SOLAR FARM, , CAERGYBI / SOLAR FARM, , HOLYHEAD

Decided Isle of Anglesey CONS/2019/2 Consultation

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Ymgynghoriad ar Farn Sgopio ar gyfer adeiladu fferm arae solar 75MW ynghyd ag offer a isadeiledd cysylltiedig a gwaith ategol ar dir ger / Consultation on Scoping Opinion for the construction of a 75MW solar array farm together with associated equipment, infrastructure and ancillary works on land adjacent to

As published by the council, reference CONS/2019/2

Application record

Reference
CONS/2019/2
Type
Consultation
Status
Closed
Decision
Barn wedi’i roi / Advice Given
Received
7 Jun 2019
Validated
7 Jun 2019
Decided
6 Jun 2019
Ward
Crigyll
Parish
Bryngwran
Decision by
Dirprwyedig / Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 2 applications since 2019.

  • DNS/3217391 Decided

    SOLAR FARM, , CAERGYBI / SOLAR FARM, , HOLYHEAD

    Datblygiad o Arwyddocâd Cenedlaethol (DAC) i Weinidogion Cymru ar gyfer Fferm solar ffotofoltäig arfaethedig ar y ddaear, ynghyd ag offer cysylltiedig, seilwaith, cysylltiad grid a gwaith ategol yn / Development of National Significance (DNS) to the Welsh Ministers for Proposed ground mounted photo voltaic solar farm, together with associated equipment, infrastructure, grid connection and ancillary works at

    Submitted 11 Apr 2022

Timeline

Dates from the published record

  1. 6 Jun 2019

    Decision issued: Barn wedi’i roi / Advice Given

  2. 7 Jun 2019

    Received by Isle of Anglesey

  3. 5 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Isle of Anglesey

  • GWY/2026/2 Decided

    Tir yn a ger yr hen Safle Ferodo / Land At And Adjacent To The Former Ferodo Site, Griffiths Crossing, Caernarfon, LL55 1TP

    Cais amlinellol gyda holl faterion wedi eu cadw'n ol ar gyfer dymchwel adeiladau a strwythurau presennol, ailraddio'r tir a codi adeilad canolfan data (B8) ynghyd a chyfarpar cysylltiol i gynnwys generaduron, peirianwaith, cyfarpar, is-orsaf(oedd), mynedfeydd, parcio ac ardaloedd gwasanaethu, gwaith draenio a peirianyddol gan gynnwys cysylltu ac ail-leoli gwasanaethau / Outline application will all matters reserved for the demolition of existing buildings/structures, re-grading of land and erection of Class B8 data centre building(s) with all associated back-up generators, plant, equipment, sub-station(s), accesses, parking and servicing areas, drainage and engineering works, including services diversion/connection.

    Received 2 Sep, published by the council 16 Sep 2026 Outline
  • OP/2025/1 Granted

    Llanfawr Road, Caergybi / Holyhead.

    Cais amlinellol ar gyfer codi 9 annedd fforddiadwy yn cynnwys manylion llawn o'r mynedfa, ymddangosiad, gosodiad a graddfa ar dir ger / Outline application for the erection of 9 affordable dwellings which includes full details of access, appearance, layout and scale on land near

    Received 30 Jan, published by the council 16 Sep 2026 Outline
  • SCR/2026/21 Decided

    System storio ynni batri, Rhosgoch / Battery energy storage system, Rhosgoch

    Barn sgrinio ar gyfer gosod cebl o dan y ddaear i gysylltu â’r grid (safle Wylfa) i wasanaethu’r System Storio Ynni Batri a gymeradwywyd yn flaenorol ynghyd ag adeiladu a chodi isbwerdy, gorsafoedd trawsnewid a gwaith datblygu cysylltiedig yn / Screening opinion for the installation of a underground grid connection cable (at Wylfa site) to serve previously approved Battery Energy Storage System together with the construction and erection of a substation, transformer stations and associated development at

    Received 1 May, published by the council 6 Aug 2026 Outline
  • SCR/2026/13 Decided

    Crud Yr Awel, Llanfaethlu.

    Barn sgrinio ar gyfer gosod paneli solar ar y ddaear yn / Screening opinion for the installation of ground mounted solar panels at

    Received 12 Mar, published by the council 6 Aug 2026 Outline
  • DAG/2026/10 Decided

    Rhyd Goch, Llanfaethlu

    Cais i bennu os oes angen caniatâd blaenorol ar gyfer codi sied amaethyddol ar gyfer cadw peiriannau ar dir yn / Application to determine whether prior approval is required for the erection of an agricultural shed to store machinery on land at

    Received 22 Apr, published by the council 6 Aug 2026 Outline