Skip to content
PlanIndex Get alerts
Menu

Planning application

Bonolwyn Groes, Llantristant

Status unknown Isle of Anglesey DAG/2024/13 Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Cais i bennu os oes angen caniatâd ymlaen llaw ar gyfer tanc storio cylchol symudol ȃ gorchudd ar gyfer storio cynnyrch gwrtaith hylifol dros dro ar dir yn / Application to determine whether prior approval is required for a mobile cylindrical covered storage tank for the temporary storage of liquid fertiliser products on land at

As published by the council, reference DAG/2024/13

Application record

Reference
DAG/2024/13
Type
Outline
Received
23 Sep 2024
Validated
29 Nov 2024
Ward
Talybolion
Parish
Tref Alaw
Decision by
Delegated

Timeline

Dates from the published record

  1. 23 Sep 2024

    Received by Isle of Anglesey

  2. 29 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 16 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 January 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Isle of Anglesey took a median of 71 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Checking the current position

The published feed does not show a live status for this application; the register on Isle of Anglesey's own portal holds the authoritative version.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline