drwy'r flwyddyn o'r safle fel maes carafanau teithiol yn / Application under Section 73A for the variation of condition (04)(Seasonal use) of planning permission reference FPL/2021/30 change of use of existing Cartio Môn site into touring caravan site with 20 touring caravan pitches together with construction of a private road) so as to allow all year round use of site as touring caravan site at
Refused Conditions 1 doc -
Bryn Goleu, Ffordd Caergybi / Holyhead Road, Bryngwran.
Cais llawn ar gyfer addasu'r fynediad amaethyddol presennol ynghyd â chreu trac fferm yn / Full application for alterations to the existing agricultural access together with the creation of a farm track at
Granted Full applications 9 docs -
Bryn Goleu, Ffordd Caergybi / Holyhead Road, Bryngwran
Cais llawn ar gyfer codi anecs ynghyd ag estyniad i'r cwrtil preswyl yn / Full application for the erection of an annexe together with an extension to the residential curtilage at
Granted Full applications Extension 9 docs -
Bryn Goleu, Cartio Môn, Bryngwran
Cais llawn ar gyfer newid defnydd presennol safle Cartio Môn i fod yn safle carafanau teithiol â 20 llain ar gyfer carafanau teithiol ynghyd ag adeiladu ffordd breifat yn / Full application for change of use of existing Cartio Môn site into touring caravan site with 20 touring caravan pitches together with construction of a private road at
Granted Amendments 5 docs -
Bryn Goleu, Ffordd Caergybi/Holyhead Road, Bryngwran
Proposal to convert the existing outbuilding, without the need to amend the footprint, into holiday let accommodation. It is proposed that the existing outbuilding be converted into a holiday unit comprising of three double bedrooms, a bathroom, kitchen and living/ dining space. There is ample parking already available on the site.
Refused 11 docs -
Bryn Goleu, Ffordd Caergybi/Holyhead Road, Bryngwran
Cais llawn ar gyfer newid defnydd yr adeilad allanol i uned gwyliau yn / Full application for conversion of the outbuilding into a holiday unit at
Granted Full applications 12 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Decided
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at