Planning application
Caravan, Four Winds, Llangoed
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Cais i bennu os oes angen caniatad blaenorol i godi 'polytunnel' dwbwl ar gyfer defnydd storio ar dir / Application to determine whether prior approval is required for the erection of a double polytunnel for storage purposes on land at
As published by the council, reference DAG/2023/25
Application record
- Reference
- DAG/2023/25
- Type
- Outline
- Status
- Permitted
- Decision
- Datblygiad Caniataëdig / Permitted Development
- Received
- 12 Dec 2023
- Validated
- 12 Dec 2023
- Decided
- 27 Dec 2023
- Ward
- Seiriol
- Parish
- Llangoed
- Decision by
- Delegated
Timeline
Dates from the published record
-
12 Dec 2023
Received by Isle of Anglesey
-
27 Dec 2023
Decision issued: Datblygiad Caniataëdig / Permitted Development
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
Four Winds, Llangoed
Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer y defnydd presennol o garafán statig at ddefnydd preswyl yn / Application for a Lawful Development Certificate for the existing use of a static caravan for residential use at
Decided Amendments 15 docs -
Caravan, Four Winds, Llangoed
Cais i bennu os oes angen caniatad blaenorol i godi 'polytunnel' dwbwl ar dir / Application to determine whether prior approval is required for the erection of a double polytunnel on land at
Decided Outline 3 docs -
4, Tyddyn Waen Terrace, Llangoed
Cais llawn ar gyfer dymchwel darn o'r brif annedd a'r modurdy presennol ynghyd a addasu ac ehangu a codi modurdy newydd arwahan ynghyd a swyddfa uwchben yn / Full application for demolition of part of the existing dwelling and garage together with alterations and extensions and erection of a detached garage and office above at
Granted Householder Extension Demolition 11 docsDomestic -
Tyddyn Waen, Llangoed, Biwmares/Beaumaris.
Cais llawn ar gyfer addasu ag ehangu, ynghyd a chodi garej newydd yn / Full application for alterations and extensions, together with the erection of a new garage at
Granted Full applications Extension 6 docs -
2 Tan Y Marian, Mariandyrys, Llangoed, Biwmares / Beaumaris
Cais llawn ar gyfer addau ac ehangu /Full application for alterations and extensions
Granted Full applications Extension 5 docs
Other outline applications
In Isle of Anglesey
-
SCR/2026/21 Decided
System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch
Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at
-
SCR/2026/13 Decided
Crud Yr Awel, Llanfaethlu.
Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at
-
DAG/2026/10 Granted
Rhyd Goch, Llanfaethlu
Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at
-
SCR/2026/20 Decided
Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge
Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at
-
OP/2025/9 Granted
Craig Owen, Llanbedrgoch
Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to