Granted Isle of Anglesey DAG/2020/13 Outline

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Cais i bennu os oes angen caniatâd blaenorol ar gyfer gosod traciau amaethyddol ar dir yn / Application to determine whether prior approval is required for the laying of agricultural tracks on land at

As published by the council, reference DAG/2020/13

Application record

Reference
DAG/2020/13
Type
Outline
Status
Permitted
Decision
Granted As published: Datblygiad Caniataëdig / Permitted Development
Received
19 Aug 2020
Validated
27 Aug 2020
Decided
16 Sep 2020
Ward
Twrcelyn
Parish
Llaneilian
Decision by
Delegated

Timeline

Dates from the published record

  1. 19 Aug 2020

    Received by Isle of Anglesey

  2. 27 Aug 2020

    Validated

    Checked as complete and ready for consideration.

  3. 16 Sep 2020

    Decision issued: Datblygiad Caniataëdig / Permitted Development

  4. 30 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Isle of Anglesey granted permission on 16 September 2020, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Coch Y Moel, Penysarn.

    FPL/2024/256 Submitted 12 Sep 2024 0.3 miles away

    Cais llawn ar gyfer dymchwel yr annedd bresennol ynghyd a chodi annedd newydd yn / Full application for demolishing the existing dwelling together with the erection of a replacement dwelling at

    Granted Full applications 14 docs
    Domestic
  • Tyn Rhos, Penysarn.

    LUE/2025/19 Submitted 2 May 2025 0.3 miles away

    Cais am Dystysgrif Datblygiad Cyfreithlon ar gyfer defnydd presennol o'r tir fel safle tymhorol ar gyfer 40 carafanau teithiol a phebyll ers dros 10 mlynedd yn / Application for a Lawful Development Certificate for the existing use of the land as a seasonal site for 40 touring caravans and tents for over 10 years at

    Granted Lawful development 5 docs

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Decided

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline