Planning application
Bedford Borough Council Borough Hall Cauldwell Street Bedford MK42 9AP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a 100.7m high wind turbine with associated infrastructure (Transformer, access road, cabling etc)
As published by the council, reference 25/01168/COA
Application record
- Reference
- 25/01168/COA
- Type
- Consultations from Other Authorities
- Status
- In progress
- Received
- 26 Jun 2025
- Validated
- 26 Jun 2025
- Postcode
- MK42 9AP
Site history
Applications at this address on the Huntingdonshire register
This site has had 3 applications since 2025.
-
26/01236/COA Decided
Bedford Borough Council Borough Hall Cauldwell Street Bedford MK42 9AP
Outline application (all matters reserved) for a mixed use phased and severable development, comprising residential (Use Class C2 and C3) development of up to 4,400 dwellings; commercial (Use Classes E, F1, F2, C1 and Sui Generis); public open space including sport and play facilities; education facilities comprising primary and secondary school provision (Use Class F1(a)); provision of Biodiversity Net Gain; transport and access infrastructure; a safeguarding zone for the delivery of East West Rail; retention, renovation and reuse of the on-site historic assets; and associated demolitions, parking, servicing, utilities, footpath and cycle links, drainage and other infrastructure.
-
25/01966/COA Awaiting decision
Bedford Borough Council Borough Hall Cauldwell Street Bedford MK42 9AP
Adjacent Parish Consultation from BBC - Request for Scoping Opinion in accordance with the Town and Country Planning (EIA) Regulations 2017 prior to the submission of a proposed hybrid application: (Mixed use development comprising up to 1,000 dwellings; a 2 form entry primary school including early years provision; 2no. watersports lakes with associated infrastructure including buildings and parking; up to 1,000sqm of retail floorspace (use class E(a)); a mobility hub; pedestrian and cycle routes including links to the existing network; open space including landscaping, habitat creation and play areas; highway accesses from A603; and all ancillary drainage and engineering works (outline planning application for phased development with all matters reserved except means of vehicular access and design of watersports lakes) Land To The North Of Bedford Road Willington Bedfordshire
Timeline
Dates from the published record
-
26 Jun 2025
Received by Huntingdonshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Huntingdonshire took a median of 61 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Huntingdonshire for determination, against a statutory target of eight weeks. Over the last year Huntingdonshire's median decision took 61 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Huntingdonshire's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Bedford Borough Council Borough Hall Cauldwell Street Bedford MK42 9AP
90% historically approved · decision due ~20 Nov
Adjacent Parish Consultation from BBC - Request for Scoping Opinion in accordance with the Town and Country Planning (EIA) Regulations 2017 prior to the submission of a proposed hybrid application: (Mixed use development comprising up to 1,000 dwellings; a 2 form entry primary school including early years provision; 2no. watersports lakes with associated infrastructure including buildings and parking; up to 1,000sqm of retail floorspace (use class E(a)); a mobility hub; pedestrian and cycle routes including links to the existing network; open space including landscaping, habitat creation and play areas; highway accesses from A603; and all ancillary drainage and engineering works (outline planning application for phased development with all matters reserved except means of vehicular access and design of watersports lakes) Land To The North Of Bedford Road Willington Bedfordshire
Awaiting decision 1 docDomestic -
Bedford Borough Council Borough Hall Cauldwell Street Bedford MK42 9AP
Outline application (all matters reserved) for a mixed use phased and severable development, comprising residential (Use Class C2 and C3) development of up to 4,400 dwellings; commercial (Use Classes E, F1, F2, C1 and Sui Generis); public open space including sport and play facilities; education facilities comprising primary and secondary school provision (Use Class F1(a)); provision of Biodiversity Net Gain; transport and access infrastructure; a safeguarding zone for the delivery of East West Rail; retention, renovation and reuse of the on-site historic assets; and associated demolitions, parking, servicing, utilities, footpath and cycle links, drainage and other infrastructure.
DecidedMajor scheme -
South Bank Arts Centre Bedford College Cauldwell Street Bedford Bedfordshire MK42 9AH
80% historically approved · decision due ~2 Jul
Installation of an Air Source Heat Pump system.
Awaiting decision Full applications 12 docs -
Bedford College 25 Cauldwell Street Bedford MK42 9AH
Three storey extension to include gym, classrooms, changing rooms and ancillary facilities.
Granted Full applications Extension -
Express By Holiday Inn Wilstead Road Elstow Bedford Bedfordshire MK42 9BB
Prior notification for the installation, alteration or replacement on non-domestic properties of (a) micro-generation solar thermal equipment; (b) micro-generation solar PV equipment; or (c) other solar PV equipment on the roof.
Decided -
Unit 5A Riverside Square Bedford Bedfordshire MK40 1AS
77% historically approved · decision due ~3 Dec
Installation of 3 internally illuminated fascia signs and 1 internally illuminated projecting sign.
Awaiting decision Advertising