Skip to content
PlanIndex Get alerts
Menu

Planning application

Caravan, Four Winds, Llangoed

Granted Isle of Anglesey DAG/2023/25 Outline

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais i bennu os oes angen caniatad blaenorol i godi 'polytunnel' dwbwl ar gyfer defnydd storio ar dir / Application to determine whether prior approval is required for the erection of a double polytunnel for storage purposes on land at

As published by the council, reference DAG/2023/25

Application record

Reference
DAG/2023/25
Type
Outline
Status
Permitted
Decision
Datblygiad Caniataëdig / Permitted Development
Received
12 Dec 2023
Validated
12 Dec 2023
Decided
27 Dec 2023
Ward
Seiriol
Parish
Llangoed
Decision by
Delegated

Timeline

Dates from the published record

  1. 12 Dec 2023

    Received by Isle of Anglesey

  2. 27 Dec 2023

    Decision issued: Datblygiad Caniataëdig / Permitted Development

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Four Winds, Llangoed

    LUE/2022/4 Submitted 25 Mar 2022 0m away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer y defnydd presennol o garafán statig at ddefnydd preswyl yn / Application for a Lawful Development Certificate for the existing use of a static caravan for residential use at

    Decided Amendments 15 docs
  • Caravan, Four Winds, Llangoed

    DAG/2023/22 Submitted 6 Nov 2023 0m away

    Cais i bennu os oes angen caniatad blaenorol i godi 'polytunnel' dwbwl ar dir / Application to determine whether prior approval is required for the erection of a double polytunnel on land at

    Decided Outline 3 docs
  • 4, Tyddyn Waen Terrace, Llangoed

    HHP/2026/45 Submitted 11 Mar 2026 175m away

    Cais llawn ar gyfer dymchwel darn o'r brif annedd a'r modurdy presennol ynghyd a addasu ac ehangu a codi modurdy newydd arwahan ynghyd a swyddfa uwchben yn / Full application for demolition of part of the existing dwelling and garage together with alterations and extensions and erection of a detached garage and office above at

    Granted Householder Extension Demolition 11 docs
    Domestic
  • Tyddyn Waen, Llangoed, Biwmares/Beaumaris.

    HHP/2023/191 Submitted 4 Sep 2023 199m away

    Cais llawn ar gyfer addasu ag ehangu, ynghyd a chodi garej newydd yn / Full application for alterations and extensions, together with the erection of a new garage at

    Granted Full applications Extension 6 docs
  • 2 Tan Y Marian, Mariandyrys, Llangoed, Biwmares / Beaumaris

    HHP/2022/22 Submitted 26 Jan 2022 491m away

    Cais llawn ar gyfer addau ac ehangu /Full application for alterations and extensions

    Granted Full applications Extension 5 docs

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • SCR/2026/20 Decided

    Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

    Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

    17 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to

    20 Nov 2025 Outline