Planning application
Rhiwlas, Amlwch.
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw offer ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed for storage of implements on land at
As published by the council, reference DAG/2025/1
Application record
- Reference
- DAG/2025/1
- Type
- Outline
- Status
- Permitted
- Decision
- Granted As published: Datblygiad Caniataëdig / Permitted Development
- Received
- 14 Apr 2025
- Validated
- 16 Apr 2025
- Decided
- 13 May 2025
- Ward
- Twrcelyn
- Parish
- Llaneilian
- Decision by
- Delegated
Timeline
Dates from the published record
-
14 Apr 2025
Received by Isle of Anglesey
-
16 Apr 2025
Validated
Checked as complete and ready for consideration.
-
13 May 2025
Decision issued: Datblygiad Caniataëdig / Permitted Development
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Isle of Anglesey granted permission on 13 May 2025, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Bryn Difyr, Nebo, Amlwch
Cais llawn ar gyfer addasu ac ehangu yn / Full application for alterations and extensions at
Granted Full applications Extension 6 docs -
Bryn Hyfryd, Nebo, Amlwch
Cais i ollwng amod (04) (Arolwg Ffotograffig) o ganiatâd cynllunio LBC/2023/7 (Caniatâd Adeilad Rhestredig ar gyfer trosi adeilad allanol yn wyliau ar osod) yn / Application to discharge condition (04) (Photographic Survey) of planning permission LBC/2023/7 (Listed Building Consent for the conversion of outbuilding into holiday let at) at
Granted Heritage and listed buildings 4 docs -
Bryn Hyfryd, Nebo, Amlwch
Cais llawn ar gyfer trosi adeilad allanol yn ty gwyliau yn / Full application for the conversion of outbuilding into holiday let at
Granted Full applications 17 docs -
Bryn Hyfryd, Nebo, Amlwch
Caniatâd Adeilad Rhestredig ar gyfer trosi adeilad allanol yn ty gwyliau yn /Listed Building Consent for the conversion of outbuilding into holiday let at
Granted Heritage and listed buildings 16 docs -
Castle Square & Chapel Street, Penysarn.
Cais i leoli arwydd gwybodaeth gyhoeddus ar y gyffordd rhwng / Application for the siting of a public information sign on the junction between
Granted Advertising 4 docs -
2 Bryn Dulas, Llaneilian
Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio HHP/2020/204 er mwyn diwygio'r dyluniad yn / Minor amendments to scheme previously approved under planning permission HHP/2020/204 so as to amend the design at
Granted Amendments 8 docs
Other outline applications
In Isle of Anglesey
-
GWY/2026/2 Decided
Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP
Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.
-
OP/2025/1 Granted
Llanfawr Road, Caergybi / Holyhead.
Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at