Planning application
Christs College Farm Green Lane Upton Huntingdon PE28 5YE
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing barn and stables & erection of five new dwellings with associated works
As published by the council, reference 26/01761/FUL
Application record
- Reference
- 26/01761/FUL
- Category
- Full applications
- Status
- In progress
- Received
- 23 Sep 2026
- Validated
- 23 Sep 2026
- Ward
- Alconbury
- Parish
- Upton And Coppingford
- Postcode
- PE28 5YE
Timeline
Dates from the published record
-
23 Sep 2026
Received by Huntingdonshire
-
29 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Huntingdonshire took a median of 60 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Campbell McCrae Ltd Agent, registered in Huntingdon
Active · incorporated 2011 · Huntingdon
111 applications on PlanIndex · across 5 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordWhat happens while it is decided
This application is with Huntingdonshire for determination, against a statutory target of eight weeks. Over the last year Huntingdonshire decided full applications in a median of 109 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
3 Green Lane Upton Huntingdon PE28 5YE
Erection of a single storey extension
Granted Householder Extension 20 docsSmall domestic -
Stangate House Green Lane Upton Huntingdon PE28 5YE
Proposed garage and porch extension.
Refused Householder Extension 20 docsSmall domestic -
Crows Nest Main Street Upton Huntingdon PE28 5YB
Proposed first floor rear extension and conversion of existing glazed conservatory to garden room with tiles pitched roof
Granted Householder Extension Windows or glazing 21 docsSmall domestic -
Hill Rise Cottage Main Street Upton Huntingdon PE28 5YB
Installation of air source heat pump unit to front elevation.
Granted -
The Old Forge Main Street Upton Huntingdon PE28 5YB
Discharge of Condition 5 (Preliminary Roost Assessment) for 23/02485/HHFUL
Granted Conditions 3 docs -
Southfields Main Street Upton Huntingdon PE28 5YF
Removal of existing garden room and replace with smaller Utility Room. Replacement windows with lower height windows on front elevation and repositioning of front door.
Granted Lawful development Windows or glazing 9 docs
Other full applications
In Huntingdonshire
-
26/01048/FUL Refused
Fields View Fenstanton Road Hilton PE28 9JA
Demolition of the existing cattery and kennels buildings and the erection of 4 detached dwellings, together with associated works including access and infrastructure
-
26/01472/FUL Granted
Stonely House 37 Main Road Stonely St Neots PE19 5EH
Partial rebuild of rear extension and repositioning of first floor window
-
26/00684/FUL Granted
6 Broadway Shopping Centre Malting Square Yaxley Peterborough PE7 3JJ
Conversion of first-floor storage unit to self-contained residential flat
-
26/01252/FUL Granted
Blue Diamond Banks End Wyton Huntingdon PE28 2AA
Change of use of land from a car wash and valet facility (approved under 15/01059/FUL) to an outdoor adventure golf course ancillary to Blue Diamond Garden Centre (Retrospective)
-
26/00921/FUL Granted
3 Redwongs Way Huntingdon PE29 7HF
2no proposed single storey extensions: Staging area/Dock Shelter to front elevation incorporating a 2no HGV docking stations. Air lock to front elevation and access into adjacent existing yard area. 1no lean to shelter construction for forklift charging. Replacement of existing pedestrian door along NE facing elevation. New reinforced concrete slab area within existing yard to site IBC's on top. Reconfiguration of waste storage within the yard, with addition of 1no closed compactor skip.