Skip to content
PlanIndex Get alerts
Menu

Planning application

Caeau Gwynion Farm, Niwbwrch / Newborough

Granted Isle of Anglesey DAG/2023/24 Outline

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw anifeiliaid ar dir ger / Application to determine whether prior approval is required for the erection of an agricultural shed to accommodate livestock on land adjacent to

As published by the council, reference DAG/2023/24

Application record

Reference
DAG/2023/24
Type
Outline
Status
Permitted
Decision
Datblygiad Caniataëdig / Permitted Development
Received
8 Dec 2023
Validated
18 Dec 2023
Decided
12 Jan 2024
Ward
Bro Aberffraw
Parish
Rhosyr
Decision by
Delegated

Timeline

Dates from the published record

  1. 8 Dec 2023

    Received by Isle of Anglesey

  2. 18 Dec 2023

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jan 2024

    Decision issued: Datblygiad Caniataëdig / Permitted Development

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Isle of Anglesey granted permission on 12 January 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Gwelfor, Niwbwrch / Newborough

    FPL/2023/239 Submitted 25 Aug 2023 195m away

    Cais llawn i leoli arae paneli solar yn cynnwys 20 panel solar (8kw) ar dir yn / Full application for the siting of a solar panel array consisting of 20 solar panels (8kw) on land at

    Granted Full applications 6 docs
  • Cefn Mawr Uchaf , Llangaffo

    FPL/2022/110 Submitted 11 Apr 2022 249m away

    Cais llawn ar gyfer newid defnydd tir amaethyddol i osod i bwrpas 28 carafannau symydol ynghyd a fynedfa i gerbydau â gwaith cysylltiedig yn / Full application for change of use of agricultural land to holiday let for 28 touring caravans together with a new vehicle access and associated works at

    Withdrawn Amendments 16 docs
  • Cefn Mawr Uchaf , Llangaffo

    FPL/2022/177 Submitted 8 Jul 2022 249m away

    Cais llawn ar gyfer newid defnydd tir amaethyddol i sefydlu 28 carafannau symydol ynghyd a fynedfa i gerbydau â gwaith cysylltiedig yn / Full application for change of use of agricultural land for 28 touring caravans together with a new vehicle access and associated works at

    Granted Amendments 19 docs

In Isle of Anglesey

  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    1 May 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    12 Mar 2026 Outline
  • DAG/2026/10 Granted

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    22 Apr 2026 Outline
  • SCR/2026/20 Decided

    Clwb Rygbi, Ffordd Mona, Porthaethwy / Rugby Club, Mona Road, Menai Bridge

    Barn sgrinio i leoli cynhwysydd a lloches yn / Screening opinion for the siting of a container and shelter at

    17 Apr 2026 Outline
  • OP/2025/9 Granted

    Craig Owen, Llanbedrgoch

    Cais amlinellol ar gyfer codi annedd gyda manylion y fynedfa a'r holl faterion eraill wedi eu cadw'n ôl ar dir ger / Outline application for the erection of a dwelling together with details of access with all other matters reserved on land adjacent to

    20 Nov 2025 Outline